Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4807

Received: 17/03/2023

Respondent: Rydon Homes Limited

Agent: DMH Stallard LLP

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

In regards to Policy H3 regarding a Non-Strategic Parish Housing Requirement, we object to the proposed quantum of homes (50 homes) for Boxgrove Parish.

Policy H3 references ‘non-strategic parish housing requirements’, referring to ‘small scale housing sites’. The largest quantum of homes within Policy H3 is 75 additional homes for Wisborough Green. In contrast the lowest quantum of new homes under Policy H2 is 220 new homes at Loxwood. We feel that if Policy H2 defines a strategic level of growth as a minimum of 220 new homes, then Policy H3 should plan for a higher quantum of growth than 75 additional homes.

Change suggested by respondent:

We feel that the quantum of homes should be significantly higher, as outlined in our comments on Policy H2.

Full text:

In regards to Policy H3 regarding a Non-Strategic Parish Housing Requirement, we object to the proposed quantum of homes (50 homes) for Boxgrove Parish.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4872

Received: 17/03/2023

Respondent: Gladman Developments Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Gladman strongly disagree with the Council providing no new housing allocations in Birdham which is a Tier 3 Service Village. In the Preferred Approach consultation document, Birdham was allocated to deliver 125 new homes over the local plan period and now it is allocated to deliver 0 homes over the plan period.

Change suggested by respondent:

Further housing growth in Birdham.

Full text:

Gladman strongly disagree with the Council providing no new housing allocations in Birdham which is a Tier 3 Service Village. In the Preferred Approach consultation document, Birdham was allocated to deliver 125 new homes over the local plan period and now it is allocated to deliver 0 homes over the plan period.

There have been a few planning applications submitted for residential development in Birdham over the past few years. Gladman’s planning application at land off Main Road, Birdham is waiting to be reported to Chichester’s Planning Committee. The application site is highly sustainable and logical site in the district which is not currently subject to an adopted allocation or a draft allocation. In light of this conclusion, it seems illogical that the Council will not allocate any further housing growth to a highly sustainable settlement which can accommodate additional housing growth. This will ultimately result in affordability rising across the district and most notably in the northern area of the district.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4895

Received: 17/03/2023

Respondent: Willowfield Farm

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

The Examiner of Bosham's plan suggested that residents would still have a say in where housing was allocated within the village. That has bot happened with no consultation with landowners or residents other than to propose one single site. Residents voted to accept the modifications based on teh inspectors comments which to date have not been upheld.

Change suggested by respondent:

Bosham needs a consultation since its allocation has gone from 50-300 without any resident input about where these might be allocated. Residents accepted that the Parish Council could not finish the plan but thought that they would still be consulted on where they wanted houses or at least that the previous consultation (adopted document) would be given due weight.

Full text:

The Examiner of Bosham's plan suggested that residents would still have a say in where housing was allocated within the village. That has bot happened with no consultation with landowners or residents other than to propose one single site. Residents voted to accept the modifications based on teh inspectors comments which to date have not been upheld.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4912

Received: 17/03/2023

Respondent: Mr Graham Pick

Agent: Batcheller Monkhouse

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Birdham Housing Needs Assessment estimated a need for 69 affordable dwellings between 2020-2035. Open market housing will be needed to deliver many of these.

Given the unaddressed housing need that also exists within the wider district, it is reasonable to assume that much of the A27 capacity issues can be attributed to commuting traffic caused by a lack of available local housing. By providing housing in locations with good public transport connections and where cycling to work is a realistic option, commuting traffic can be reduced.

Change suggested by respondent:

Assign a housing figure to Birdham to reflect the housing need.

Full text:

Policy H3 prescribes each parish with a housing figure, many of which has been significantly reduced from the previous iteration of the draft Local Plan. In relation to Birdham, the figure has been reduced from 125 to zero.

As part of the preparation of the Birdham Neighbourhood Plan a parish housing needs assessment was undertaken. A report by AECOM on the assessment findings was published in January 2021. The report estimated a need for 43 affordable rented properties over the plan period (2020-2035), or 3 dwellings per year. The report also estimated a need for 26 shared ownership dwellings.

This quantum of affordable housing provision is more likely to be provided as a proportion of an open market housing scheme. On the basis of 30% of units provided as affordable houses, 230 houses would need to be built between 2020 and 2035 to ensure this number of affordable homes are delivered. A housing figure closer to this number for the parish of Birdham should be considered.

Whilst the Local Plan cites A27 capacity issues as the reason for reduced housing provision on the peninsula, housing need remains high. Given the unaddressed housing need that also exists within the wider district, it is reasonable to assume that much of the capacity issues can be attributed to commuting traffic caused by a lack of available local housing. By providing housing in locations with good public transport connections and where cycling to work is a realistic option, commuting traffic can be reduced.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4941

Received: 17/03/2023

Respondent: Gladman Developments Ltd

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Gladman promoting an omission site to the Draft Chichester Local Plan. Land off Main Road, Birdham. 150 dwellings.

Change suggested by respondent:

Gladman promoting an omission site to the Draft Chichester Local Plan.

Full text:

Gladman are promoting land off Main Road, Birdham for residential development. The site can accommodate a scheme of up to 150 dwellings and is in an entirely suitable and sustainable location to accommodate growth. Figure 1 sets out the location plan of the site, while a development framework plan is included in Appendix of this representation.

The site was assessed as being ‘Developable’ in the Chichester Housing and Economic Land Availability Assessment 2021 (HELAA ref: HBI00029/29a). The site was concluded by the Council to be suitable, available and achievable and there are no known constraints that would make the development unachievable in principle. Estimated timescales for delivery would be 0-5 years. Gladman fully support the Council’s assessment of the site.

The site has good access to social and community infrastructure that would be expected of an edge of settlement location, is not subject to any insurmountable technical or environmental constraints and can accommodate a high-quality residential development that will address identified market and affordable housing needs. The site can deliver a wide range of market and affordable homes to meet Chichester’s existing needs general and specialist housing needs and would be able to deliver quickly, without the need for significant infrastructure, within the early part of the plan period. The site represents one of the few opportunities to deliver development outside of the Chichester Harbour Area of Outstanding Natural Beauty location in the authority and thus the potential for development here should be maximised. Gladman currently have a ‘live’ outline planning application on the site which was submitted to Chichester District Council in June 2021 (application ref: 21/01830/OUT). At the time of writing, the application remains under consideration by the Council.

The remainder of this section describes the site’s suitability for residential development in further detail, taking account of the technical studies that have been undertaken to support the delivery of the site to date.

New Homes
The site can deliver a wide range of market and affordable homes to meet the district’s general and specialist housing needs and would be able to deliver quickly, without the need for significant infrastructure, within the early part of the plan period. Gladman can confirm that the site can deliver a provision of affordable housing on-site in accordance with local planning policy. This is a significant benefit given the significant level of need for affordable housing across Chichester district.

Community Facilities and Viability
Proportionate developer contributions towards the delivery of new community infrastructure would be provided alongside any proposals. Gladman will agree requests for developer contributions which meet the relevant requirements of paragraph 57 of the NPPF and CIL regulations 122 and 123. Gladman would be pleased to agree an initial set of Heads of Terms with Chichester District Council.

Open Space and Green Infrastructure
The illustrative Development Framework Plan which supports the application demonstrates how the built development will be set within a framework of open space and green infrastructure. The green space will include a formal locally equipped children’s play area (LEAP), informal open space and a community park. The proposal seeks to retain existing landscape features; enhance the existing hedgerows and where possible any loss will be mitigated elsewhere on site. The illustrative Development Framework Plan incorporates these elements within a strategic landscape framework. Generous areas of informal and formal open space will underpin the proposals for the site. The total area of open space provided as part of the site’s development would meet Chichester District Council’s requirements.

Flood Risk Mitigation
Technical work undertaken to date has confirmed that the site is located within Flood Zone 1 (the area at the lowest risk of flooding). The site, therefore, can be developed safely in relation to flood risk and flooding would not pose a constrain to the development of the site.
A comprehensive Flood Risk Assessment (FRA) has previously been prepared for the site which demonstrated that the development of the site would be safe for its lifetime taking account of the vulnerability of its users, without increasing flood risk elsewhere, and, where possible, can reduce flood risk overall. SUDs features incorporated in the development will not only operate technically to reduce flood risk, but could also be used to enhance the onsite biodiversity and will be incorporated into the usable green infrastructure to help create high-quality open spaces. Furthermore, site specific information has been provided to the council to demonstrate that the site is at negligible risk of groundwater flooding.

Demonstrating nitrate neutrality
The development is located outside of the Chichester Harbour AoNB and naturally drains in a southerly direction. Through the evidence provided in the Flood Risk Assessment and Habitats Regulations Assessment, the development would not create any nitrate waste into the Chichester Harbour protected area.

Highways and Sustainable Transport
The site is accessed from Main Road, via a simple priority junction. It has been confirmed that the required visibility splays can be achieved and that the site access junction will operate comfortably within capacity in both the morning and evening peak periods with the proposed development traffic as demonstrated by the Transport Assessment supporting the ‘live’ application. West Sussex County Council Highways Team have raised no objection in response to the current application on the site in relation to expected traffic capacity impacts and available junction capacity.

The site benefits from good pedestrian connectivity to the village of Birdham. There are a good range of local amenities and facilities which can be accessed on foot, by cycle or by public transport within nationally recognised acceptable walking and cycling distances. These include, but are not limited to: Nisa Local Shop, Birdham Post Office, Birdham CofE Primary School, Birdham Marina and St James Community Centre which are all within the CIHT ‘preferred maximum walking distance’ guidance.

The site is situated on the existing local bus network with stops located along Main Road. Due to the proximity of the existing transport network, it would be appropriate to assume bus to be the most accessible and efficient sustainable transport system for future residents. The no. 52 bus serves The Witterings and Birdham to Chichester City running every 30 minutes. The service provides commutable journey times to Chichester with buses starting at 06:58 and returning as late as 22:13.
It is possible for future residents of the proposed scheme to easily access sustainable public transport options to further afield via Chichester Bus Station or Chichester Train Station. Both are easily accessible utilising the no. 52 bus service.

Public Rights of Way
The proposals seek to enhance the green gateway to the wider countryside and provide improvements to the existing Public Rights of Way (PRoW). Footpath (FP) 48 currently runs to the north of the site and continues to the east towards Sidlesham Lane. This route features in the Green Links across the Manhood’s (GLaM) statement as GLaM route 8, identified as Mapsons Lane, which is earmarked to be upgraded from an existing farm track to a bridleway. FP48 is of particular importance within Birdham as it connects to the Salterns Way, a Chichester to West Wittering cycle way (via Crooked Lane) in one direction and to Sidlesham Lane / Batchmere Road in the other which leads to Bracklesham and East Wittering. However, the land required to undertake these improvements falls within private ownership, so this aspiration has to date been undeliverable.

As part of the development proposals, Gladman is proposing to upgrade the existing FP48/GlaM Route 8 to a minimum 3 metre width and to an agreed specification. Improvements to FP48/GLaM Route 8 could be secured via planning condition, likely requiring the work to begin prior to the occupation of an agreed quantum of housing.

In conclusion, there are no outstanding technical objections on the site identified by statutory consultees through the submission of the current ‘live’ planning application on the site. Alongside the delivery of affordable housing, development of the site will offer the opportunity to deliver a number of other benefits, including:
• A commitment to deliver a high-quality development through the inclusion of a design code, which sets a benchmark for further reserved matters applications;
• Significant areas of attractive and diverse greenspace for new and existing local residents including the provision of a community park and a village green;
• Provision of play areas plus recreational footpaths within the site that would be publicly accessible to new and existing residents;
• Securing net gains in biodiversity through the provision of vast green infrastructure and new wildlife habitats and retention and enhancement of existing ones;
• Improvements to local cycle routes, footpaths and PRoW, delivering GLaM Route 8 to a specification that will enable this to become a dedicated Bridleway; and
• An economically active population generating total gross expenditure of approximately £5.4million annually, benefiting the local economy.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5021

Received: 16/03/2023

Respondent: Domusea

Agent: Smith Simmons Partners

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Policy H3 identifies non-strategic parish allocations. We have explained above our queries with the 25 dwelling allocation to Plaistow & Ifold, whether it has allowed for the non-implementation of the 10 units in the last 2015 Plan and why it compares so unfavourably with much higher levels of development for the other service villages in the NE part of the district.
We would also query why the options outlined in the PINS advisory visit of 2021 have not been more thoroughly tested for increased housing provision in the north part of the district to increase the supply of housing to meet OAN. There is no updated Settlement Hierarchy background paper, and the revised housing distribution has not been justified anywhere in the evidence base for the Regulation 19 Local Plan.

Change suggested by respondent:

The role and impact of existing unimplemented commitments in the housing land supply on the proposed non-strategic allocations in H3 requires further clarification in lower case policy text.

Full text:

The ‘tests of soundness’ for Local Plan preparation are set out in paragraph 35 of the July 2021 NPPF. They require the 2021-39 Local Plan to have been:

• Positively prepared – providing a strategy which, as a minimum, seeks to meet the area’s objectively assessed needs; and is informed by agreements with other authorities, so that unmet need from neighbouring areas is accommodated where it is practical to do so and is consistent with achieving sustainable development;

• Justified – an appropriate strategy, taking into account the reasonable alternatives, and based on proportionate evidence;

• Effective – deliverable over the plan period, and based on effective joint working on cross-boundary strategic matters that have been dealt with rather than deferred, as evidenced by the statement of common ground; and

• Consistent with national policy – enabling the delivery of sustainable development in accordance with the policies in this Framework.

Local Plan reviews are a legal requirement every 5 years in accordance with Regulation 10A of the 2012 Town and Country Planning (Local Planning) (England) Regulations. The Regulation 19 Plan is not legally compliant as it has not been reviewed within 5 years of the last Plan adopted in July 2015. It is also disappointing that the failure of the current Regulation 19 Local Plan to meet objectively assessed need (OAN) of 638 dpa outside the national park has not been properly evidenced in any up to date statement of common ground with neighbouring authorities with regards to the ‘duty to cooperate’.

At this stage we believe the Plan as drafted therefore fails the positively prepared, effective, and consistent with national planning policy tests.

Duty to Cooperate

The 2014-2029 Local Plan adopted in 2015 does not meet the full objectively assessed housing needs for the area. But it did recognise that future proposals to improve the capacity of the A27 and wastewater treatment works could facilitate additional housing growth. For this reason, it committed the Council to a review of the Plan within five years to ensure that housing needs could be met. That undertaking to review within 5 years was not met.

In 2021 the Council invited an advisory visit from PINS to advise on how the present Local Plan should be prepared. The inspector advised that if the Plan was prepared which did not meet the full housing needs of the area, it would have to show that it had followed the duty to co-operate with neighbouring authorities in maximising the effectiveness of plan preparation.

The inspector said the Duty to Cooperate was therefore critical in the preparation of the Local Plan Review. At the time of the meeting, the council said discussions with neighbouring authorities had been carried out on the basis that the Local Plan Review would meet the full objectively assessed housing needs (OAN) for the area. However if this was not the case, the inspector said evidence of constructive, active, and on-going engagement to determine whether or not development needs could be met elsewhere would need to be shown. Importantly, the inspector said,1) ‘a failure to meet the Duty to Cooperate cannot be remedied during the examination process because it applies to the preparation of the Plan, which ends upon submission’, and 2) local planning authorities should make every effort to secure the necessary cooperation on strategic cross boundary matters before submitting plans for examination.

The Duty to Cooperate Statement of Compliance (January 2023) forms part of the evidence base for the Submission Local Plan. In the event, the Local Plan excluding the national park only provides for 575 dpa against an OAN of 638 dpa. However this under provision against need has not been justified anywhere in discussions with neighbouring authorities before the Plan was submitted. Appendix 1 of the Statement of Compliance lists those authorities that were consulted during the earlier Regulation 18 Preferred Approach consultation. Appendix 2 lists those authorities where Statements of Common Ground have been agreed with Chichester DC for the Regulation Submission 19 Plan. No statements have produced or agreed. Therefore as it stands the under provision of housing against OAN in the Plan has not been justified. The failure to meet the duty to cooperate cannot be remedied because it has already ended with the Submission Plan. The plan therefore fails the positively prepared and justified tests. It also fails to comply with national policy in the NPPF paragraph 24-27 which advises on the duty to cooperate approach.

Local Plan Policies

The remainder of these comments deal with the proposed Settlement Hierarchy - policy S2, policy H1 – Meeting Housing Need, Non-Strategic Housing Sites – Policy H3 and T1 Transport Infrastructure.

Policy S2 – Settlement Hierarchy
The Settlement Hierarchy background paper prepared for the Regulation 18 draft Local Plan provides the justification for the hierarchy in Policy S2 of the Regulation 19 Local Plan. We agree that Plaistow & Ifold has been properly identified as a service village in the settlement hierarchy.

Policy H1 – Meeting Housing Needs
The identified housing need has been informed by the 2022 Housing and Economic Development Needs Assessment (HEDNA). It explains that based on the standard methodology, since the last HEDNA in 2020, the district wide housing need has increased from 746 dpa to 763 dpa (621 dpa in the Plan Area to 638 dpa) with the balance to be found in the national park. The proposed 638 dpa for the area of the district outside the national park is the figure that will be tested at the forthcoming Examination.
We have already explained why the failure of the Council to plan for the 638 dpa in the Regulation 19 Local Plan has not been justified in connection with the duty to cooperate and no evidence has been presented in any statement of common ground with neighbouring authorities to show how development needs could be met elsewhere.
We note from policy H1 that the components of housing supply include outstanding housing commitments without planning permission from the 2015 adopted Local Plan, the Site Allocations DPD, and ‘made’ Neighbourhood Pans.
However, it is unclear how the above housing supply components have been calculated and how they have translated into the strategic and non-strategic allocations in policies H2 and H3.
In the case of Plaistow and Ifold, the last adopted 2015 Local Plan identified the settlement with an allocation of 10 dwellings. The subsequent Site Allocation DPD identified land north of Little Springfield Farm for 10 no. units. A Neighbourhood Plan for Plaistow and Ifold was produced but was withdrawn and no site allocations were confirmed. The allocated site north of Little Springfield Farm remains undeveloped.
With specific reference to Plaistow & Ifold we would therefore query whether 1) the existing housing commitments without planning permission in the 2015 Local Plan and the Site Allocations DPD have been double counted, and 2) whether the non-implementation of the 10 units from the 2015 Local Plan have been ring fenced to count against the new proposed allocation of 25 dwellings at the settlement? In which case, we would question why a further 15 dwellings are only proposed at a service village in the hierarchy compared to other service villages in the NE part of the district which are proposed for higher levels of development (Loxwood 220 dwellings, Kirdford 50 dwellings and Wisborough Green 75 dwellings).
If the 25 dwelling allocation at Plaistow & Ifold is intended to be additional to the 10 units identified in the last 2015 Local Plan, then the allocation should be increased to 35 dwellings as a minimum to reflect the non-implementation of the 2015 allocation.
Policy H3 – Non-Strategic Parish Allocations
Policy H3 identifies non-strategic parish allocations. We have explained above our queries with the 25 dwelling allocation to Plaistow & Ifold, whether it has allowed for the non-implementation of the 10 units in the last 2015 Plan and why it compares so unfavourably with much higher levels of development for the other service villages in the NE part of the district.
We would also query why the options outlined in the PINS advisory visit of 2021 have not been more thoroughly tested for increased housing provision in the north part of the district to increase the supply of housing to meet OAN. There is no updated Settlement Hierarchy background paper, and the revised housing distribution has not been justified anywhere in the evidence base for the Regulation 19 Local Plan.

Policy T1 – Transport Infrastructure
The policy objectives to ensure new development is well located and designed to avoid or minimise the need for travel and encourage the use of sustainable modes of travel as an alternative to the private car are supported. However, the proposed contribution of £7.7k per dwelling towards A27 highway improvements applies to new housing across the district even in the NE part of the district where impacts from development on the A27 will be less than developments in the south of the district.
In any event it is unclear how the contributions are justified when the responsibility for trunk road infrastructure improvements rests with National Highways.
The proposed contribution in T1 is therefore questioned and in our view, flawed. The level of contribution set out in the policy and the principle of a contribution will therefore require further testing at the forthcoming Examination.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5024

Received: 16/03/2023

Respondent: Greenwood Group Ltd

Agent: Smith Simmons Partners

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

We have already explained our reasons why Sidlesham should be included as a ‘service village’ in the hierarchy in connection with S2. Based on this revision to the hierarchy, it follows that some housing should be directed to Sidlesham. We believe a parish allocation of the order of 35-70 dwellings would be justified.

Assuming this is accepted we would point out that the 2021 HELAA Site Ref HSI0004 referred to above is still available at Greenwood Nursery Highleigh Road Sidlesham. The Council said the site was deliverable and had an identified capacity of around 35-67 dwellings.

The proposal would generate fewer trips (and no HGV’s) compared to the existing nursery business.

Change suggested by respondent:

Policy H3 - Sidlesham should be allocated around 35-70 dwellings.

Full text:

The ‘tests of soundness’ for Local Plan preparation are set out in paragraph 35 of the July 2021 NPPF. They require the 2021-39 Local Plan to have been:

• Positively prepared – providing a strategy which, as a minimum, seeks to meet the area’s objectively assessed needs; and is informed by agreements with other authorities, so that unmet need from neighbouring areas is accommodated where it is practical to do so and is consistent with achieving sustainable development;
• Justified – an appropriate strategy, taking into account the reasonable alternatives, and based on proportionate evidence;
• Effective – deliverable over the plan period, and based on effective joint working on cross-boundary strategic matters that have been dealt with rather than deferred, as evidenced by the statement of common ground; and
• Consistent with national policy – enabling the delivery of sustainable development in accordance with the policies in this Framework.

Our comments concern the Sustainability Appraisal for the Local Plan and the following policies in connection with Sidlesham: S2 - Settlement Hierarchy and Parish Housing Sites - H3. In our view, Sidlesham should be re classified as a service village in the hierarchy and allocated a modest level of development. This would improve the overall plan in terms of it performance against the ‘justified’ test of soundness.
Sustainability Appraisal (SA)
This forms part of the evidence base for the Local Plan Review. It has updated the SA prepared for the last Preferred Approach 2018 Local Plan. We note from paragraph 5.2.11 of the updated SA that the southern part of the plan area (i.e. the east west corridor and the Manhood Peninsula) is highly constrained by capacity on the A27. Detailed discussions with National Highways and WSCC, over the course of 2019-2022, have led to a resolution that there is capacity for no more than 535 dpa in this area (with a further 40 dpa in the north part of the District outside the National Park). This contrasts with the actual housing need for the area of 638dpa.

The figure of 535dpa has now been adopted for the submission Local Plan in the southern part of the plan area with no standard 10% supply buffer.

Under providing against OAN will be a matter for discussion at Examination but even accepting the 535dpa can be justified in the south part of the district we still have concerns about the housing distribution for the manhood peninsula. For instance, in order to avoid traffic impact issues on the A27, paragraph 5.2.23 of SA says this would need avoid or minimise growth on the Manhood Peninsula and weight growth to the west of Chichester. Paragraph 5.2.29 also states that growth should be limited on the peninsula because of the need to cross or join the problematic Stockbridge and Whyke A27 junctions which is an issue for private car travel and bus connectivity.

We disagree with this analysis however. 1) it does not explain why development to west of Chichester will not cause the same impacts of having to cross the A27 as suggested will occur for the peninsula; and 2) it assumes the direction of travel will always be towards Chichester. However development on the peninsula could help support local facilities already present in the area and looking in the other direction, could help support the vitality of Selsey and East Wittering as settlement hubs. 3) Development could also help the local economy on the peninsula and introduce a younger profile to the area which the SA notes has a very significant older age structure (33% of those living on the Manhood Peninsula are aged 65+).

The table B in in the SA lists the developable 2021 HELAA sites (Housing and Economic Land Availability Assessment). It includes Site Ref HSI0004 at Sidlesham on page 86. Across a range of performance indicators the site scores 13 green, 4 light green, and 3 red points. Red indicates a significant negative effect; light green a positive; and green a significant positive effect.
Despite the very positive scoring of the site, it has been completely overlooked for any development because of the ranking of Sidlesham as within the ‘rest of the plan area’ category.

Policy S2 – Settlement Hierarchy
The Settlement Hierarchy background paper was prepared for the last Preferred Options Local Plan in Dec 2018. It has not been updated for the Submission Plan but provides justification for the hierarchy in Policy S2 of the Local Plan. It forms the basis for the proposed distribution of growth by distinguishing between those settlements considered to be the most sustainable having the best range of facilities and accessibility from those with the least. Most development is focused on the former and development to meet local needs or no development whatsoever on the latter. Paragraph 4.8 of the background paper includes Sidlesham in the ‘rest of the plan area’ least suited for development because it does ‘not contain the range of facilities and services to be classified as sustainable’.

We therefore disagree with this classification and believe Sidlesham should be included as a ‘service village in the hierarchy based on its population and range of available facilities.

The Councils own Settlement Capacity Profile 2013 shows Sidlesham with a population of over 1,100. This historic population is more than Boxgrove, Kirdford and Westhampnett which are all service villages in Policy 2 of this draft Local Plan.

Sidlesham has 4 employment areas at Enbourne Business Park, Walnut Tree Science Park Locks Lane, Jury Lane and the Horticultural Development Area. Community facilities include a petrol filling station with convenience store and off licence, church, recreation ground and football field with licensed bar and hall, primary school with sports hall available for wider community use, 2 other pubs (one a ‘gastro pub’ at Sidlesham Quay). Access to bus services are available from the B2145, 1 regular daytime bus service (51) linking to Chichester & Selsey (Most frequent daytime service, every 15 minutes). A more irregular daytime bus service (150) is on Mondays, Wednesdays and Fridays (3 daytime services in each direction).

Based on this range of facilities we therefore believe Sidlesham should be re-categorised as a service village and allocated for a modest amount of development. This would support its existing facilities and the settlement hubs of Selsey and West Wittering. A modest amount of development need not lead to critical impacts on the A27 as travel impacts would not necessarily be attracted towards Chichester.

Policy H3 – Parish housing Sites
We have already explained our reasons why Sidlesham should be included as a ‘service village’ in the hierarchy in connection with S2. Based on this revision to the hierarchy, it follows that some housing should be directed to Sidlesham. We believe a parish allocation of the order of 35-70 dwellings would be justified.

Assuming this is accepted we would point out that the 2021 HELAA Site Ref HSI0004 referred to above is still available at Greenwood Nursery Highleigh Road Sidlesham. The Council said the site was deliverable and had an identified capacity of around 35-67 dwellings. A draft layout plan is attached showing a 35 dwelling scheme. The site is outside the designated horticultural development area, within flood zone 1 (least liable to flood) and has no biodiversity or heritage interest. It is located outside the Chichester Harbour Area of Outstanding Natural Beauty. It has a footpath link to the nearby school.

The proposal would generate fewer trips (and no HGV’s) compared to the existing nursery business.

Attachments:

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5082

Received: 17/03/2023

Respondent: The Brooks Family

Agent: Henry Adams LLP

Representation Summary:

On the basis of the 535 dpa figure, it is considered that the selected areas for growth and housing figures are deliverable over the Plan period, however, the plan area could accommodate a greater level of growth. Our clients support the approach to Boxgrove and the allocation of a minimum of 50 houses with a suitable site to be identified through the Neighbourhood Plan or Site Allocations DPD. Our clients’ land is the most suitable land to provide a sustainable addition to the village given the landscape and heritage constraints to the north. The provision of all the housing on one site will provide 15 affordable homes for the village which is a significant benefit.

Change suggested by respondent:

Site proposed in relation to Boxgrove Allocation.

Full text:

See attached representation.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5124

Received: 17/03/2023

Respondent: Boxgrove Parish Council

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Objection to Boxgrove's allocation of 50 dwellings on grounds that over 50% of land in parish lies within SDNP; HELAA sites within countryside; lack of capacity at local school and A27; views would be compromised by development; heritage assets affected; use of agricultural land.

Full text:

Boxgrove Parish Council wish to contest the allocation of 50 dwellings during the Local Plan duration.
The Local Plan consultation period has not allowed sufficient time for proper local consultation and includes proposals that have never previously been consulted upon.
We do not understand how so many of the sites, previously discounted in the 2018 HELAA, for various reasons, are now designated in the 2021 HELAA as having ‘no known constraints’ to development on the same sites.
Furthermore, out of 11 Service Village Parishes, found to have potential sites for dwellings in 2018, 7 of these now have a zero allocation in the Local Plan. Boxgrove has been allocated 50 dwellings, despite over 50% of Boxgrove’s land area lying within the boundary of the SDNP.
All of the sites identified are outside of the existing Settlement Boundary, and are therefore in ‘The Countryside’, in contravention of your Policy NE10.
The village school is at capacity and there are no known plans to expand it.
There are future capacity issues at the A27 Tangmere roundabout junction and concerns about future short cutting through Boxgrove and the already narrow and winding local roads to the north.
The Conservation Area Character Appraisals identify many long views out of the CA’s, which would be compromised by development.
Boxgrove and the village of Halnaker both have Conservation Areas and there are a total of 51 listed buildings and two Scheduled Monuments in the Parish many of which would be affected by development on the sites identified.
Development would be in contravention of your Policies P9, P10 and P11 of the Local Plan.
All the sites, identified as potentially developable, are on agricultural land. These are either currently farmed, are vineyards or are livery. This land is graded 2 or 3 in contravention of Policy NE2 Natural Landscape.
In conclusion, we believe that the HELAA and the allocation of 50 dwellings for Boxgrove in the Local Plan are unachievable on most of the sites identified. We are sure that a small number of sites for a lower number of dwellings may be achievable,and intend to consider this as part of the revisions to our Neighbourhood Plan.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5125

Received: 16/03/2023

Respondent: Levanter Developments Limited

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

The allocation for 75 dwellings to Wisborough Green is supported as the village is one of the most sustainable locations of all of the parishes/service villages

The overall strategy is highly dependent on the delivery of housing from Neighbourhood Plan areas. It is considered that this approach allows for little mitigation or alternatives should delivery not come forward.

Change suggested by respondent:

In order for the plan to be considered ‘positively prepared’ and ‘justified’ it is recommended that additional wording is added to policy H3 to state that individual planning applications can come forward on sustainable sites outside of existing settlement boundaries in parishes should delivery not come forward within the first five years of the plan period. Priority should be given to any sites already identified within draft versions of Neighbourhood Plans.

Priority consideration should be given to the proposed sites HWG0004, HWG0019 (Ansells Yard) and HWG0022, proposed for allocation in a draft Neihgbourhood Plan Review.

Full text:

I write in response to the regulation 19 consultation version of the Chichester Local Plan 2021-2039 in our capacity as promoters of Ansells Yard, Kirdford Road, Wisborough Green.

Conclusions
There are several concerns on the soundness of the plan in terms of whether it is effective, justified, positively prepared or consistent with national policy in accordance with paragraph 35 of the NPPF.
It is not considered that the Council has justified the extent of the under supply of housing against the established housing need. There are significant concerns over the delivery of housing from the strategic allocations within the unjustified timescales as set out within the trajectory contained in the plan.

Levanter will continue to make further representations on the deliverability of the site as part of the plan making progress.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5139

Received: 16/03/2023

Respondent: South Downs National Park Authority

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

It is noted that a substantial number of new homes are proposed on the A259 corridor between Emsworth and Chichester. This is a sensitive stretch of land in the coastal plain between the coast, the south coast railway and the A27. This corridor provides the connection, including intervisibility, between the protected landscapes of the South Downs National Park and Chichester Harbour AONB, for example views of the channels within the Harbour from the Trundle and Stoke Clump. The amendments to policy set out earlier in this consultation response will help to ensure that development coming forward in this sensitive area positively addresses the South Downs National Park and its setting.
It is noted that several settlements around the South Downs National Park have been given a figure to be identified through either Neighbourhood Development Plans or through a potential future Site Allocations DPD. We particularly note Southbourne (1,050 homes), Wisborough Green (75 homes), (Kirdford (50 homes) and Boxgrove (50 homes). We raise concern about these figures and the challenge neighbourhood planning groups may have as many potential sites in these areas are likely to be in the setting of the South Downs National Park. It will be important that attempts to meet these target figures address the requirements of NPPF paragraph 176 on setting.

Full text:

See attached representation.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5361

Received: 17/03/2023

Respondent: Landlink Estates Ltd

Agent: Jackson Planning Ltd

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Object on grounds that policy does not include sites in Parishes to seek to meet the Council’s OAN where there are acceptable sites capable of accommodating housing to meet those needs; evidence of suitable sites has been provided in HEELA assessment; a reasonable alternative would have been to look at parishes considering allocations in Neighbourhood Development Plans (Hunston) and where planning application are well advanced (North Mundham); reasonable alternative site Charmans Field, Runcton should have been tested in SA.

Change suggested by respondent:

Add additional capacity at North Mundham and Hunston villages:
Hunston – Figure 100
North Mundham Figure 100

Full text:

See attachments.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5373

Received: 16/03/2023

Respondent: Deerhyde Limited

Agent: Vail Williams LLP

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Site submission. Land North of Golf Links Lane, Selsey.

Full text:

I am pleased to attach our representations in response to the Chichester Local Plan Regulation 19 consultation. These representations are submitted on behalf of our clients Deerhyde Ltd. owners of land in Selsey and located in the area for a significant number of years.
The submitted documents include the following:
• Representations statement
• Plans showing the potential road widening of Golf Links Lane and Paddock Lane, Selsey
• Development potential of sites for residential development at Golf Links Lane and Old Farm Road, Selsey taking account of flood zones 2 and 3 (2 plans 15-085 SK03 and SK04)
• Plans showing access options to Golf Links Lane site
• Plan showing tracking analysis for low-loaders
• Junction analysis
• Submission form
As detailed in the attached, after careful consideration we have concluded that the housing strategy for Chichester is flawed in principle as it fails to allocate sufficient sites in outside Chichester City (or adjacent to) to allow the remainder of the District to continue to provide houses for local people in areas where they are most needed.
In addition, our clients have put forward a suggestion for an infrastructure improvement to Selsey – namely the widening of Golf Links Lane and Paddocks Lane to accommodate delivery of caravans / other HGV / LGVs but also to provide a wider carriageway which could potentially incorporate a pavement / footpath cycleway to aid safer conveyance of pedestrians and vehicles in the area. Adding in a safer highway solution would also encourage car users to walk or cycle for local trips rather than risking congestion in the car. It would have the added benefit of diverting caravan park traffic travelling from the north into the caravan parks earlier and thus relieving congestion of Selsey High Street.
Introduction

1.1. Vail Williams LLP has been instructed by Deerhyde Ltd to submit representations to the Chichester Local Plan 2021-2039: Proposed Submission (Regulation 19) document.

1.2. As per the Website, these comments seek to address the three questions namely:
1. Is it legally compliant?
2. Is it sound?
3. Does it comply with the duty to cooperate?

1.3. These representations are largely focussed on the provision of housing and ensuring that a satisfactory access (both vehicular and pedestrian) can be maintained and enhanced, particularly in Selsey.

1.4. These representations reflect the fact that our client, Deerhyde Ltd, owns a significant amount of land in the Selsey area, an interest which was acquired in 1986 but with family ownership going back many years before then.

1.5. Our clients have identified a potential opportunity to facilitate highway improvements within Selsey which would be to the benefit of both residents and tourists using the holiday parks and other attractions alike. This would particularly be of benefit given the Council’s acknowledgement that the B2145 through Selsey is the busiest B road in the country These representations bring into question the ‘tests of soundness’. In particular regarding the questions as to whether it is ‘sound’ on the basis of whether it has been ‘positively prepared’, whether it is ‘justified’ and ‘effective’ in respect of the areas of concern raised with respect to employment land provisions.

1.6. As set out at Paragraph 35 of the NPPF local plans are required to be ‘sound’. Plans are considered sound when the following applies:
a) Positively prepared – providing a strategy which, as a minimum, seeks to meet the area’s objectively assessed needs1; and is informed by agreements with other authorities, so that unmet need from neighbouring areas is accommodated where it is practical to do so and is consistent with achieving sustainable development;
b) Justified – an appropriate strategy2, taking into account the reasonable alternatives3, and based on proportionate evidence4;
c) Effective – deliverable over the plan period5, and based on effective joint working on crossboundary strategic matters that have been dealt with rather than deferred, as evidenced by the statement of common ground; and
d) Consistent with national policy – enabling the delivery of sustainable development in accordance with the policies in this Framework and other statements of national planning policy, where relevant.6

1.7. These representations seek to highlight that Chapter 5 (Housing) has not been positively prepared, in so far as it does not provide [1.] “a strategy which, as a minimum, seeks to meet the area’s objectively assessed needs”.
1.8. It is also considered that Chapter 5 is not justified as the housing strategy is [2.] is inappropriate as it relies on a number of large strategic sites, with multiple issues some of which are in conflict with other parts of the local plan.

1.9. Chapter 5 is also not justified with respect to its provisions do not [3.] take into account reasonable alternative sites.

1.10. It is considered on the basis of the other factors highlighted in these representations and the proposed housing land provision is not ‘consistent with national policy’ as the proposed provision does not enable the delivery of sustainable development in accordance with the policies in this Framework and other statements of national planning policy, where relevant. It is considered that the proposed plans are contrary to the NPPF paragraph 16a, 16b, 16c, 16d and paragraph 20a

2 Local Plan Representations

2.1. Having reviewed the draft Local Plan we would make the following comments:

2.2. Paragraph 3.1 asserts the Government’s encouragement for local planning authorities to ensure sustainable development is at the forefront when considering planning applications and that the National Planning Policy Framework (NPPF) defines sustainable development as “meeting the needs of the present without compromising the ability of future generations to meet their own needs”. Paragraph 3.5 goes on to advise the range of factors as are informed the spatial strategy which underpins the local plan which, inter alia, “the pattern of need and demand for housing and employment across the area”, “infrastructure capacity and constraints, in particular related to waste water treatment, roads and transport”, “the availability of potential housing types, their deliverability and phasing” and this needs to take place whilst being mindful of the environmental constraints taking a sequential approach to avoiding flood risk areas, protect the environmental designations, landscape quality, the historic environment and settlement character.

2.3. The principles outlined above are supported as these are the key facets of good planning and plan making. However it falls to local authorities to ensure that the sustainable approach includes providing a sufficient supply of homes and facilitating a variety of sites to come forward where needed, and that the needs of groups within specific housing requirements are addressed and that land with permission is developed without unnecessary delay. (Paragraph 65). Paragraph 66 states that within the overall requirement [for housing] strategic policies should also set out a housing requirement for designated neighbourhood areas which reflects the overall strategy for the pattern and scale of development and any relevant allocations.

2.4. Paragraph 67 goes on, where it is not possible to provide a requirement figure for a neighbourhood area, the local planning authority should provide an indicative figure, if requested to do so by the neighbourhood planning body. This figure should take account of factors such as the latest evidence of local housing need, the population of the neighbourhood area and the most recently available planning strategy of the local planning authority.

2.5. Paragraph 68 asserts that strategic policy making authorities should have a clear understanding of the land available in their area through the preparation of a Strategic Housing Land Availability Assessment (SHLAA). From this, planning policies should identify a sufficient supply and mix of sites, taking into account their availability, suitability and locally economic viability.

2.6. Further guidance states (Paragraph 69) that small and medium sized sites can make an important
[my emphasis] contribution to meeting the housing requirements of an area, and are often built-
out relatively quickly. To promote the development of a good mix of sites the local planning authority should identify sites of small and medium size and support the development of windfall sites through their promises and decisions giving great weight to the benefits of using suitable sites within existing settlements for homes.

2.7. Neighbourhood planning groups should also give particular consideration to the opportunities for allocating small and medium-sized sites suitable for housing in their area. Paragraph 71 goes on: where an allowance is to be made for windfall sites as part of anticipated supply, there should be compelling evidence that they will provide a reliable source of supply. Any allowance should be realistic having regard to the SHLAA, historic windfall delivery rate and expected future trends.

2.8. Whilst it is noted that the delivery of large scale sites can result in the delivery of large numbers of new homes, it is apparent that such developments take considerable time to work their way through the planning system to an approval and even then are only at outline stage. The delivery of new homes is therefore reliant on the Councils to efficiently determine reserved matters applications and, thereafter, discharge of conditions, to allow a swift implementation of planning applications and a timely start on site for the delivery of housing.

2.9. The inclusion of small and medium sites (ie. not reliant on strategic sites) within the housing mix
are invaluable in delivering housing quicker and potentially in places, perhaps outside the main settlements, which would allow new housing to be accessible to all which is one of the key facets of the NPPF.

2.10. This approach would assist with maintaining delivery of housing where existing allocations are either stalled or progressing slowly through the planning system or have simply been delayed in coming forward for perhaps other commercial reasons.

2.11. The plan is largely predicated on strategic sites, as detailed at Policy H2 which would provide 7,195 houses. This is a significant reliance on the strategic sites to deliver 75% of the overall housing target and much of them are predicated on the works to the A27 being completed in order to make them acceptable.

2.12. It should be noted that the above housing provision is predicated on the ability to identify mitigation for the impacts on the European environmental designations (including nutrient neutrality), addressing highway implications and negotiating the planning system.

The Manhood Peninsula

2.13. The preferred approached version of the Local Plan does include moderate growth for the settlement hubs of Selsey (250 dwellings) and East Wittering (350) and the service village of Hunston (200). However, since then several planning permissions have contributed to the moderate levels of growth on the Manhood Peninsula which the Council says has accounted for these housing numbers. The plan does not therefore include any strategic allocations on the Manhood Peninsula in recognition of this recently permitted growth and the ongoing constraints the area faces, save for 50 dwellings to come forward at North Mundham.

2.14. This approach is not considered sound as a reason to prevent development of any scale on the Manhood Peninsula (particularly Selsey) for the plan period. As detailed above, it is essential that the plan allocates land across its settlement hierarchy in order to maintain a sustainable and deliverable approach to development and to assist the continuing evolution and economic viability of settlements which rely heavily on tourism and also on new development to maintain
the supply of homes to provide options for all sectors of the local community to be able to live on the Peninsula should they so wish.

2.15. It is noted that at Policy S2 (settlement hierarchy), Selsey is listed as a “settlement hub” which is the second tier of settlement under Chichester city. Whilst this hierarchy, particularly in connection with Selsey is supported it is therefore surprising not to see more housing sites allocated within and around Selsey.

2.16. Given the potential number of environmental constraints on the Manhood Peninsula it is unlikely that sites of any excessive size would come forward and large numbers of dwellings would not necessarily result once the sites had taken account of their environmental constraints. That said, and as reflected above, sites of a size proportionate to their location but below “strategic” size can have an important part to play in the delivery of sufficient housing numbers in the right location at the
right time in accordance with the NPPF.

Housing

2.17. Policy H1 (meeting housing needs) sets out the housing requirement for the full plan period of 1 April 2021 to 31 March 2039 as 10,350 dwellings. This allocates 963 dwellings to the Manhood Peninsula and a windfall (small site allowance) allocation of 657 dwellings for the whole district. There are no strategic locations/allocations on the Manhood Peninsula under Policy H2 which is considered unsound, particularly given the position that Selsey holds in the settlement hierarchy. Furthermore, under Policy H3 (non-strategic parish housing requirements 2021-2039) Selsey has been allocated zero housing. Again, this is considered unsound as it prevents sustainable development and access to new houses for all settlements across the district.

2.18. An overreliance on consented sites coming forward to provide future housing is considered unsound as, in this case, it effectively prevents any further development on the Peninsula and in Selsey in particular.

Transport

2.19. Policy T1 (transport infrastructure) is specifically aimed at ensuring that integrated transport measures will be developed to mitigate the impact of planned development on the highway network, improve highway safety and air quality, promote more sustainable travel patterns and encourage increased use of sustainable motor travel, such as public transport, cycling and walking.

2.20. The council will work with National Highways, WSCC, other transport and service providers and developers to provide a better integrated transport network and improve accessibility to key services and facilities. The policy lists seven ways in which the key objectives of reducing the need to travel by car, enabling access to sustainable means of travel, including public transport, walking and cycling; managing travel demands; and mitigating the impacts of travelling by car can be achieved.

2.21. Whilst it is not intended to go through all of these in this document it is noted that all parties are expected to support the four objectives by working with relevant providers to improve accessibility to key services and facilities which would be relevant to Selsey (see below).

2.22. The policy is also aimed at planning to achieve a timely delivery of transport infrastructure on the A27 and elsewhere on the network which is needed to support new housing, employment and other development identified in this plan. The phasing of delivery of new development to align with provision of new transport infrastructure such as improvements to the A27 and elsewhere on the highway network, will be key to managing impacts on the highway. This is yet another impediment to the delivery of a strategic allocations and larger scale development which would, by their very nature, generate a higher highway impact on the transport network than carefully planned smaller developments which could satisfy a much more localised need and be cause less impact on the strategic road network. The tariff proposals outlined at paragraph 8.20 only covers part of West of Chichester and Tangmere SDLs and not the other strategic sites outlined at Policy H2.

2.23. Critically it is also understood that Highways England has pulled funding for the improvements to the Bognor Road roundabout as part of a package of A27 improvements. On this basis it is unclear how further funding would secured at this time.

2.24. The lack of soundness to the approach of significant reliance on strategic sites, due to the current lack of capacity of the A27, is evident in the text that accompanies the policy which states that opportunities to secure funding to implement this package of improvements will be maximised by working proactively with Government agencies, other public sector organisations and private investors. Developer contributions from new development will also be sought. It is clear that smaller scale developments which would have a significantly lesser impact on the highway network could deliver housing quicker and with fewer constraints to implementation. It is for these reasons that smaller sites should be allocated, particularly in the Manhood Peninsula, for development.

2.25. The content of Policy T2 (transport development) is largely supported and considered sound save for the fact that it does not seem to cover the improvement of local transport routes, particularly those that would assist in improving the circulation of traffic around smaller settlements. The policy should be amended to specifically relate to local transport improvements which are locally important to aid traffic circulation and reduce congestion.

Neighbourhood Plan

2.26. The Selsey Neighbourhood Plan does not seek to allocate any sites or residential development, instead relying on those which were allocated in the previous local plan and, in particular, developments at Park Farm/Middle Field and Drift Field totalling 249 houses. It is assumed that this existing commitment accommodates the neighbourhood plan of 150 houses which is the justification for not allocating of residential development in the neighbourhood plan. However, this is short sighted as the neighbourhood plan runs to 2029 and, although development sites are largely controversial within smaller communities there is a lack of recognition of the requirement to provide new houses for existing and future residents (including descendants of current residents) in order to maintain the vitality and viability of the settlement outside of the tourist season where it is recognised that the local population will swell.

2.27. These points add further weight to the considered lack of soundness to the housing policies in the local plan which fail to recognise the need for smaller allocations within the Manhood Peninsula, particularly Selsey.

3 Local Infrastructure Provision

Selsey Road Improvements

3.1. Our clients wish to put forward a potential highway improvement scheme for Selsey which has come about given their extensive historic knowledge of the town and experience of significant congestion along Selsey High Street as a result of an over-reliance of this route by traffic using the caravan parks. It would be a common sense alternative route (to using High Street) which will alleviate congestion along Selsey High Street/School Lane/Paddock Lane/Warners Lane, particularly during the summer months.

3.2. The local plan focusses its attention on the need to improve the strategic highway network but this proposal would provide a significant benefit at a local level in Selsey. As per the attached plan, our clients propose to widen Golf Links Lane from its junction with the B2145 Chichester Road to its junction with Paddock Lane, then widen Paddock Lane and make it up to adoptable standard to enable delivery of holiday traffic to the point where it meets the north eastern corner of White Horse Caravan Park, from which point the road has been made up to carry holiday traffic. At the moment, the northern section of Paddock Lane is just a rough track which is not suitable for ordinary road traffic. It is envisaged that, in conjunction with the owner of the largest caravan parks, Warner’s Lane will also be improved. It is currently a tarmac road in poor condition with no footways and one section is too narrow to allow two vehicles to pass each other. This is not satisfactory for the major access route to the largest caravan parks.

3.3. Golf Links Lane is currently a single track, tarmac road which is in poor condition. It is two-way but much of it is too narrow to allow two vehicles to pass each other. It serves Northcommon Farm, a small housing development on the northern side, Selsey Golf Club and Selsey Country Club (which comprises c.300 holiday chalets and an associated licensed club). It if were to be made up to adoptable standard to the point where it meets Paddock Lane, it would improve access for existing users but, importantly, it would also create a more direct access route (in conjunction with Paddock Lane) for traffic associated with thousands of holiday caravans as well as a touring caravan park.

3.4. Given that a large proportion of holiday traffic and other tourist industry-related traffic (HGVs carrying food and drink, caravan transporters, tractor/trailer transport and public transport) use the route along High Street/School Lane/Paddock Lane/Warners Lane it is considered that this could be diverted from the B2145 Chichester Road further north than Selsey High Street, thus taking traffic away from the congested High Street. An easier, more direct route to the major caravan parks would be an attractive alternative.

3.5. The mechanism to deliver such a proposal is not yet the subject of formal agreement. A large proportion of the land required to widen the roads is within the ownership of Deerhyde Limited (our clients) and the owner of the major caravan parks. The latter has been very supportive of the proposal verbally. A short section of land is not in any specific ownership but our clients have long-standing rights over its use, which can be traced back to 1830. Our clients are serious about facilitating these highway improvements, including the use of their land, which will inevitably have a significant financial impact upon them.

Potential Residential Development Sites

3.6. In order to mitigate the financial impact including both the loss of their land and the implementation of the proposed highway improvements our clients would like to promote two sites for residential development, namely land north of Golf Links Lane (13.5 acres/5.46 hectares) and land west of Old Farm Road for residential development. Whilst the north western corner of the site is located within Flood Zones 2 and 3 it is considered that the developable area of the site would be approximately 4 hectares and could therefore deliver approximately 120 to 140 dwellings. This includes retaining the existing boundary screening along the south eastern boundary and avoiding Flood Zones 2 and 3. An indicative plan is attached to this statement.

3.7. Thawscroft Ltd, an associated company, also owns land west of Old Farm Road, Selsey (2.8ha / 6.9 acres) which taking account of the flood risk constraints along its western boundary could accommodate approximately 50 dwellings. An indicative plan is attached to this statement.

3.8. Having reviewed the planning history of the site it is noted that a planning application (under the name of Thawscroft Limited) was made in December 2016, refused in June 2017 and the appeal was dismissed on 11 June 2018.

3.9. The reasons for refusal related to the following:

1. Site is located outside the defined settlement boundary for Selsey.

2. When the planning officer was giving evidence, he stated that he knew of an alternative site at lower risk of flooding but he would not identify it. After the appeal, an area of land north of Park Lane was identified for 250 houses. The land in question becomes waterlogged in the winter and is highly prone to surface water flooding. It is also only about 250m from Pagham Harbour, a site of major ecological importance with a significant level of protection afforded to it. The planning officer said the real issue with our appeal was one of numbers so it seemed curious to me that a site with a much larger number (250) was identified soon afterwards. Also, the land south of Park Lane (similarly prone to surface water flooding) was in the numbers for 2015/20 but in fact could not be started until 2021 so the planning inspector was misled. I believe that was crucial to the outcome. Landlink have proposed land west of the “Wave” roundabout (opposite Asda). This may be as an alternative for the land north of Park Lane. Neither parcel would be a good fit in the settlement policy area, whereas the land to the west of Old Farm Road would be, a fact acknowledged by planning officers in the past.

3. We did in fact offer to provide contributions towards improving the A27 so that reason for refusal was withdrawn prior to the appeal being heard.

4. As far as I can recall, the Council was content with our proposals in these matters at the time the appeal was heard. The criticism was that the need to avoid Flood Zones 2 and 3 created a narrow site which meant that the layout was said to be cramped. It could be that, with a smaller number of houses, MH Architects could provide an improved layout. Maybe this is reflected in the plan to which Vail Williams refer in paragraph 3.13.

3.10. It is considered that, as detailed above, given the Council’s approach to an over-reliance on large strategic sites to fulfil its housing need and the lack of sites identified for development on the Manhood Peninsula (and in Selsey in particular) during the plan period this site could be proven to be an appropriate location for development as a “windfall site” to help maintain housing supply whilst the strategic sites are in the planning system.

3.11. It is considered the dwellings on the site could be laid out to avoid the Flood Zones 2 and 3 and therefore be at considerably less flood risk than the proposal which was dismissed at appeal. This is set out in the enclosed plan. This would overcome reason for refusal 2.

3.12. Reasons for refusal 3 and 4 would be overcome through the agreement of under Section 106 of the Town & Country Planning Act to provide contributions towards the improvement to the A27 on a proportionate basis to the size of the site and the number of dwellings and also the relevant number of affordable housing units required by policy (or justified as part of a viability exercise). Other matters such as the management of the landscaping, open space, buffers and drainage infrastructure could also be secured by the Section 106 agreement.

3.13. We commend the above highways solution and subsequent development sites to officers in consideration of the draft Local Plan.

4 Conclusions

4.1. It is clear that whilst the overarching strategy of the location of the majority of development in the largest urban settlement of Chichester or adjacent to it is sound the lack of allocation of significant housing numbers to those areas outside Chichester is unsound. This would mean that the vast majority of the district would attract very little housing over the planning period to 2039 thus ensuring that existing settlements would not evolve and would potentially shrink as existing residents and descendants of residents migrate to the Chichester or its strategic urban extensions.

4.2. Outside Chichester, the strategic proposals for Southbourne and Tangmere are similarly isolated. The Manhood Peninsula is particularly lacking in the provision of additional housing sites during the plan period with the justification provided that, for Selsey in particular, recent planning permissions which are being built or have been completed would accommodate all of the housing need going forward for the plan period.

4.3. This approach is flawed for two main reasons (making the Local Plan unsound):

1. The over-reliance on strategic allocations which themselves are constrained by the capacity issues on the A27 and environmental issues such as nitrate neutrality (and any future water neutrality issues which migrate south from the north of Chichester) and the usual impacts on the European sites could mean that these sites are slower in being delivered with little in the way of alternatives allowed for in the local plan.

2. The failure to acknowledge any future development potential of note within the Manhood Peninsula and in particular Selsey will constrain the continued vitality and viability of the settlements within the Manhood Peninsula, particularly following the pandemic when the service sectors are struggling. Taking into account that Selsey in particular but other settlements along the coast within the Manhood Peninsula are reliant on seasonal tourist activity, additional residents are relied upon outside these times in order to provide income for those businesses which may struggle to survive outside the holiday seasons. An effective block on development would significantly reduce the potential future viability of these settlements outside the tourist season.

4.4. The emphasis on the stated urban-focussed housing strategy encourages neighbourhood planning groups/parish and town councils to maintain an opposition to the relevant rather than a proactive policy framework to direct appropriate development within their areas.

4.5. Our clients have detailed above one way which their land could be used in conjunction with others to facilitate a local infrastructure improvement to assist traffic circulation and access in and around Selsey itself which would need to be funded by future residential development and we commend this proposal to you for further consideration.

4.6. We trust that officers will take these representations into account and we look forward to receiving confirmation that the representations have been duly made.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5379

Received: 16/03/2023

Respondent: Deerhyde Limited

Agent: Vail Williams LLP

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The Selsey Neighbourhood Plan does not seek to allocate any sites or residential development, instead relying on those which were allocated in the previous local plan and, in particular, developments at Park Farm/Middle Field and Drift Field totalling 249 houses. It is assumed that this existing commitment accommodates the neighbourhood plan of 150 houses which is the justification for not allocating of residential development in the neighbourhood plan. However, this is short sighted as the neighbourhood plan runs to 2029 and, although development sites are largely controversial within smaller communities there is a lack of recognition of the requirement to provide new houses for existing and future residents (including descendants of current residents) in order to maintain the vitality and viability of the settlement outside of the tourist season where it is recognised that the local population will swell.

These points add further weight to the considered lack of soundness to the housing policies in the local plan which fail to recognise the need for smaller allocations within the Manhood Peninsula, particularly Selsey.

Full text:

I am pleased to attach our representations in response to the Chichester Local Plan Regulation 19 consultation. These representations are submitted on behalf of our clients Deerhyde Ltd. owners of land in Selsey and located in the area for a significant number of years.
The submitted documents include the following:
• Representations statement
• Plans showing the potential road widening of Golf Links Lane and Paddock Lane, Selsey
• Development potential of sites for residential development at Golf Links Lane and Old Farm Road, Selsey taking account of flood zones 2 and 3 (2 plans 15-085 SK03 and SK04)
• Plans showing access options to Golf Links Lane site
• Plan showing tracking analysis for low-loaders
• Junction analysis
• Submission form
As detailed in the attached, after careful consideration we have concluded that the housing strategy for Chichester is flawed in principle as it fails to allocate sufficient sites in outside Chichester City (or adjacent to) to allow the remainder of the District to continue to provide houses for local people in areas where they are most needed.
In addition, our clients have put forward a suggestion for an infrastructure improvement to Selsey – namely the widening of Golf Links Lane and Paddocks Lane to accommodate delivery of caravans / other HGV / LGVs but also to provide a wider carriageway which could potentially incorporate a pavement / footpath cycleway to aid safer conveyance of pedestrians and vehicles in the area. Adding in a safer highway solution would also encourage car users to walk or cycle for local trips rather than risking congestion in the car. It would have the added benefit of diverting caravan park traffic travelling from the north into the caravan parks earlier and thus relieving congestion of Selsey High Street.
Introduction

1.1. Vail Williams LLP has been instructed by Deerhyde Ltd to submit representations to the Chichester Local Plan 2021-2039: Proposed Submission (Regulation 19) document.

1.2. As per the Website, these comments seek to address the three questions namely:
1. Is it legally compliant?
2. Is it sound?
3. Does it comply with the duty to cooperate?

1.3. These representations are largely focussed on the provision of housing and ensuring that a satisfactory access (both vehicular and pedestrian) can be maintained and enhanced, particularly in Selsey.

1.4. These representations reflect the fact that our client, Deerhyde Ltd, owns a significant amount of land in the Selsey area, an interest which was acquired in 1986 but with family ownership going back many years before then.

1.5. Our clients have identified a potential opportunity to facilitate highway improvements within Selsey which would be to the benefit of both residents and tourists using the holiday parks and other attractions alike. This would particularly be of benefit given the Council’s acknowledgement that the B2145 through Selsey is the busiest B road in the country These representations bring into question the ‘tests of soundness’. In particular regarding the questions as to whether it is ‘sound’ on the basis of whether it has been ‘positively prepared’, whether it is ‘justified’ and ‘effective’ in respect of the areas of concern raised with respect to employment land provisions.

1.6. As set out at Paragraph 35 of the NPPF local plans are required to be ‘sound’. Plans are considered sound when the following applies:
a) Positively prepared – providing a strategy which, as a minimum, seeks to meet the area’s objectively assessed needs1; and is informed by agreements with other authorities, so that unmet need from neighbouring areas is accommodated where it is practical to do so and is consistent with achieving sustainable development;
b) Justified – an appropriate strategy2, taking into account the reasonable alternatives3, and based on proportionate evidence4;
c) Effective – deliverable over the plan period5, and based on effective joint working on crossboundary strategic matters that have been dealt with rather than deferred, as evidenced by the statement of common ground; and
d) Consistent with national policy – enabling the delivery of sustainable development in accordance with the policies in this Framework and other statements of national planning policy, where relevant.6

1.7. These representations seek to highlight that Chapter 5 (Housing) has not been positively prepared, in so far as it does not provide [1.] “a strategy which, as a minimum, seeks to meet the area’s objectively assessed needs”.
1.8. It is also considered that Chapter 5 is not justified as the housing strategy is [2.] is inappropriate as it relies on a number of large strategic sites, with multiple issues some of which are in conflict with other parts of the local plan.

1.9. Chapter 5 is also not justified with respect to its provisions do not [3.] take into account reasonable alternative sites.

1.10. It is considered on the basis of the other factors highlighted in these representations and the proposed housing land provision is not ‘consistent with national policy’ as the proposed provision does not enable the delivery of sustainable development in accordance with the policies in this Framework and other statements of national planning policy, where relevant. It is considered that the proposed plans are contrary to the NPPF paragraph 16a, 16b, 16c, 16d and paragraph 20a

2 Local Plan Representations

2.1. Having reviewed the draft Local Plan we would make the following comments:

2.2. Paragraph 3.1 asserts the Government’s encouragement for local planning authorities to ensure sustainable development is at the forefront when considering planning applications and that the National Planning Policy Framework (NPPF) defines sustainable development as “meeting the needs of the present without compromising the ability of future generations to meet their own needs”. Paragraph 3.5 goes on to advise the range of factors as are informed the spatial strategy which underpins the local plan which, inter alia, “the pattern of need and demand for housing and employment across the area”, “infrastructure capacity and constraints, in particular related to waste water treatment, roads and transport”, “the availability of potential housing types, their deliverability and phasing” and this needs to take place whilst being mindful of the environmental constraints taking a sequential approach to avoiding flood risk areas, protect the environmental designations, landscape quality, the historic environment and settlement character.

2.3. The principles outlined above are supported as these are the key facets of good planning and plan making. However it falls to local authorities to ensure that the sustainable approach includes providing a sufficient supply of homes and facilitating a variety of sites to come forward where needed, and that the needs of groups within specific housing requirements are addressed and that land with permission is developed without unnecessary delay. (Paragraph 65). Paragraph 66 states that within the overall requirement [for housing] strategic policies should also set out a housing requirement for designated neighbourhood areas which reflects the overall strategy for the pattern and scale of development and any relevant allocations.

2.4. Paragraph 67 goes on, where it is not possible to provide a requirement figure for a neighbourhood area, the local planning authority should provide an indicative figure, if requested to do so by the neighbourhood planning body. This figure should take account of factors such as the latest evidence of local housing need, the population of the neighbourhood area and the most recently available planning strategy of the local planning authority.

2.5. Paragraph 68 asserts that strategic policy making authorities should have a clear understanding of the land available in their area through the preparation of a Strategic Housing Land Availability Assessment (SHLAA). From this, planning policies should identify a sufficient supply and mix of sites, taking into account their availability, suitability and locally economic viability.

2.6. Further guidance states (Paragraph 69) that small and medium sized sites can make an important
[my emphasis] contribution to meeting the housing requirements of an area, and are often built-
out relatively quickly. To promote the development of a good mix of sites the local planning authority should identify sites of small and medium size and support the development of windfall sites through their promises and decisions giving great weight to the benefits of using suitable sites within existing settlements for homes.

2.7. Neighbourhood planning groups should also give particular consideration to the opportunities for allocating small and medium-sized sites suitable for housing in their area. Paragraph 71 goes on: where an allowance is to be made for windfall sites as part of anticipated supply, there should be compelling evidence that they will provide a reliable source of supply. Any allowance should be realistic having regard to the SHLAA, historic windfall delivery rate and expected future trends.

2.8. Whilst it is noted that the delivery of large scale sites can result in the delivery of large numbers of new homes, it is apparent that such developments take considerable time to work their way through the planning system to an approval and even then are only at outline stage. The delivery of new homes is therefore reliant on the Councils to efficiently determine reserved matters applications and, thereafter, discharge of conditions, to allow a swift implementation of planning applications and a timely start on site for the delivery of housing.

2.9. The inclusion of small and medium sites (ie. not reliant on strategic sites) within the housing mix
are invaluable in delivering housing quicker and potentially in places, perhaps outside the main settlements, which would allow new housing to be accessible to all which is one of the key facets of the NPPF.

2.10. This approach would assist with maintaining delivery of housing where existing allocations are either stalled or progressing slowly through the planning system or have simply been delayed in coming forward for perhaps other commercial reasons.

2.11. The plan is largely predicated on strategic sites, as detailed at Policy H2 which would provide 7,195 houses. This is a significant reliance on the strategic sites to deliver 75% of the overall housing target and much of them are predicated on the works to the A27 being completed in order to make them acceptable.

2.12. It should be noted that the above housing provision is predicated on the ability to identify mitigation for the impacts on the European environmental designations (including nutrient neutrality), addressing highway implications and negotiating the planning system.

The Manhood Peninsula

2.13. The preferred approached version of the Local Plan does include moderate growth for the settlement hubs of Selsey (250 dwellings) and East Wittering (350) and the service village of Hunston (200). However, since then several planning permissions have contributed to the moderate levels of growth on the Manhood Peninsula which the Council says has accounted for these housing numbers. The plan does not therefore include any strategic allocations on the Manhood Peninsula in recognition of this recently permitted growth and the ongoing constraints the area faces, save for 50 dwellings to come forward at North Mundham.

2.14. This approach is not considered sound as a reason to prevent development of any scale on the Manhood Peninsula (particularly Selsey) for the plan period. As detailed above, it is essential that the plan allocates land across its settlement hierarchy in order to maintain a sustainable and deliverable approach to development and to assist the continuing evolution and economic viability of settlements which rely heavily on tourism and also on new development to maintain
the supply of homes to provide options for all sectors of the local community to be able to live on the Peninsula should they so wish.

2.15. It is noted that at Policy S2 (settlement hierarchy), Selsey is listed as a “settlement hub” which is the second tier of settlement under Chichester city. Whilst this hierarchy, particularly in connection with Selsey is supported it is therefore surprising not to see more housing sites allocated within and around Selsey.

2.16. Given the potential number of environmental constraints on the Manhood Peninsula it is unlikely that sites of any excessive size would come forward and large numbers of dwellings would not necessarily result once the sites had taken account of their environmental constraints. That said, and as reflected above, sites of a size proportionate to their location but below “strategic” size can have an important part to play in the delivery of sufficient housing numbers in the right location at the
right time in accordance with the NPPF.

Housing

2.17. Policy H1 (meeting housing needs) sets out the housing requirement for the full plan period of 1 April 2021 to 31 March 2039 as 10,350 dwellings. This allocates 963 dwellings to the Manhood Peninsula and a windfall (small site allowance) allocation of 657 dwellings for the whole district. There are no strategic locations/allocations on the Manhood Peninsula under Policy H2 which is considered unsound, particularly given the position that Selsey holds in the settlement hierarchy. Furthermore, under Policy H3 (non-strategic parish housing requirements 2021-2039) Selsey has been allocated zero housing. Again, this is considered unsound as it prevents sustainable development and access to new houses for all settlements across the district.

2.18. An overreliance on consented sites coming forward to provide future housing is considered unsound as, in this case, it effectively prevents any further development on the Peninsula and in Selsey in particular.

Transport

2.19. Policy T1 (transport infrastructure) is specifically aimed at ensuring that integrated transport measures will be developed to mitigate the impact of planned development on the highway network, improve highway safety and air quality, promote more sustainable travel patterns and encourage increased use of sustainable motor travel, such as public transport, cycling and walking.

2.20. The council will work with National Highways, WSCC, other transport and service providers and developers to provide a better integrated transport network and improve accessibility to key services and facilities. The policy lists seven ways in which the key objectives of reducing the need to travel by car, enabling access to sustainable means of travel, including public transport, walking and cycling; managing travel demands; and mitigating the impacts of travelling by car can be achieved.

2.21. Whilst it is not intended to go through all of these in this document it is noted that all parties are expected to support the four objectives by working with relevant providers to improve accessibility to key services and facilities which would be relevant to Selsey (see below).

2.22. The policy is also aimed at planning to achieve a timely delivery of transport infrastructure on the A27 and elsewhere on the network which is needed to support new housing, employment and other development identified in this plan. The phasing of delivery of new development to align with provision of new transport infrastructure such as improvements to the A27 and elsewhere on the highway network, will be key to managing impacts on the highway. This is yet another impediment to the delivery of a strategic allocations and larger scale development which would, by their very nature, generate a higher highway impact on the transport network than carefully planned smaller developments which could satisfy a much more localised need and be cause less impact on the strategic road network. The tariff proposals outlined at paragraph 8.20 only covers part of West of Chichester and Tangmere SDLs and not the other strategic sites outlined at Policy H2.

2.23. Critically it is also understood that Highways England has pulled funding for the improvements to the Bognor Road roundabout as part of a package of A27 improvements. On this basis it is unclear how further funding would secured at this time.

2.24. The lack of soundness to the approach of significant reliance on strategic sites, due to the current lack of capacity of the A27, is evident in the text that accompanies the policy which states that opportunities to secure funding to implement this package of improvements will be maximised by working proactively with Government agencies, other public sector organisations and private investors. Developer contributions from new development will also be sought. It is clear that smaller scale developments which would have a significantly lesser impact on the highway network could deliver housing quicker and with fewer constraints to implementation. It is for these reasons that smaller sites should be allocated, particularly in the Manhood Peninsula, for development.

2.25. The content of Policy T2 (transport development) is largely supported and considered sound save for the fact that it does not seem to cover the improvement of local transport routes, particularly those that would assist in improving the circulation of traffic around smaller settlements. The policy should be amended to specifically relate to local transport improvements which are locally important to aid traffic circulation and reduce congestion.

Neighbourhood Plan

2.26. The Selsey Neighbourhood Plan does not seek to allocate any sites or residential development, instead relying on those which were allocated in the previous local plan and, in particular, developments at Park Farm/Middle Field and Drift Field totalling 249 houses. It is assumed that this existing commitment accommodates the neighbourhood plan of 150 houses which is the justification for not allocating of residential development in the neighbourhood plan. However, this is short sighted as the neighbourhood plan runs to 2029 and, although development sites are largely controversial within smaller communities there is a lack of recognition of the requirement to provide new houses for existing and future residents (including descendants of current residents) in order to maintain the vitality and viability of the settlement outside of the tourist season where it is recognised that the local population will swell.

2.27. These points add further weight to the considered lack of soundness to the housing policies in the local plan which fail to recognise the need for smaller allocations within the Manhood Peninsula, particularly Selsey.

3 Local Infrastructure Provision

Selsey Road Improvements

3.1. Our clients wish to put forward a potential highway improvement scheme for Selsey which has come about given their extensive historic knowledge of the town and experience of significant congestion along Selsey High Street as a result of an over-reliance of this route by traffic using the caravan parks. It would be a common sense alternative route (to using High Street) which will alleviate congestion along Selsey High Street/School Lane/Paddock Lane/Warners Lane, particularly during the summer months.

3.2. The local plan focusses its attention on the need to improve the strategic highway network but this proposal would provide a significant benefit at a local level in Selsey. As per the attached plan, our clients propose to widen Golf Links Lane from its junction with the B2145 Chichester Road to its junction with Paddock Lane, then widen Paddock Lane and make it up to adoptable standard to enable delivery of holiday traffic to the point where it meets the north eastern corner of White Horse Caravan Park, from which point the road has been made up to carry holiday traffic. At the moment, the northern section of Paddock Lane is just a rough track which is not suitable for ordinary road traffic. It is envisaged that, in conjunction with the owner of the largest caravan parks, Warner’s Lane will also be improved. It is currently a tarmac road in poor condition with no footways and one section is too narrow to allow two vehicles to pass each other. This is not satisfactory for the major access route to the largest caravan parks.

3.3. Golf Links Lane is currently a single track, tarmac road which is in poor condition. It is two-way but much of it is too narrow to allow two vehicles to pass each other. It serves Northcommon Farm, a small housing development on the northern side, Selsey Golf Club and Selsey Country Club (which comprises c.300 holiday chalets and an associated licensed club). It if were to be made up to adoptable standard to the point where it meets Paddock Lane, it would improve access for existing users but, importantly, it would also create a more direct access route (in conjunction with Paddock Lane) for traffic associated with thousands of holiday caravans as well as a touring caravan park.

3.4. Given that a large proportion of holiday traffic and other tourist industry-related traffic (HGVs carrying food and drink, caravan transporters, tractor/trailer transport and public transport) use the route along High Street/School Lane/Paddock Lane/Warners Lane it is considered that this could be diverted from the B2145 Chichester Road further north than Selsey High Street, thus taking traffic away from the congested High Street. An easier, more direct route to the major caravan parks would be an attractive alternative.

3.5. The mechanism to deliver such a proposal is not yet the subject of formal agreement. A large proportion of the land required to widen the roads is within the ownership of Deerhyde Limited (our clients) and the owner of the major caravan parks. The latter has been very supportive of the proposal verbally. A short section of land is not in any specific ownership but our clients have long-standing rights over its use, which can be traced back to 1830. Our clients are serious about facilitating these highway improvements, including the use of their land, which will inevitably have a significant financial impact upon them.

Potential Residential Development Sites

3.6. In order to mitigate the financial impact including both the loss of their land and the implementation of the proposed highway improvements our clients would like to promote two sites for residential development, namely land north of Golf Links Lane (13.5 acres/5.46 hectares) and land west of Old Farm Road for residential development. Whilst the north western corner of the site is located within Flood Zones 2 and 3 it is considered that the developable area of the site would be approximately 4 hectares and could therefore deliver approximately 120 to 140 dwellings. This includes retaining the existing boundary screening along the south eastern boundary and avoiding Flood Zones 2 and 3. An indicative plan is attached to this statement.

3.7. Thawscroft Ltd, an associated company, also owns land west of Old Farm Road, Selsey (2.8ha / 6.9 acres) which taking account of the flood risk constraints along its western boundary could accommodate approximately 50 dwellings. An indicative plan is attached to this statement.

3.8. Having reviewed the planning history of the site it is noted that a planning application (under the name of Thawscroft Limited) was made in December 2016, refused in June 2017 and the appeal was dismissed on 11 June 2018.

3.9. The reasons for refusal related to the following:

1. Site is located outside the defined settlement boundary for Selsey.

2. When the planning officer was giving evidence, he stated that he knew of an alternative site at lower risk of flooding but he would not identify it. After the appeal, an area of land north of Park Lane was identified for 250 houses. The land in question becomes waterlogged in the winter and is highly prone to surface water flooding. It is also only about 250m from Pagham Harbour, a site of major ecological importance with a significant level of protection afforded to it. The planning officer said the real issue with our appeal was one of numbers so it seemed curious to me that a site with a much larger number (250) was identified soon afterwards. Also, the land south of Park Lane (similarly prone to surface water flooding) was in the numbers for 2015/20 but in fact could not be started until 2021 so the planning inspector was misled. I believe that was crucial to the outcome. Landlink have proposed land west of the “Wave” roundabout (opposite Asda). This may be as an alternative for the land north of Park Lane. Neither parcel would be a good fit in the settlement policy area, whereas the land to the west of Old Farm Road would be, a fact acknowledged by planning officers in the past.

3. We did in fact offer to provide contributions towards improving the A27 so that reason for refusal was withdrawn prior to the appeal being heard.

4. As far as I can recall, the Council was content with our proposals in these matters at the time the appeal was heard. The criticism was that the need to avoid Flood Zones 2 and 3 created a narrow site which meant that the layout was said to be cramped. It could be that, with a smaller number of houses, MH Architects could provide an improved layout. Maybe this is reflected in the plan to which Vail Williams refer in paragraph 3.13.

3.10. It is considered that, as detailed above, given the Council’s approach to an over-reliance on large strategic sites to fulfil its housing need and the lack of sites identified for development on the Manhood Peninsula (and in Selsey in particular) during the plan period this site could be proven to be an appropriate location for development as a “windfall site” to help maintain housing supply whilst the strategic sites are in the planning system.

3.11. It is considered the dwellings on the site could be laid out to avoid the Flood Zones 2 and 3 and therefore be at considerably less flood risk than the proposal which was dismissed at appeal. This is set out in the enclosed plan. This would overcome reason for refusal 2.

3.12. Reasons for refusal 3 and 4 would be overcome through the agreement of under Section 106 of the Town & Country Planning Act to provide contributions towards the improvement to the A27 on a proportionate basis to the size of the site and the number of dwellings and also the relevant number of affordable housing units required by policy (or justified as part of a viability exercise). Other matters such as the management of the landscaping, open space, buffers and drainage infrastructure could also be secured by the Section 106 agreement.

3.13. We commend the above highways solution and subsequent development sites to officers in consideration of the draft Local Plan.

4 Conclusions

4.1. It is clear that whilst the overarching strategy of the location of the majority of development in the largest urban settlement of Chichester or adjacent to it is sound the lack of allocation of significant housing numbers to those areas outside Chichester is unsound. This would mean that the vast majority of the district would attract very little housing over the planning period to 2039 thus ensuring that existing settlements would not evolve and would potentially shrink as existing residents and descendants of residents migrate to the Chichester or its strategic urban extensions.

4.2. Outside Chichester, the strategic proposals for Southbourne and Tangmere are similarly isolated. The Manhood Peninsula is particularly lacking in the provision of additional housing sites during the plan period with the justification provided that, for Selsey in particular, recent planning permissions which are being built or have been completed would accommodate all of the housing need going forward for the plan period.

4.3. This approach is flawed for two main reasons (making the Local Plan unsound):

1. The over-reliance on strategic allocations which themselves are constrained by the capacity issues on the A27 and environmental issues such as nitrate neutrality (and any future water neutrality issues which migrate south from the north of Chichester) and the usual impacts on the European sites could mean that these sites are slower in being delivered with little in the way of alternatives allowed for in the local plan.

2. The failure to acknowledge any future development potential of note within the Manhood Peninsula and in particular Selsey will constrain the continued vitality and viability of the settlements within the Manhood Peninsula, particularly following the pandemic when the service sectors are struggling. Taking into account that Selsey in particular but other settlements along the coast within the Manhood Peninsula are reliant on seasonal tourist activity, additional residents are relied upon outside these times in order to provide income for those businesses which may struggle to survive outside the holiday seasons. An effective block on development would significantly reduce the potential future viability of these settlements outside the tourist season.

4.4. The emphasis on the stated urban-focussed housing strategy encourages neighbourhood planning groups/parish and town councils to maintain an opposition to the relevant rather than a proactive policy framework to direct appropriate development within their areas.

4.5. Our clients have detailed above one way which their land could be used in conjunction with others to facilitate a local infrastructure improvement to assist traffic circulation and access in and around Selsey itself which would need to be funded by future residential development and we commend this proposal to you for further consideration.

4.6. We trust that officers will take these representations into account and we look forward to receiving confirmation that the representations have been duly made.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5384

Received: 17/03/2023

Respondent: Reside Developments Ltd

Agent: Henry Adams LLP

Legally compliant? Yes

Sound? No

Duty to co-operate? No

Representation Summary:

On the basis of the 535 dpa figure, it is considered that the selected areas for growth and figures are deliverable over the Plan period, however, as set out in other representations, the plan area could accommodate a greater level of growth.

The Plan relies on the delivery of Neighbourhood Plan and / or small site allocations DPD. This is set out under Policy H3 in the draft document. The wording is not precise and does provide any clear timetable for delivery within the Plan period.
Whilst the strategy in the comments above could be effective, the Local Plan needs to give a clear timescale for completion of the supplementary Development Plan documents in order to give a clear timescale for this to be completed.

Change suggested by respondent:

Higher housing number in Kirdford. Site promoted (Heron's Farm).
Clear timescales for Neighbourhood Plans and Site Allocation DPD.

Full text:

1 Introduction

1.1 This representation provides a response to the Regulation 19: Local Plan Consultation on behalf of our client Reside Developments Ltd. The submission covers the general principles of the Local Plan, but has a focus on Land at Herons Farm, Kirdford, which is in our clients control. The land is shown on the attached location plan included at Appendix 1 and hereon referred to as the
site.

1.2 This representation will provide a written responses in relation to the Regulation 19 Local Plan Consultation which directly relate to the promotion of our client’s land for future development.

2 Comments on Specific Questions/Tests

2.1 In response to the national planning legislation, this Regulation 19 Local Plan Consultation invites comments on three specific questions, and is the final consultation phase, before the Regulation 19 version of the Local Plan is submitted for Examination.

2.2 This representation will respond on these specific questions, and then highlight how our client’s site could help fulfil the full housing requirement for the District. This could be through an allocation within the Council’s Local Plan, or as currently proposed, through a Neighbourhood Plan allocation.

Is the plan ‘sound’?

2.3 Paragraph 35 of the National Planning Policy Framework defines the tests for soundness which
requires the plan to be positively prepared, justified, effective and consistent with National Policy.
These matters will now be considered in further detail in relation to the current consultation on the Regulation 19 version of the Local Plan.

Is the plan positively prepared and justified?

2.4 Policy S1 of the Draft Local Plan sets out the spatial development strategy for the District and how the Council will achieve sustainable growth over the plan period and Policy H1 sets out the housing target in response to the strategy. Both policies have been informed by the Sustainability Appraisal (SA) dated January 2023 and the Plan objectives, which are set out at paragraph 2.5.2 of the SA and the Council’s HEDNA (April 2022).

2.5 The SA then goes on to discuss the potential growth scenarios and confirms two points:
i. Standard method housing figure for Chichester (excluding SDNP) is 638 dwellings per annum, or 11,484 in total over the Plan period
ii. The above figure is capped at 40% above the baseline need and that the uncapped figure is significantly higher than this at 884 dwellings per annum (dpa)

2.6 Of particular note is that point ii. above seeks to cap the overall housing increase by no more than 40% above the previously adopted LP housing figure of 435 dpa. The Local Plan then goes on to constrain housing numbers due to an alleged capacity concern along the A27 strategic road network. The Council therefore result in a constrained housing figure by virtue of the standard
method ‘steps’ and also due to infrastructure capacity. It should be noted that the 435 dpa figure within the 2015 Local Plan was similarly constrained and an early review was the only basis for accepting this reduced housing figure. This early review did not take place.

2.7 In terms of the influence of the A27, this is the key matter that constrains growth within the southern part of the District. This is based on the evidence base documents that state that the road network cannot accommodate an annual housing figure of more than 535 dpa. This is a fundamental point and one that is not agreeable as we believe there is capacity to accommodate at least the local housing need within the highway network, alongside potential improvements
identified for the following reason.

2.8 The Transport Study (January 2023) is the key document on which the Council rely upon to constrain their housing figure to 535 dpa. On review of this document, it is clear that the Council’s consultants undertook a sensitivity analysis as to whether the core scenario that supports the 535 dpa position in the local plan could accommodate a higher level of growth. The conclusion in paragraph 5.6.5 and 11.2.3 of the Transport Study appears to be that 700 dpa could be
accommodated (in the southern plan area) by the mitigation proposed for the 535 dpa core test, with some additional, and as yet undesigned and not costed, mitigation works beyond those highlighted for the Bognor and Fishbourne roundabouts.

2.9 Accordingly, the Council’s own evidence base has undertaken the assessment and concluded that a higher growth figure could be accommodated on the A27, subject to appropriate improvement works. Given the testing of the higher growth figure, which appears to accommodate the higher growth figure, the exceptional circumstances to constrain growth, as set out at paragraph 60 on the NPPF do not exist and the Plan could be considered unsound on this point alone.

2.10 As a result of the above, the SA does not consider a scenario where the Council would meet its local housing need, nor a scenario where it exceeds its local housing need, which is of relevance given the scale of development expected for adjoining authorities, including the highly constrained SDNP area.

2.11 It should also be noted that the draft Plan does not therefore address any need in relation to unmet need of neighbouring authorities and it does not contain evidence to suggest that these matters have been discussed with the adjoining Authorities. Notably, Arun District Council have confirmed that they will be objecting to the Plan and currently proposed on the basis that they have a significant housing need themselves. This is likely to be further influenced by unmet need from Chichester, who again are seeking to constrain housing requirements, which was the case
in 2015 and the subsequent knock on from that was for Arun to address some of that need in their 2018 Local Plan.

2.12 Given that we do not accept that the A27 capacity matters present a ceiling in terms of housing delivery (based on the Council’s Transport Study comments and that of its own consultants), it is not accepted that the Plan and associated SA demonstrates reasonable alternatives have been considered and it is not therefore positively prepared, nor is their approach to housing figures justified.

Effective?

2.13 On the basis of the 535 dpa figure, it is considered that the selected areas for growth and figures are deliverable over the Plan period, however, as set out above, the plan area could accommodate a greater level of growth.

2.14 It should also be noted that the Plan relies on the delivery of Neighbourhood Plan and / or small site allocations DPD. This is set out under Policy H3 in the draft document. This states the following in terms of delivery:
‘If draft neighbourhood plans making provision for at least the minimum housing numbers of the relevant area have not made demonstrable progress the council will allocate sites for development within a development plan document in order to meet the requirements of this
Local Plan.’

2.15 The above is not precise and does provide any clear timetable for delivery within the Plan period.
Whilst the strategy in the comments above could be effective, the Local Plan needs to give a clear timescale for completion of the supplementary Development Plan documents in order to give a clear timescale for this to be completed.

Is the plan consistent with National Policy?
2.16 On the basis of the comments above, the approach to selected sites for allocation based on the
535 dpa figure is considered to be consistent. However, due to the lack of evidence to demonstrate this, the 535 dpa figure should be capped. Given the A27 capacity points raised, the draft Plan does not appear to meet the exceptional circumstances allowed for at paragraph 61
of the NPPF to justify their alternative approach. The Plan as proposed is therefore inconsistent with NPPF when read as a whole.

3 Approach to development in Kirdford

Overview

3.1 The Draft Local Plan defined Kirdford as a service village, which benefits from some local facilities and services including a village hall, a local shop and two pubs. The village has been allocated 50 units within the draft local plan and is therefore suitable for a quantum of growth. The Sustainability Appraisal (SA) identifies Kirdford as a village with some facilities, albeit that due to the absence of a school, these are limited. The SA notes that the delivery of community infrastructure would be required to accommodate any quantum of housing, our client’s land provides ample opportunities to provide this infrastructure alongside housing. The HELAA
identifies a number of sites which could come forward through the Neighbourhood Plan process.

Sustainability Appraisal

3.2 Section 5.4 of the SA states that it is important to consider each of the settlements within the plan area, and explore reasonable growth scenarios. 5.4.2 continues this, stating that there is a clear need to explore a wide range of growth quantum scenarios in the northeast plan area.

3.3 The Sustainability Appraisal addresses the constraints of this area in terms of its rural locality,
unsustainable travel patterns and achieving water neutrality. 5.4.7 sets out that there are three reasonable growth scenarios for each of the four Parishes in the Northeast plan area, if the option of a new settlement at Crouchlands Farm is ruled out as unreasonable. 5.4.8 states there is a strong argument to suggest that this option is unreasonable, nevertheless, it has been
deemed appropriate to take the option forward to consideration. Within the SA, the Council justifies their approach which comprises a blend between Scenario 1 and Scenario 2 as described below:
 Scenario 1 – Lower growth scenario across all parishes – This would relate to an allocation of 50 units to Kirdford.
 Scenario 2 – Higher growth scenario across all parishes – This would relate to an allocation of 150 units to Kirdford.
3.4 The SA sets out that it is fair to rule-out the lowest growth scenario for Kirdford (growth at committed sites only). The SA also sets out there is an argument for ruling out the highest growth scenario (300 homes) as unreasonable, as Kirdford is poorly connected and does not benefit from a primary school. The SA sets out three growth scenarios following the above. These scenarios relate to 50 homes, 150 homes, and 300 homes.

3.5 A blended approach for Parishes within the Northeast plan area has been supported within the
SA, attributing the Scenario 1 model (lower growth) to Kirdford.

3.6 The reasoning given by the Council for attributing the lower growth figure to Kirdford relates to the unsuitability of the northeast plan area as a whole, including unsustainable travel patterns, risks to achieving water neutrality and settlement specific concerns relating to the potential impacts of growth of Kirdford.

3.7 Whilst these concerns raised within the SA and those regarding the existing infrastructure of the village are noted, we believe that the need to support the growth of existing villages, and the ability of development to create and enhance infrastructure should be afforded weight when considering the housing numbers attributed to the village.

3.8 The SA raises concerns surrounding the HELAA options towards the North of the village. This is mainly due to the connectivity to the village and road network, and environmental concerns.
These concerns will be addressed later in this representation.

3.9 It should be noted more broadly that higher growth scenarios can provide more significant community infrastructure enhancements to the area.

4 Suitability of Site

Site Description

4.1 Our client’s land is located to the North of the main settlement of Kirdford, which is situated in the northeast of the District. The plan submitted alongside this statement includes land edged in red, to be considered for housing/community uses, and land in blue for biodiversity enhancements. For ease of reference, the red area has been split into Area A, Area B and Area C,
which correspond to the split of the site in the HELAA. The site is connected to Kirdford by Footpath 610 and 606. As mentioned previously, the site was previously submitted to the Council’s call for sites and is included in the most recent HELAA.

4.2 The Southernmost part of our client’s land is annotated as Area A on the drawing included at
Appendix 1 (HELAA reference HKD0007). The site was considered to be potentially suitable, subject to detailed consideration of access, and heritage impact. We believe that through well considered design, there is clear potential for development on this parcel as the site is well connected to the P.R.O.W and local transport network. Footpath 606 runs along the Northern
boundary of the site, and Footpath 610 runs along the Western boundary of the site which provide access to the main settlement of the Kirdford. The access track to Heron’s Farm is adjacent to the Eastern boundary of the site. Whilst the concerns relating to connectivity are
noted, we believe there is strong evidence to suggest the site is well connected to the settlement, and there are achievable technical solutions to access.

4.3 The central parcel of our client’s ownership is annotated as Area B on the drawing included at
Appendix 1 (HELAA reference HKD0009). The site has been considered potentially suitable subject to consideration of access and landscape matters. The site is immediately adjacent to the to the established residential development at Bramley Close, and an allocated site with planning permission (HELAA reference HKD0002). We are of the view that there are technical solutions to access at the site, which can be explored as part of our ‘next steps’. Footpath 610 provides pedestrian links to the main settlement. Further to this, we are of the view that development of this site to the North of the settlement appears as a natural continuation of Kirdford. This is due to the presence of the adjacent site to the West, the sports pitches to the North, and the shaping of the existing woodland. Initial landscaping works have been completed, and it has been concluded that appropriate landscape-led masterplanning, and green infrastructure plans can
be provided as part of any prospective development, which would allow the landscape characteristics of the site and its locality to be retained and enhanced. The site provides an opportunity to introduce a new landscape framework within the parcels and enables any
proposed development to sit within a treed landscape. Further works for the site would look to come forward following liaison with the Parish Council, which could include further landscaping evidence.

4.4 The Northernmost parcel is annotated as Area C on the drawing included at Appendix 1 (HELAA
reference HKD0011). The site was deemed to be potentially suitable for residential development subject to considerations of access. As set out previously within this statement, the site has potential vehicular and pedestrian links to the settlement, and the wider transport network. We feel there are multiple technical solutions to achieving access to the site.

4.5 Whilst noted that in order to ease the consideration of the site, it is necessary to divide the site into sections, we are of the view that our clients land should be looked at more strategically. The SA sets out that the delivery of community infrastructure would be required to accommodate any quantum of housing and we would look to provide this within our clients ownership. The
provision of this infrastructure will be subject to consultation with the Parish Council and local
occupiers to understand what community infrastructure would be sought for the area. Further, the parcels provide an opportunity to introduce a new landscape framework and enables any development to sit within a treed landscape. The land within our client’s control is considered to have potential to accommodate a quantum of up to 200 dwellings, including provision for selfbuild units.

4.6 The area outlined in blue is put forward as land for biodiversity enhancement, which could be delivered as part of any application.

Sustainability

4.7 The site is suitably located to deliver a host of benefits to the local area and help achieve objectives of the northeast of the District, without harm to the key attractions for visitors, the setting of the National Park, or the rural character of the locality.

Water Neutrality

4.8 One of the constraints of the north-east of the District is the requirement is for all new development to meet water neutrality, to ensure that any new it does not impact further on the habitat site comprising the Arun Valley Special Area of Conservation (SAC) or the Arun Valley Special Protection Area (SPA) & Ramsar site, in terms of groundwater abstraction within the Sussex North Water Supply Zone. It is anticipated that further advice and a mitigation strategy will be created by the Council and its partners to demonstrate how developments can achieve water neutrality. However, at present applicants are required to provide a water neutrality strategy to demonstrate how the development can achieve water neutrality.

4.9 To provide the Council with reassurance that the site is deliverable despite this constraint, it should be noted that our client has worked on other sites with this constraint, and has developed approved strategies in this instance to mitigate development.

5 Conclusion

5.1 Whilst we understand the approach the Council has taken in terms of the selection of sites to meet the 535 dpa figures, we consider that the Plan area is capable of accommodating a greater housing quantum. This will facilitate development and help villages in particular to flourish and meet the objectives of the Local Plan. The Council have failed to provide sufficient justification
for not meeting its housing need in full and have not suitably considered unmet need from adjoining authorities. The latter is particularly relevant given constraints of the SDNP. The Council’s position of growth is predicated on the basis of the A27 not having sufficient capacity to accommodate a higher growth of 535 dpa. Its own evidence base (Transport Study 2023)
contradicts this position and therefore the Council should at least be meeting their local housing need and also considering what part it can play with meeting unmet needs for the adjoining authorities.

5.2 Our clients land is well placed to assist in the delivery of a sustainable expansion of Kirdford, and
deliver both much needed housing within the north-eastern plan area, but also provide highquality infrastructure within the area. The allocation of a greater quantum of housing to the village will support the vitality, and viability of services and facilities within the Northern villages.

5.3 At present, the Plan fails to be positively prepared and is inconsistent with the NPPF. On the basis
that the Council don’t reconsider their position, we wish to be present at the relevant Examination hearings to represent our clients’ interests and further discuss the views set out in this submission. Our next steps will include liaison with the Parish Council in order to best
understand what they would like to see from development proposals within the area.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5408

Received: 17/03/2023

Respondent: Landowner at Champions Farm, Wisborough Green

Agent: Southern Planning Practice

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

We are aware that the Wisborough
Neighbourhood Plan is in the late stages of its review, a regulation 14 consultation took place in June 2021, however, there has been a long pause since this time. Whilst the Neighbourhood Plan seeks to allocate some sites for housing, the housing need figure is not specified, and the current proposed allocations would not provide the 75 dwellings which have been indicated. Further, it is considered that the Local Plan is being over reliant on the Neighbourhood Plan process, and the Development Plan should make provision for the identified housing requirement without the need to rely on Neighbourhood Plans bringing forward sites.

Change suggested by respondent:

As such, we would encourage the Council to look to allocate the land at Champions Farm for development within the Local Plan, or at least as a development plan document in order to meet the requirements of this Local Plan and deliver the identified 75 homes in Wisborough Green.

Full text:

Summary

Southern Planning Practice Ltd are instructed by the landowner to submit representations to the Proposed Submission version of the Chichester Local Plan 2021- 2039, published in February 2023. Shorewood Homes, a local developer, have an interest in land at Champions Farm, Wisborough Green and are currently working collaboratively with the landowner.

The site is located to the south of Newpound Lane and to the north of Billingshurst Road (A272) in Wisborough Green. The site is located within the northern area of the district and is closely related to the main urban area of Billingshurst, which is located in the neighbouring authority Horsham District Council.

It is understood that the site has not been previously promoted through the Local Plan process. We can confirm on behalf of our client that the site is now available for development.

In order for the Proposed Submission Local Plan to meet the ‘positively prepared’ test of soundness as required by paragraph 35 a) of the National Planning Policy Framework (NPPF), the Local Plan Review must:

“provide (ing) a strategy which, as a minimum, seeks to meet the area’s objectively assessed needs; and is informed by agreements with other authorities, so that unmet need from neighbouring areas is accommodated where it is practical to do so and is consistent with achieving sustainable development”.

Whilst the constraints of the northern area of the district are appreciated, there are several sustainable sites, outside of the National Park and other constrained landscapes, which would assist Chichester to meet their identified housing needs. One such site is the land at Champions Farm in Wisborough Green. The western section of the site could be delivered in the short-medium term and the eastern section could be delivered in the longer term which would contribute to Chichester’s future housing supply.

Any new residential development on land at Champions Farm would contribute to the achievement of the 7 strategic objectives of the Local Plan and would also help to boost the housing supply in the short-medium term.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5410

Received: 17/03/2023

Respondent: Mr and Mis Butterfield and Waldron

Agent: Rodway Planning Consultancy Ltd

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Site submitted - Fourways, Fishbourne. 9 dwellings.

Change suggested by respondent:

Include site as allocation.

Full text:

See attached for full submission.

Conclusion
In light of all the above we contend that Site HFB0023 (Fourways) should be reconsidered for allocation for housing development in the Draft Plan. The Site is positively assessed in the HELAA, and is situated adjacent to existing housing and roads. Fishbourne is an area that is clearly suitable for new housing, as acknowledged in the Draft Plan. The Site is previously developed and provides an opportunity for new housing in a sustainable location, without encroaching onto greenfield land.
In this context the natural next step would be to add the Site to the Draft Plan as additional site allocation for residential development.
We put this Site forward with the intention to provide high quality housing in an area with an identified need. We have made it clear in the above representations that the Site is eminently available, sustainably located and can provide much needed new residential units.
The Site is unconstrained by any landscape or other planning designations. The work that has been undertaken, and the conclusions of which clearly identify that the Site is suitable for development.
In our opinion, the Draft Plan should be modified now, so as to allocate our Client’s land opportunity at Fourways for residential development, which would make a notable contribution to the minimum amount of housing that Fishbourne is required to accommodate during the Plan period.
Parallel with an allocation, the Settlement Boundary should also be amended so as to encompass the entirety of our Client’s land.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5415

Received: 17/03/2023

Respondent: Jennifer Asser

Agent: Genesis Town Planning Ltd

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

As the Non-Strategic Parish Housing requirements set out in this policy are based on the dwelling requirement set out in Policy H1 which itself fails to provide for the housing needs of the plan area it has not been positively prepared. In addition it does not take into account the unmet needs of neighbouring authorities or nearby authorities in the same sub-region and as such is not effective. As a result of the inadequacies Policy H3 is not consistent with national policy, and overall it does not comply with the tests of soundness.

Change suggested by respondent:

When revised dwelling requirement is established for Policy H1, housing figure in Policy H3 for Westbourne should be increased above currently proposed figure of 30 dwellings. Westbourne is a sustainable location for additional development, recognised by allocations in previous Local Plans and more recent housing allocations in ‘made’ Westbourne Neighbourhood Plan 2021. Less likely to generate traffic movements on the A27 Chichester Bypass.

Full text:

See representations

Attachments:

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5515

Received: 17/03/2023

Respondent: Bellway Homes (Wessex) Ltd

Agent: Chapman Lily Planning

Representation Summary:

Bellway note the contents of draft Policy H3. Given that this draft Policy wouldn’t impact upon the deliverability of the Police Fields site, no further comments are proffered.

Full text:

See attachment.

Attachments:

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5537

Received: 17/03/2023

Respondent: Stagecoach South

Representation Summary:

The approach is consistent with the plan’s spatial strategy. It generally avoids a dispersal of development to locations likely to be highly car dependent. There is a clear focus on meeting housing needs in the far north-east of the District at the largest and most sustainable settlements, such as Loxwood, Kirdford and Wisborough Green. However, it must be pointed out that public transport availability in this area, provided by the County Council through services it procures, is minimal. These settlements in practice require each adult and child of secondary school age to have access to motorised transport to fully participate in society. This might justify significant measures to secure a boost in the frequency of bus services between Guildford and Billingshurst, passing through these settlements.

Otherwise, existing commitments in the plan area already make provision to meet for local needs. To the degree that there is an unmet local requirement for affordable housing of a small scale – for example to support the rural economy – this could be met through neighbourhood plans or through Rural Exception Sites.

Full text:

Chichester District Local Plan 2039 – Pre-Submission (Regulation 19) Consultation

1. Introductory Comments
Stagecoach South is the main commercial public transport operator across Chichester District. The Company has headquarters in the city, which is also the principal public transport hub for the District and it’s rather wider travel-to-work area encompassing much of the Arun District. Our services extend throughout and beyond the District boundaries, as far as Littlehampton, Midhurst, Havant and Portsmouth. The vast majority of services operate on a commercial basis – that is to say, sustained by passenger use and fare revenue, including concessionary reimbursement.

While the role of the railway is significant in much of the District, especially the east-west Coastway line, yet bus services account for more boardings locally than the railway, with Chichester depot services carrying over 3.5m passengers each year.

Unlike bus services in other parts of the country, the local network has recovered strongly after the pandemic with fare-paying passenger numbers over 95% of 2019 levels, albeit with concession patronage somewhat lower. This has helped secure not only a stable but growing bus network even during this period of rapidly rising operational costs, avoiding the need for the service contractions seen in other regions. Indeed, during the second quarter of 2023 Stagecoach will invest £5.5m in brand-new vehicles for high-profile coastal Service 700 – one of the largest vehicle investments for Stagecoach Group this year.

Our services are therefore critical to existing and future local connectivity. As the Plan acknowledges, mobility demands do not respect planning authority boundaries. The role of our services is especially high to settlements in the broad A27 corridor, within the District and beyond. This includes major settlements in Arun District such as Pagham and suburban Bognor Regis, where bus is the only mass public transport option. As the Council is well aware, there is an even higher level and rate of committed development envisaged in these locations in the Arun District Local Plan than in Chichester.

It is already evident to the planning authorities, West Sussex County Council and National Highways, as proprietor of the A27 Trunk Road, that accommodating growing mobility demands across Chichester District and especially around Chichester itself, is becoming increasingly challenging to the point of being seriously problematic.

Stagecoach has a particular interest in this Plan arising from:

• The already clear and highly deleterious impact of congestion affecting our operations and their reliability and attractiveness to the public. The effects of these on the approaches to Chichester, and around the A27 bypass are especially severe. If public transport is to retain its existing role – even before the needs of any meaningful growth both in Chichester and neighbouring authorities is considered, are considered – the Council and the Highways Authority need to arrive at clearly-defined measures to protect buses from chronic delay and the damaging impacts arising from the lack of bus network resilience and customer journey times.
• In connection with the above, the need to properly consider the predictable impacts of committed development in Arun District on the transport network and in particular the operation of bus services. The duty to cooperate on cross-border strategic matters is not limited merely to accommodating housing requirements.
• The fact that our entire business premises and operational base at Chichester is the subject of allocation for redevelopment within the Plan period. Specifically, this includes our Head Office, the Bus Station as the operational hub of the network and the key interchange for passenger journeys – including those that involve the railway – and the bus depot required to support the entire operation. Notwithstanding many years of discussions, there is as yet no agreed deliverable strategy to replace these facilities either in the Draft Plan or elsewhere.

Stagecoach broadly supports the vision and priorities of the draft plan. In most respects, Stagecoach supports strongly the spatial strategy and the identified site allocations that flow from it, and the evidence.
However, it has serious concerns about the soundness of the plan as proposed for submission, for important regards outlined in this response. These are made in the light of requirements set by the National Planning Policy Framework (NPPF), in particular at paragraphs 15 and 16; 35, 105-109 inclusive and having due regard to the need for allocations to satisfy 110-112 inclusive in due course as development permission is sought; and paragraph 174.

Paragraph 16c) of NPPF makes plain that strategic plans and policies should “be shaped by early, proportionate and effective engagement between plan-makers and communities, local organisations, businesses, infrastructure providers and operators and statutory consultees” (our emphasis). This makes plain that collaborative and ongoing involvement of public transport operators is both necessary, and separate and in addition to the engagement with statutory consultees. This has not taken place.

Para 1.25 of the draft plan states that “the council has engaged constructively, actively and on an ongoing basis with other local authorities and organisations to address key strategic matters.” Despite the requirements in NPPF and contrary to the statement made, Stagecoach has not been approached or involved in a meaningful, collaborative or ongoing way in the preparation of the Plan.

Our main concerns centre around the fact that the plan strategy is neither backed by sufficient transport evidence. Even more importantly, the plan relies on a wholly car-based transport mitigation strategy despite policy stating that this is not the case, and the track record of the existing Local Plan, based on a very similar strategy, that has failed to bring forward meaningful mitigations to date to prevent traffic conditions substantially worsening. There is no support in policy for the achievement of the Strategic Objectives in the Plan. Nor is there definition of any measures in the 2023 Transport Study to make provision for sustainable transport infrastructure or services – much less materially improve them.

Finally, to the extent that updated transport evidence has been provided in the form of the 2023 Chichester Transport Study, arising from updated traffic modelling, it does not support the contention that highways capacity constraints on and around the A27 justify not meeting the objectively-assessed development needs of the area, as the draft plan contends.


2. Vision and Strategic Objectives

2.1. Issues and Opportunities
Stagecoach Objects because the Plan:
• does not comply with the duty to cooperate
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant, proportionate and up to date evidence
Stagecoach recognises the important role of the West Sussex and Greater Brighton Strategic Planning Board which agreed a Local Strategic Statement (LSS2) in early 2016 to identify spatial planning issues across the wider area. This established strategic priorities and policies to guide longer term strategic growth in a coordinated and well considered matter. This institutional framework and the purpose of the LSS is a highly significant one and is at the heart of efforts to properly fulfil the statutory Duty to Co-operate, including with regard to strategic infrastructure issues, as NPPF requires.

Given the long period of time elapsed since the 2018 Reg 18 consultation and the already very clear constraints on strategic infrastructure capacity, it is of great concern to Stagecoach that the LSS2 has not been updated to reflect emerging issues in the intervening period. A review and update of the LSS2 has only just commenced. This includes a study of projected housing and employment needs, transport impact, infrastructure and spatial options to deliver the required development in the period after 2030. This Chichester District draft plan covers a period extending to 2039 – therefore well beyond 2030 and the nominal currency of LSS2.

However, infrastructure needs are pressing today. Stagecoach is presented with severe highway operational problems on a near-daily basis. During the winter of 2022-23 we have, for example, seen key road links impacted for many weeks by acute disruption arising from flood events. Unpredictable, but seemingly more-frequent, exogenous events expose a lack of resilience in the highway network around Chichester and its travel-to-work area. However, serious, chronic, unpredictable delay has been normalised over recent years, with peak-time congestion having quickly returned after the pandemic. The existing development strategy has failed to bring forward measures having any impact on this to date, and key commitments – notably at west of Chichester Phase 2 and at Tangmere – have yet to commence to further aggravate the issue.

We have no confidence in the transport mitigations proposed in the existing Local Plan and LSS2 being sufficiently effective, even if deliverable at all. Indeed, the existing adopted Local Plan does little more than make vague speculations about the sustainable transport measures that might be achievable. The draft local plan review is no different. It has no ambitions at all for sustainable modes and thus, makes no meaningful provision to meet them.

This is especially relevant in light of the fact that the approach to resolving issues on the A27 around Chichester that were anticipated in 2015-16 have fallen away. LSS2 is thus currently inadequate to act as a part of an up-to-date, proportionate, and relevant evidence base for the Plan.

An update of a traffic model lies at the heart of a 2023 Chichester Transport Study. This talks no account of the existing role of non-car modes, nor can it do so. It is unable to properly evaluate the nature of problems or solutions that involve public transport, or for that matter, other sustainable modes.

Therefore, we consider that the combination of committed and additional development needs that must be accommodated over the whole plan period between 2022 and 2039, in both the Chichester and Arun Districts, require a “first principles” review. This must be based on a refreshed transport evidence baseline of no earlier than 2022 – given that the effects of COVID distort 2020-22 – and the transport infrastructure and service requirements to sustainably support those needs.

Key issues – including substantial changes with regards to transport issues and challenges, as well as potential solutions – thus do not form part of the evidence base that steers this plan. Given long term changes in travel patterns, and mode share that took place during COVID, as well as a local and national policy context that seeks to radically reduce and then eliminate transport-related carbon emissions, this is especially problematic.

The specific problems of congestion and network resilience that are evident on the A27 and the approaches to Chichester remain a set of especially difficult problems that disproportionately affect the efficiency, reliability and attractiveness of the bus network, that evidently demand larger-scale strategic responses involving multiple stakeholders, including bus operators.

Where the effects of development on the national Strategic Roads Network (SRN) are concerned, the approach of National Highways to addressing and responding to the mobility needs of development has now substantially changed following the promulgation of the DfT Written Ministerial Statement LTN01/22. This makes it clear that adding highways capacity is no longer the first or only strategy that should be pursued, but one subordinate this to maximising the potential of non-car modes and sustainable travel.

“Effective and ongoing collaboration” on transport matters has not led to solutions being agreed and published for public scrutiny as part of the plan evidence base. Whatever the approach to modelling and “highways improvements” that may be agreed or pending agreement with the County Highways Authority and National Highways, Stagecoach is neither participant or sighted. This is despite the clear requirements set out in NPPF Para 106 b) that “Planning policies should … be prepared with the active involvement of local highways authorities, other transport infrastructure providers and operators and neighbouring councils, so that strategies and investments for supporting sustainable transport and development patterns are aligned.” (our emphasis).

We therefore consider that the Council has failed to comply with the requirements of NPPF paragraph 25 and 26 that “relevant bodies” are involved in plan-making, especially with regard to addressing the needs for infrastructure. Public transport services and the infrastructure that supports its operation and use clearly fall within matters relevant to plan-making. This is explicit in NPPF Chapter 9 and indeed within the plan itself – for example reference to public transport and sustainable modes in the Vision for the plan.

It should be stressed that the Regulation 18 “Preferred Approach” consultation took place in December 2018 – over 4 years ago and prior to COVID, based on LSS2. The inordinate length of time that has elapsed between the Regulation 18 and Regulation 19 stages greatly challenges the LSS2 and other parts of the evidence base, especially as the pause straddles the COVID epidemic. That would include the transport modelling baseline, and key assumptions in any traffic modelling that took place prior to mid-2022, which is a point at which a reasonable “new normal” post-COVID might be considered to have become established. In that period, Arun District has also adopted its own Local Plan development strategy that accommodates an unprecedented quantum of development immediately east and south-east of the District Boundary – creating additional substantial transport impacts directly affecting the A27 and multiple major approaches to Chichester crossing it.



The established mechanism to fulfil the Duty to Co-operate has thus not operated effectively.
The Plan is not founded on a relevant, proportionate and up-to date evidence base and is thus inadequately justified.

2.2. Spatial Portrait
The spatial portrait is generally succinct and accurate. However, it makes no mention of road-based public transport, the role of the City as a public transport hub, or the range of bus services that provide local connectivity (Section 2.4 and 2.5). The complete concentration of post-16 education in the City itself as just one example of the peculiarities of transport demands in the area, is not highlighted, though this has a profound influence on peak time travel demands affecting the most congested parts of the highway network. Among other things, the role of bus services in supporting the educational system of the plan area is very great indeed.

The potential role of bus in addressing the already-severe transport problems of the plan area and beyond seems entirely overlooked. The spatial portrait is thus clearly inadequate and incomplete.

2.3. Strategic Objectives
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Chapter 9 of NPPF and paragraphs 104 and 105 in particular require that plans should:
“Transport issues should be considered from the earliest stages of plan-making and development proposals, so that:
a) the potential impacts of development on transport networks can be addressed;
b) opportunities from existing or proposed transport infrastructure, and changing transport technology and usage, are realised – for example in relation to the scale, location or density of development that can be accommodated;
c) opportunities to promote walking, cycling and public transport use are identified and pursued;
d) the environmental impacts of traffic and transport infrastructure can be identified, assessed and taken into account – including appropriate opportunities for avoiding and mitigating any adverse effects, and for net environmental gains;…
…The planning system should actively manage patterns of growth in support of these objectives. Significant development should be focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. This can help to reduce congestion and emissions, and improve air quality and public health…”

The Strategic Objectives do not conform with NPPF in these foundational requirements adequately, to transparently steer the plan strategy. They should therefore be amended to read:

“Plan to provide local infrastructure to support new development and seek opportunities to address existing identifiable infrastructure problems deficits, such as in particular those relating to the A27 and its junctions and wastewater treatment.”

Paragraph 2.36 states, in the context of the Climate Emergency and the National Trajectory to “Net Zero” that “The council will enable the delivery of infrastructure, jobs, accessible local services and housing for future generations while protecting, conserving and enhancing the historic and natural environment.”
Naturally, we support this intent.

However, there is no acknowledgement of the role current patterns of transport use contribute to carbon emissions, nor that substantial mode shift is necessary to address sustainably an acute lack of capacity on the local network and the SRN, especially around Chichester. This is especially concerning as the basic conceptual link is not made between the fact that the greatest such problems lie on the A27 corridor and around Chichester, while these are also at the same time present many of the most sustainable locations for development, and where the opportunities to secure much greater use of sustainable modes also exists.

Strategic Objective 7 “Strategic Infrastructure” includes the following statement:

“To work with infrastructure providers to ensure the timely delivery of key infrastructure to support delivery of new development. New development will be supported by sufficient provision of infrastructure to enable the sustainable delivery of the development strategy for the plan area. Key infrastructure to support the Local Plan will include improvements to transport, …

A sustainable and integrated transport system will be achieved through improvements to walking and cycling networks and links to accessible public transport. Highway improvements will be delivered to mitigate congestion, including measures to mitigate potential impacts on the A27 through a monitor and manage process.”
The latest transport evidence in the Chichester Transport Study makes no pretence to define much less to deliver a “sustainable or integrated” transport system. It is wholly devoted to sustaining current levels of car use across the District, to and through Chichester area.

It is no more than the lightest of touches to the approach taken to supporting the adopted Local Plan, an approach that is already almost 10 years beyond the date of its gestation but has yet to deliver any significant capacity improvement schemes, much less any measures that sustain even current levels of public transport journey times and reliability in the face of increasing congestion – much less any betterment.

Of the six key junctions on the A27 around Chichester, recognised to require significant mitigation given they are saturated for extended periods, five accommodate regular bus services - indeed frequent ones at least every 20 minutes in several cases. The sixth at Oving Road, relates directly to a key corridor where bus services are needed to support strategic growth currently being delivered at Shopwhyke, as well as substantial further growth West of Tangmere (proposed allocation A14) and “East of Chichester” (A8), south of Shopwhyke Road.

As stated at p12 of the Study Summary “The modelling shows that all the junctions on the A27 Chichester bypass are well over capacity, even before adding in the Local Plan development and with the exception of Portfield Roundabout are actually shown to be over capacity in the base model year (2014) in one or both peaks”. This much has indeed been evident for years from delay and periodic even more severe disruption arising to Stagecoach services from the lack of network resilience.

The reassignment of through and local traffic through Chichester to avoid the A27 bypass is an especially serious issue for bus services that penetrate the city. This is leading to consequential saturation of a range of junctions used by buses. Rising delay and unpredictable running times are at the root of our decision to sever the long-established Portsmouth to Littlehampton service in 2023, which will in future no longer run across Chichester, but terminate to provide additional dwell time to mitigate the impacts of congestion.

While this congestion affects all road users including businesses and freight traffic, the effect on scheduled bus services is greatly higher, as such services cannot reassign route to ‘beat the queue’. Traffic congestion often encourages greater car use for this reason, in tandem that people are happier to sit for extended periods in their own vehicle on a seamless door-to-door journey than wait at the roadside for a delayed bus making slower progress in lengthy queues.

As the Study admits at para. 1.3.2 “Although, there have been works at the Portfield Roundabout in this timeline, no other mitigation schemes have been completed along the A27 corridor, as such the mitigation schemes defined in this report will also be required to consider the development from this plan period.”

In other words, in the 8 years since the current Local Plan was adopted in 2015, there has been minimal progress is delivering the traffic mitigations. There is no clarity at all when any such mitigations will be brought forward. It is hardly surprising then, that traffic conditions have deteriorated. The “predict and provide” transport strategy supporting the current plan has failed.

Despite this, the Draft Local Plan Review proposed to “double down” on exactly this strategy. It represents, like the rest of the evidence base, a “rolling forward” of the current car-based strategy by 9 years, with the lightest of touches to attempt to accommodate car trip demands from a relatively modest additional development quantum.

Nevertheless, the Study requires a global 5% reduction in trip demands arising from unspecified “credible” (paragraph 4.1.2) sustainable transport and travel planning measures. It is unclear why use of non-car modes will see disproportionate growth when no measures are in place to make them more attractive. This 5% increase in use translates to a doubling in the modal share of bus services. There is no evidence nationally, anywhere, that simple ignorance of alternatives to the car is the main barrier to uptake.

The outputs of the 2023 Chichester Area Traffic (SATURN) model are set out at Table 5.1 (am peak) and 5.2 (pm peak) without mitigation. These betray just how seriously compromised the whole network around Chichester is, and will be in future, even with implementation of a mitigation partake to increase traffic capacity that is understood to cost between £92m and £164m – and which the Study and the draft plan acknowledge cannot be delivered through developer funding sources alone. Unspecified external funding presumably from HM Treasury through DfT is required.

Even if this provided and the schemes are delivered, Tables 8.1 and 8.2 indicate these will provide minimal relief. The final columns suggest key junctions, including Portfield, Fishbourne Road and Cathedral Way East will remain at well over 100% ratio of flow to capacity (90% is considered the point at which saturation is approached, with the onset of increasing delay above that figure). RFCs in tables 8.1 and 8.2 are some of the highest we have ever seen in a local transport evidence base for a post-mitigation scenario. While the serious potential risk of reassignment across Chichester City is greatly reduced, which is important and welcome given its impact on bus services, Tables 8.1 and 8.2 show the extent of post-mitigation saturation is also egregious, covering a very large number of key links and junctions.

On every measure and criterion, then, including cost deliverability and effectiveness, the revised Transport Strategy falls well short of evidence to suggest the transport impacts of the plan can be properly addressed by this means.

Despite the repeated statements about sustainable modes throughout the draft plan and Chichester Transport Study, only 2 paragraphs at Section 6.2 within the Study are devoted to public transport:

“6.2.7 The funds generated from the parking management schemes, local/nation funding schemes and developer contributions could also be utilised to fund potential public transport enhancements within the city centre including an expansion of the bus priority lane system within Chichester City Centre. This could reduce reliance on the car in the longer term towards sustainable public transport. A park and ride scheme could be incorporated within a bus priority lane network in the future depending on the uptake and successfulness of early bus priority trials.

6.2.8 Chichester City centre has a constrained existing public highway network. Therefore, any proposed dedicated public transport or light transit corridors that could be implemented would be at the expense of existing highway. This could be managed through a time-based system where certain routes are restricted to public transport only during specific times. E.g., peak hours.”

There is some very high-level consideration of Park and Ride following this section. None can be considered a serious practical evaluation of consolidating car-borne trips onto bus services, including existing ones, for example local mobility hubs, more frequent bus corridors, delivery of specific bus priorities.

None of the discussion of alternatives to “predicting and providing” for unconstrained traffic growth is rooted in a deliverable evidence base, or proper evaluation of options and specific projects.

To take just one aspect of the few specifics that can be picked out, a workplace parking levy is hypothesised. This would apply only to “offices”, in Chichester city centre (para 6.2.3), without consideration given as to how this could be practically achieved or even that a meaningful amount of office based employment would qualify. Much less is any consideration given to how far focusing a strategy only on office-based workers would actually deliver a particularly significant effect, apart from to create a strong incentive to relocate offices out of the city centre to places out of reach by public transport.

Looking at the Chichester Transport Study 2023 and the draft plan together, there is insufficient evidence that the traffic capacity increase proposed in the 2023 Transport Study is any more affordable or technically deliverable, or likely to be sufficiently effective, than those in the past strategy. The evidence more strongly points to the fact that no highways improvements are identifiable or economically deliverable to meet even short term increases in demand for car-borne mobility on most of the network around Chichester.

There are no published strategies or schemes clearly supporting the contention that the objective of improving sustainable modes is technically achievable or deliverable either. The plan makes generalised assertions that such strategies will be devised and implemented only after serious problems emerge from a shortfall in the car-borne transport strategy.

The reference to “monitor and manage” is undefined and unsubstantiated. There are no outcomes stated, no mechanisms specified and no timescales for action.

Our experience today is that network conditions have reached unacceptable and prejudicial levels of severe unpredictable delay. The saturation of the network is already evident well outside the traditional peaks on key sections of highway and at key junctions. External shocks such as the effects of severe weather are becoming more common, leading to delays so extreme as to justify the description of “gridlock”. The plan does not identify a strategy to effectively address this, in particular by consolidating passenger car trips onto more efficient public transport vehicles. This is unacceptable to Stagecoach.

2.4. Local Plan Vision
Stagecoach Objects because the Plan:
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Stagecoach supports the broad approach in Plan Vision and in particular that by 2039, the Plan will support and enable greater use of sustainable modes. However, there is no link made between reducing the use of private cars, and the need for a step change in the use of sustainable modes. Without a published transport evidence base it is impossible to establish a suitable sustainable transport strategy to support both carbon reduction and alleviation of the problems arising from acute congestion. Even on a very crude basis, to achieve a meaning mode shift on key approaches to the A27 Chichester Bypass will require more than 20% of existing peak car-borne journeys to transfer to other modes. A 10 percentage point transfer to bus (about half this shift) would imply more than doubling peak hour bus passenger boardings.

The Vision is nothing more than an aspiration, that needs to more definitively aim at key outcomes, for the plan to be effective. The Vision should thus be altered to read:
“Get about easily, safely and conveniently with less reliance on private cars –making the greatest possible use of the rail and enhanced bus network, and with more opportunities for active travel including walking and cycling; to materially reduce dependence on private car use.”

Underpinning the Plan’s spatial strategy, the Vision section goes into more specific detail about key localities in the Plan area.

Regarding Chichester, Paragraph 2.39 states: “The emphasis will be upon consolidating and enhancing the role of Chichester city as the plan area’s main centre, whilst also developing the role of key settlements to its east and west. The focus will be upon creating communities with good access to a range of employment opportunities and affordable housing for young people and families to balance the ageing population.”

This is clearly the appropriate focus for meeting the District’s development needs in a sustainable manner. The city and key settlements to the east and west, are those places already able to make use of relevant public transport services, both rail and bus. Especially within and near the City, walking and cycling can credibly present highly relevant choices. This emphasis clear can be expected to address the requirements of sustainable development set out in NPPF and their local application set out in the Plans Strategic Objectives.

However, this needs a robust transport strategy, to avoid a further concentration of development and its traffic impacts occurring on or near some of the most chronically congested parts of the highway network. To date, the absence of intervention has strangled the bus network through further marked deterioration in traffic conditions. This by consequence increases the risk of bus delay or cancellation, lengthens journey time and reduces customer confidence in bus as an attractive alternative mode of travel.

In April 2023, Stagecoach is making significant timetables changes to improve operational resilience in and around Chichester. The biggest such change is the severance of the Portsmouth to Littlehampton section of service 700, at Chichester, with buses operating independently to the east and to the west and ending cross-city links. This is planned to reduce the probability of delay but at the cost of additional vehicle resource (circa £200,000 per annum) which could be better spent providing new or enhanced services. We anticipate a small loss of custom as a direct consequence of the change, but have little choice other than to take negative action so as to fulfil our statutory punctuality obligations.

If the Strategic Objectives of the Plan and its Vision are to be achieved, in the way required by NPPF paragraphs 104-105, a properly-evidenced transport mitigation strategy needs to create the conditions where bus journeys are more reliable than car journeys and thus mobility demand switches as far as can be realistically achieved away from car use, to bus use and other more sustainable modes.

Beyond Chichester, the Plan Vision focuses on key localities beyond to the east and west.

To the west of Chichester a focus on growth at Southbourne is justified at paragraph 2.43: “…the aim is to take advantage of the village’s good transport links and existing facilities to deliver significant new residential-led development within the broad location for development which will further enhance local facilities and offer opportunities to reinforce and supplement existing public transport, including bus routes.”

We agree this is a very significant opportunity. However, if the requirements of NPPF paragraphs 104-105 are to be met, this demands that effective bus priority is delivered on the A259 corridor, especially eastbound at Fishbourne and westbound approaching Emsworth. Without such measures, the growth committed and planned will serve only to further undermine bus journey time and decrease punctuality on the existing 700 service, entirely contrary to the aims of the Vision.

The emphasis on the A259 corridor served by Stagecoach 700 west of Chichester is reinforced at paragraph 2.45 stating that “Between Chichester and Southbourne, the Plan provides for more moderate levels of growth within the parishes of Fishbourne, Bosham and Chidham & Hambrook, … with opportunities to support and expand existing facilities and for increased use of public transport options”. We strongly support the principle, but the Plan must follow through with specific public transport priority measures that facilitate rather than prejudice such an outcome.
East of Chichester the focus is at Tangmere, where the existing allocation for about 1000 dwellings is being uplifted by 300. Paragraph 2.44 justifies this among other things recognising the scope for “…improved and additional bus services and cycleways will provide better connections to Chichester city and east to Barnham and the ‘Five Villages’ area in Arun District.” We unequivocally endorse this conclusion. Realising a “game-changing” level of bus service quality, reliability and frequency east of the city, also serving committed and planned development north and south of Oving Road at Shopwhyke, is equally essential, given that all SRN links and junctions are approaching equal saturation.

The National Bus Strategy has given new focus on partnership with West Sussex County Council to discuss and deliver a significant new bus service between Chichester, Shopwhyke, Tangmere, Eastergate and Barnham, supporting committed development and acting as an initial phase of what ought to be a more ambitious longer-term strategy to support growth beyond 2025 in both Chichester and Arun Districts. For these improved bus services to be both deliverable and effective, robust bus prioritisation is unavoidable. No such measures are proposed in the Plan or its evidence base and we therefore suggest inclusion of plans to facilitate safe and efficient bus operation between Tangmere and Nyton/Eastergate, ideally avoiding the need to join A27 through-traffic entirely.

We welcome the clear recognition that these localities identified for growth, benefit from existing relevant public transport services. The Vision also sets an expectation that bus services in particular should be “enhanced” and “reinforced”.

We entirely agree that these opportunities exist, across the broad strategy and strategic allocation proposed by the draft Local Plan. Securing them will be crucial to achieving national and local policy objectives, including the Strategic Objectives. However, to our continuing very great dismay, the Plan goes no further to defining how this will be achieved. As such the Vision is not demonstrable achievable or deliverable.

Accordingly the Plan cannot be considered effective, in the sense of NPPF.

Remedying this, demands specific measures to protect bus services from congestion in the following corridors:

• A259 East of Emsworth
• A259 Fishbourne
• A 259 Via Ravenna/Cathedral Way
• A286 Stockbridge Road north and south of A27
• B2145 Whyke Road/Hunston Road
• A259 Bognor Road, east and west of A27 and extending to the District Boundary
• B2144 Oving Road/Shopwhyke Road east and west of the A27
• A 285 Westhampnett Road/Portfield Way/Stane Street, potentially involving a mode filter at the west end of Stane Street

These must be defined to a sufficient level of detail to assess their effectiveness and deliverability, including costs.

This would then allow West Sussex County Council and Local Transport and Highways Authority, ourselves as the principal bus operator, and where appropriate other organisations that would be directly tasked with delivering the mitigation package, to agree service levels and standards necessary to deliver specified outcomes, including journey times, frequencies, capacity and hours of operation on the network, and also in respect of the strategic allocations and Strategic Locations for Growth.

The agreed mitigations strategy should be set out in an up-to-date Infrastructure Delivery Plan backed by clear funding commitments, including a funding strategy to justify necessary developer contributions.

Where necessary to support evidence of effectiveness and deliverability, clear statements of support, which might include Statements of Common Ground between the LPA, LTA, National Highways and Stagecoach, could be provided.


3. Spatial Strategy
Stagecoach Supports
Stagecoach well recognises the constraints outlined in the explanatory narrative at the start of Chapter 3.
In particular we strongly endorse that strategy in that it reflects that the best opportunities to meet housing and employment development requirements sustainably clearly exist in and close to Chichester and on the key east-west movement corridor where – subject to effective measures being delivered to make these modes more attractive, efficient and relevant – sustainable modes can credibly provide for a much higher proportion of movement demands, mitigating most effectively the potential traffic impacts of development.
We agree that the Manhood Peninsula suffers serious environmental constraints, but, added to these, public transport and other sustainable modes cannot provide such attractive alternatives, and significant further development risks merely reinforcing already high levels of car use, aggravated by the carbon impacts of the distances involved – something the plan does very little to evaluate, and makes no reference to.

We endorse the conclusion in paragraph 3.24 that significant development in the part of the District north of the National Park is inappropriate. The rationale is principally on landscape and visual character. This exposes a fundamentally biased approach to plan making that has consistently underplays transport accessibility and carbon issues. In fact, the lack of local services and the extended distances that need to be travelled to fully participate in society in this area, with no realistic prospect of public transport offering relevant choices, ought to rule such a strategy out of play on a far less aesthetic and interpretational basis.

3.1. Policy S1 Spatial Development Strategy
Stagecoach Supports
The Spatial Strategy flows clearly and logically from the Spatial Portrait, and the opportunities and constraints identifiable across the Plan area. It represents a logical and justified continuation of the existing Local Plan strategy. In particular the spatial strategy maximises the potential for sustainable modes to contribute to meeting a much higher proportion of all the District’s mobility and accessibility needs.

3.2. Policy S2 Settlement Hierarchy
Stagecoach Supports
The settlement hierarchy clearly reflects the service endowment and potential self-containment of the settlements in the District. In particular, the second tier of settlement hubs includes secondary schools, which are major peak trip generating uses. Service villages, in the main, also benefit from bus services running at least hourly, which can be expected to provide for a degree of mobility for the higher number of trip purposes that cannot be satisfied by walking or cycling within the immediate locality. Thus, a level of development to meet local needs in this tier is relatively sustainable.

There is a quite broad range of settlements in this category. We have concerns that, north of the National Park, the Service Villages have no realistic public transport choice. These include Plaistow/Ifold, Kirdford, Loxwood, and Wisborough Green. Such as exists is typically a 1/bus per day off-peak shoppers service offering up to 90 minutes in Horsham or Guildford and as such any development here even to meet local needs requires each adult to own a car. This contrasts strongly with Service Villages to the south of the National Park, which are greatly more sustainable.


4. Climate Change and the Natural Environment
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

This section of the plan is extensive and wide ranging, as should be expected.
However, remarkably, there is no acknowledgement whatever of the role of transport in mitigating climate change or its effects, not of the importance of sustainable movement and access being facilitated across the plan area in addressing anthropogenic impacts on the natural world at a more local level.

This exposes very clearly a troubling level of indifference to transport matters in the production of the Plan, which, while nationally quite common, is neither appropriate nor acceptable. The mitigation of transport impacts is not merely a matter speaking to the social and economic aspects of sustainable development. It is crucial to address the causes and effects of climate change that arise from transport, and personal mobility.

This is now well understood and at the centre of national policy, including the National Decarbonisation Strategy for Transport (July 2021) which at Section 5 commits the government to aligning land use planning and transport strategy much more tightly and effectively to mitigate the carbon emissions associated with the current dependence on cars, and the mode mix; but also to reduce travel distances, both increasing the potential relevance and effectiveness of all sustainable modes, and reducing average journey lengths for residual motorised journeys of all kinds.

National statistics show that well over a third of all domestic carbon emissions arise from land-based transport and of these, the vast majority arise from trips of over 10km – outside the range of large scale use of cycling. In fact, the potential of the plan to materially support carbon emissions reduction from within the plan area lies more in the realm of transport than any other policy theme – including emissions mitigation from buildings, which is in any event an aspatial matter and covered by nationally-binding building regulations. By 2025 something like 40% of all the emissions within the plan-area will be transport related.

There is no evidence supplied to support the plan that addresses the transport carbon impacts of the spatial development strategy in a clear manner.

There is no evidence supplied that sets out the effects of potential worsening of congestion on air quality within the plan area, arising entirely from the excess of passenger car movement demands over available and credibly deliverable highway capacity. This is despite the evidence set out and acknowledged in the explanatory memorandum at paragraph 4.130:
“4.130. The council’s Air Quality Action Plan and the West Sussex Transport Plan 2022-2036 both refer to the air quality issues faced by Chichester. There is currently one Air Quality Management Area (AQMA) in the plan area, located at St Pancras, Chichester. AQMAs are designated where air quality exceeds, or is likely to exceed, national air quality standards and objectives. Development within or impacting these areas, or that likely to cause the declaration of any further AQMAs, will be subject to an air quality assessment by the applicant.”

This is a retroactive approach – it is not “planning”, based on evidence.
We are well aware that air quality issues in and of themselves can render allocated sites to be undeliverable: a good example is in the Vale of White Horse, Oxfordshire, where strategic allocations on the A338 and A420 corridors have been held up for years by air quality issues at Marcham and Frilford, in large measure because agreed transport interventions were considered inadequate or undeliverable a very short time after the Plan was examined and adopted.

There is no evidence that shows how the development strategy can effectively mitigate these impacts as well as the further potential impacts that arise from the development strategy. This is exasperating, as there is clear evidence that could be drawn upon to show that that very substantial opportunities exist to:
• Speed buses up and make them more reliable by the delivery of bus priority on most of the key main corridors. Most of these even today operate relatively frequently
• Improve service frequencies and extend hours of operation.
• Secure significant background mode shift to bus as a result, damping pressure on key links and junctions, by consolidating demands on direct more reliable and more frequent bus services.
The spatial development strategy as submitted is in fact, likely to well conform to such additional evidence.

The allocations require substantial additional transport related work and evidence to demonstrate that the opportunities for sustainable transport have been identified and taken up as required by NPPF paragraphs 104-105.

With regards to specific policy, Policy NE22 should be modified to read:
“Development proposals will be permitted where it can be demonstrated that all the following criteria have been addressed:
1. Development is located and designed to minimise traffic generation and congestion
through access to by maximising the relevance and attractiveness of sustainable transport modes, including maximising provision of specific demonstrably effective measures to make pedestrian and cycle and public transport routes and networks more direct, more safe, faster and more reliable;…”


5. Housing

5.1. Policy H1 Meeting Housing Needs
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

The presumption of the planning system is that local planning authorities should seek to meet their objectively assessed development requirements in full. These needs are assessed by a defined Standard Methodology set out in Planning Practice Guidance and elsewhere, that has explicit regard to ensuring that the economic and social effects associated with housing are properly provided for, to avoid exacerbating serious problems that arise from inadequate housing supply.

As a significant local service provider and employer, Stagecoach is concerned that existing issues with housing availability and affordable housing supply are not exacerbated. This has a direct bearing on staff recruitment and retention. It also has an indirect bearing on our cost base.

The existing problems with housing affordability have developed over many decades of undersupply. It should be emphasised that the significant boost to the supply of housing that has been sought by governments over the last 15 years, has only begun to take effect relatively recently in this District. Tackling the problem will require years of consistent attention.

Stagecoach notes that the Council is no longer proposing to meet its identified housing needs in full. Rather than 638/annum the Council is allocating a total that implies an annual delivery rate of 535/annum.

While a number of matters evidently present challenges to the Council in identifying a sustainable development strategy. Paragraph 5.2 indicates that “constraints, particularly the capacity of the A27 has led to the council planning for a housing requirement below the need derived from the standard method…” The blame for being unable to meet housing requirements is thus laid squarely at the door of transport infrastructure and systems.

This conclusion in no way follows from the evidence in the Chichester Transport Study. This, rather, makes the statement that when a higher annualised quantum of 700 dwellings per annum was tested, in the majority of cases the traffic capacity improvement package would perform little differently. To quote the Study:

“5.6.3 The network performance outputs analysed comprising V/C%, Delays (seconds) and Queues (PCU’s) suggest that generally the proposed SRN mitigation identified for the Core Scenario, can accommodate in the most part, additional increase in development to 700dpa.”

Whether the rest of the local road network is similarly protects is moot.

Irrespective of these results, even if the contention made in the draft plan were true, unlike many other constraints, this is amenable to a suitable effective strategy to address the constraints identified being collaboratively conceived. This is what NPPF expects, as set out in paragraphs 104-106.

Where the A27 is concerned, as part of the SRN, National Highways is now working to a substantially revised approach than that in force at the time to current Local Plan was prepared, or LSS2, or reflected in the Chichester Transport Study. This is set out in DfT WMS 01/22. This document is the policy of the Secretary of State for Transport in relation to the SRN which should be read in conjunction with the National Planning Policy Framework (NPPF). It replaces the policies in the Department for Transport Circular 02/2013 of the same title.

It makes plain that to accommodate additional demands arising from development, National Highways (NHC) expects to meet the requirements of its statutory license in a substantially different manner. With respect to development NHC LTN 01/22 continues to address the tensions between national policy for the environment and carbon mitigation, the ongoing need to substantially boost the supply of housing as well as maintain national economic competitiveness and protect the safety of the public. However, in future, the approach will be to seek first to maximise the impact of demand management measures (reducing the need to travel), and then to accommodate residual additional demands first though maximising the use of sustainable modes, rather than accommodating assumptions about current levels of car dependency and use.

LTN 01/22 much more closely and explicitly aligns with the language of NPPF Chapter 9 paragraphs 104-106. Paragraph 12 states: “New development should be facilitating a reduction in the need to travel by private car and focused on locations that are or can be made sustainable…. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas.” (our emphasis).

It continues at paragraph 13: “where developments are located, how they are designed and how well delivery and public transport services are integrated has a huge impact on people’s mode of travel for short journeys. The company will therefore expect strategic policy-making authorities and community groups responsible for preparing local and neighbourhood plans to only promote development at locations that are or can be made sustainable [footnote 8] and where opportunities to maximise walking, wheeling, cycling, public transport and shared travel have been identified.” (again, our emphasis)

Stagecoach readily confirms that the draft Plan development strategy conforms well to the first limb of this expectation, in terms of the location of development.

Stagecoach considers that the plan and its evidence base conforms poorly to the second in that the specific opportunities to maximise walking, cycling wheeling and public transport are not clearly identified, and defined, and proven to be effective and deliverable.

The current mitigation strategy for the A27 Chichester area, supporting the adopted Local Plan and for which proportionate developer contributions have and continue to be sought, reflects now-superseded DfT Circular 02/2013. As a direct result, it failed completely to identify any significant effective bus priority measures, despite the fact that frequent services already exist on the key corridor concerned, and that one bus journey can remove, fully seated between 72 and 80 single occupancy car journeys from congested links and across key junctions on the A27. Rather, it sought to implement targeted measures to increase the throughflow of general traffic.

We recognise the realisation that this approach, which was already reliant on some tenuous logic, is simply not technically viable, especially where further development needs are anticipated.

National Highways will form now pursue an approach with the planning system that “includes moving away from transport planning based on predicting future demand to provide capacity (‘predict and provide’) to planning that sets an outcome communities want to achieve and provides the transport solutions to deliver those outcomes (vision-led approaches including ‘vision and validate,’ ‘decide and provide’ or ‘monitor and manage’). The company will support local authorities in achieving this aim through its engagement with their plan-making and decision-taking stages.” (paragraph 15).

Paragraph 23 is at the fulcrum of assessing and defining transport mitigations to accommodate growth on and near the SRN “Capacity enhancements such as modifications to existing junctions or road widening to facilitate development should be determined on a case-by-case basis. The general principle should be accepted where proposals would include measures to improve community connectivity and public transport accessibility, and this will be weighed against any negative safety, traffic flow, environmental and deliverability considerations, impacts on the permeability and attractiveness of local walking, wheeling and cycling routes, and alternative options to manage down the traffic impact of planned development or improve the local road network as a first preference.” (our emphasis).

However, no material work has been done that seeks to identify if a bold robustly conceived and suitable judiciously-prepared strategy that seeks to consolidate flows on already densely travelled corridor onto improved bus services, driving mode shift through insulating these services preferentially from already serious queuing. This would be likely to have very substantial impacts on all the key junctions on the A27, and potentially, on the A27 itself. The need for an integrated approach between Shoreham and Emsworth within West Sussex paying particular regard to development requirements in both Arun and Chichester Districts naturally lies at the heart of this, and we would expect to be picked up by the LSS3 Review among other things.

However, the locus of the problems and its causes and effects are obviously well enough known to start work on defining solutions within the plan area today. We would expect that this work will be essential if National Highways are to support the Plan, especially now given the terms of Circular 01/2022.

Such work could and should start from a “policy off” position: in other words that the Plan should fully accommodate its needs unless it can be proved that a mitigation strategy for the A27 that is compliant with DfT WMS 01/2022 cannot credibly accommodate resulting capacity demands without unacceptable impacts on the safety and efficient operation of the SRN.

This evidence does not exist. In fact the Chichester Transport Strategy 2023, on which the Council solely relies as its transport evidence base, indicates the opposite at para 5.6.3. This is the case before meaningful measures to secure damping of traffic demands through mode reassignment are even considered.

The exception to this is Portfield and Oving Road, which are among the most problematic areas after mitigation even at the Council’s chosen 535 dwelling/annum scenario (para 5.6.4.-5). The costly capacity mitigation simply cannot deliver enough benefit. It is admitted that WSCC has indicated that it would prefer a solution that places greater reliance on sustainable modes damping car-borne demand. This is entirely the strategy required by NHC to follow LTN 01/22, of course. Despite the fact that “predict and provide has “run out of road” no attempt has been made to examine what such a solution set credibly could looks like. This is unsatisfactory and deeply troubling.

At paragraph 5.4 the draft plan points back again at the West Sussex and Greater Brighton Strategic Planning Board and the future work that has been commissioned, but has barely begun, to update the Local Strategic Statement. This work is to inform the preparation of plans that have horizons beyond the end date of the current LSS in 2030 and properly to meet the Duty to Cooperate. As we said in our response to section 1 of the Plan we fully endorse the conclusion that this is the right mechanism to look at these issues. However, the mechanism has not been effectively applied to the production of this plan. Therefore, the specific evidence that capacity on the A27 in and of itself supports accommodating a lower housing requirement does not exist.

The Plan thus does not conform to NPPF, is not adequately justified and is not effective.

The Plan does not properly meet the statutory Duty to Cooperate.

We will return to this matter in specific representations to Section 7 of the draft plan.

5.2. Policy H2 Strategic Locations/Allocations 2021-2039
Stagecoach Supports
Policy H1 makes plain that the plan, as far as it identifies locations for development has done so in locations that conform with its spatial strategy. All of the strategic allocations to a greater or lesser extend offer clear opportunities to make use of sustainable modes, by virtue of their location. That is not to say that the opportunities to take up these opportunities, and maximise the role of sustainable modes, has been identified, defined and translated properly into the rest of the plan policy suite or Infrastructure Delivery Plan.

As our remaining representations make clear, we support the locations thus far identified as being those that offer the best opportunities to reduce the need to travel, reduce travel distances, and create high quality attractive sustainable travel choices, for both existing residents as well as new ones.

However, the transport impacts of the allocation will individually and cumulatively likely to lead to increasingly severe impacts on the transport network, and on bus services.

Perversely, because these opportunities are not properly identified and secured through the plan and its supporting transport strategy, the opportunities presented by the allocations to secure a substantially more sustainable and lower carbon pattern of movement will not only risk being squandered but may aggravate the wider problems.

5.3. Policy H3 Non-strategic Parish Housing Requirements
Stagecoach Supports
The approach is consistent with the plan’s spatial strategy. It generally avoids a dispersal of development to locations likely to be highly car dependent. There is a clear focus on meeting housing needs in the far north-east of the District at the largest and most sustainable settlements, such as Loxwood, Kirdford and Wisborough Green. However, it must be pointed out that public transport availability in this area, provided by the County Council through services it procures, is minimal. These settlements in practice require each adult and child of secondary school age to have access to motorised transport to fully participate in society. This might justify significant measures to secure a boost in the frequency of bus services between Guildford and Billingshurst, passing through these settlements.

Otherwise, existing commitments in the plan area already make provision to meet for local needs. To the degree that there is an unmet local requirement for affordable housing of a small scale – for example to support the rural economy – this could be met through neighbourhood plans or through Rural Exception Sites.


6. Place-making, Health and Wellbeing

6.1. Policy P1 Design principles
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective

NPPF requires that proposals should consider transport issues from the earliest possible stage. Designing to properly facilitate safe and efficient access, focusing first on sustainable modes, should be at the heart of development design. Too often it is still an afterthought, notwithstanding this.
Policy P1 must include an additional statement to be compliant and effective with NPPF paragraph 104-105 and 112 a):
“Development will be designed to make access and movement using walking, cycling and public transport the natural first choice, and demonstrate through the Design and Access Statement how such modes are afforded the most direct, safe, reliable and efficient routes within to and from the proposals, especially when compared with car use.”

6.2. Policy P4 Layout and Access
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective

A number of proposals in the plan involve large-scale development. It is essential that where appropriate buses can access and circulate efficiently through development at a suitably early stage. There is no acknowledgement of this anywhere in the policy, contrary to NPPF paragraph 112.

Large-scale development which buses cannot access in an efficient or timely manner, or at all, strongly contributes to high levels of car-dependency. Evidence for this is referred to among other places, in DfT Circular 01/2022. To be compliant with NPPF and properly pursue its strategic Objectives, Policy P4 needs to be modified to address this point:
“1. Provide safe, direct and attractive conditions for inclusive access, egress and active travel between all locations and providing as good direct high quality links to integrated public transport, and where appropriate efficient access and circulation to bus services, unimpeded by excessive parking, at a suitably early point in the development phasing;


7. Transport and Accessibility
Stagecoach Objects because the Plan:
• does not comply with the duty to cooperate
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

The issues related to transport are fundamental to the soundness of the Plan. In particular, the constraints presented by the capacity on the A27 around Chichester and its key junctions, are the paramount reasons why the Council does not consider it can meet its objectively-assessed development needs in full. Thus, the transport issues and potential solutions available and what these mean for the ability of development needs to be accommodated, are matters that go to the heart of the soundness of the Plan.

Paragraph 8.3 sets out the approach taken to date succinctly:
“Increasing the capacity of the road network is key to supporting growth in the Local Plan. However, there is also a need to reduce demand for road transport to achieve net zero in greenhouse gas emissions by 2050 as highlighted in the council’s Climate Emergency Action Plan and Strategic Objective 1. In aiming to achieve the ambitions of the action plan, all development is expected to demonstrate how it will support four key objectives to create an integrated transport network which will alleviate pressure on the road network, improve highway safety, encourage sustainable travel behaviours and help reduce transport related impact on air quality, by:


1. Avoiding or reducing the need to travel by car;
2. Enabling access to sustainable means of travel, including public transport, walking and cycling;
3. Managing travel demand; and
4. Mitigating the impacts of travel by car.”

However, this approach is unambitious and “lightweight” as it assumes, as does the existing Chichester Transport Strategy on which the current adopted plan relies, that the focus of investment should be, wholly, in highways capacity improvement.

Sustainable modes explicitly are expected to play a greater role to “alleviate pressure” on the local road network, as part of this strategy. To emphasise: to avoid exacerbating congestion, the strategy will have to both remove a significant proportion of existing demands from the network on multiple key approaches to Chichester; and then ensure that travel demands from committed and further new development allocated in the plan does not simply replace these journeys, or, worse, create even greater demands.

This will demand very significant behaviour change. Only by making sustainable modes substantially more attractive, both absolutely, and relative to the same journey made by car, can this be expected to occur. However, the explanatory memorandum as well as the wider policy suite and IDP, well expresses a fundamental unwillingness to taking specific, defined measures to achieve this reduction in car use and material promotion of sustainable modes. It makes plain that sustainable modes, including bus services, will offer a lesser role to which “access will be provided”.

Such a vague and weakly defined mechanism will have no effect, at all, on current behaviour and car dependency if the relevance of those choices as a credible alternative to car use, is not substantially boosted. This includes a 5% reduction in trip demand assumed by the Traffic Model at the heart of the Chichester Transport Study 2023.

For this reason. the transport strategy behind the current adopted plan is demonstrably ineffective, as the updated model makes plain. It has not yet been delivered and is yet unclear when or (in the absence of committed funding) even if it can be. It is ineffective to “roll forward” this strategy to support a higher level of planned growth.

We note that a scheme for addressing congestion on the A27 at Chichester has been included in Roads Investment Period 3 (2025-2030) – well within the horizon of this Plan. However, recent history provides compelling evidence that off-line improvement to the north is not politically supported and arguably even technically or economically deliverable. It is not funded, nor at this stage can it be hypothesised if an economically deliverable scheme is achievable sufficient to warrant the necessary investment.

An on-line improvement of the A27, including junction improvements, is likely to favour longer distance east-west though movements, which are of greater significance to the national economy, at the expense of local movements crossing the SRN- a conundrum that largely sums up the dilemma that is faced by NHC and the County as Highways and Transport Authority. It is one that is played out in many places, but rarely is the tension so stark as at Chichester.

Every local route crossing the A27 at grade around Chichester accommodates a regular bus service - or shortly will do (Oving Road area is expected to follow in 2023, though bus services are likely to not use the modified crossroads but to use the left-in-left-out facilities provided as part of the Shopwhyke Lakes development). The impact of these issues on the entire bus operation are serious and increasingly severe.

By the same token, boosting the relevance and reliability of each of these services substantially consolidating as much demand as possible onto a much smaller number of vehicles, is clearly a strategy that ought to support the effective capacity of each of these junctions being greatly augmented, at the same time as reducing equally substantially, the energy- and carbon intensity of mobility in the plan area. Addressing the A27 should not be considered some kind of “zero-sum” game.

Furthermore, the approach of National Highways in its dealings with development and the planning system now reflect a substantial change in Government Policy set out in DfT Circular 01/2022, which we separately cover in these representations, that entirely aligns with an approach that seeks to appropriately invest in more active and rational management of scarce highways capacity, on both the SRN and local roads.

For environmental, economic and social reasons – including public health, the issues presented by the A27 and its interface with local roads around Chichester stands out, nationally, as an example of where the approach taken to accommodating and mitigating development impacts needs to make a clear break with previous “predict and provide” approaches to meet forecast unconstrained car use as LTN 02/2022 makes clear as a principle. Policy in the West Sussex LTP to 2036 itself makes plain that “shared mobility” – including bus services – must play a much greater role in this area.

The existing Chichester Area Transport Strategy is focused on justifying capital contributions from committed development to fund highways capacity improvement – with nothing included to make bus services more attractive, or importantly more reliable. Indeed this “cars first” approach is so costly, that there is already accepted by WSCC to be insufficient land value remaining to be captured to put into substantial improvements for public transport. That much is very evident, and transparent, from paragraph 8.12 and 8.14, where south of Chichester “This (one) package of works (of several improvements needed) would be between £57.23 and £82.79 million to deliver in full and would not be capable of being funded by development contributions alone.” This assumes the scheme is otherwise deliverable, which on the evidence in the public domain for some time, has be considered challengeable.

The draft Local Plan and a modestly updated infrastructure package that flows from the 2023 Chichester Transport Study, pursues exactly the same approach.

This strategy is also even more ineffective having regard to the roll forward of the Plan to 2039. It cannot deliver the key Strategic Objectives of the Plan; and in particular this is explicitly recognised by the Council in the failure of the draft Plan to accommodate the OAN in full.

It is also obsolete, as it does not align, from first principles, with national policy (including the National Decarbonisation Strategy for Transport) and DfT Circular 01/22; nor the Council’s own declared Climate Emergency.

As a result, draft Policies T1 and T2 are both unsound, as we will separately explain.

Owing to the lack of evidence about the implications of this for adjoining authorities – especially Adur District – in the absence of the review of the Local Strategic Statement – this has implications for fulfilling the Statutory Duty to Co-operate.

The absence of any meaningfully comprehensive refresh of the transport evidence base means that there are no meaningful schemes of any kind, defined in the plan or its IDP, to indicate either what level of growth can be accommodated, by delivering a change in travel behaviour. This would be aimed to secure a sufficient effective increase in junction throughput (measured in terms of person trips as opposed to passenger car unit movements (PCUs). Such evidence would propose measure to achieve that outcome and assess the efficacy and costs of such improvements, across all modes.

Paragraphs 8.10-8.13 inclusive indicate that the Council “has moved away from ‘predict and provide’” and invites the reader to conclude this has translated into a programme of interventions that can be funded to deliver specific, credibly predictable outcomes. Such a programme should be clear in paragraph 8.11. and the IDP. There is no such clarity and this conclusion would be false.

It would also be evident in the language of the Chichester Transport Study 2023 and its refreshed proposals. Only the most token of lip service is paid to the matter. It is a plainly car-focused, predict and provide methodology to support a “predict and provide” strategy. In fact, it is a brazenly car-focused approach, to the exclusion of all else.

The statements in the Plan regarding any other approach, read properly, offer nothing more than a vague commitment to look post-adoption, and implementation, at unspecified measures, based on problems that may arise in future that will be decided by a committee: the Traffic and Infrastructure Management Group (TIMG). This does not yet exist and is obviously an attempt to posit a mechanism that retroactively will cover for the lack of serious multi-party engagement to address the existing and future issues. Such a group should, in our view, also include the public transport operators, not least if the requirements of NPPF Para 106c) are to be satisfied, and the strategy and measures to be adopted are material to supporting the Local Plan, as of course the purpose of the TIMG has as its core raison d’etre.

The approach proposed by the draft plan is plainly ineffective and unsound in justifying the draft Plan.

It is more widely unacceptable to Stagecoach. The issues are severe today and well-known, already serving to jeopardise the delivery of buses relied on by existing residents, much less attract new ones.

We also consider that HM Planning Inspectorate are likely to be quite resistant to accepting this aspect of the plan’s transport strategy, nor will it be appropriate for the Council, West Sussex County Council, or National Highways, to define such measures after the submission of the Plan during the Examination process. The Examination in Public of a local plan has no purpose to improve plans, or remedy deficiencies clearly evident prior to submission.

The examination of the West of England Joint Strategic Plan in 2019, and the Uttlesford Local Plan in 2021, among several others, demonstrates especially clearly that the Planning System and the Examination process is not amenable to post-hoc retrofitting of transport evidence and strategies to support a development strategy.

7.1. Transport Evidence Base
Stagecoach Objects because the Plan:
• does not comply with the duty to cooperate
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Most of Stagecoach’s serious concerns about the soundness of the plan arise from the fact that it has been prepared in advance of any up-to-date transport evidence and suitably robust transport mitigation strategy being advanced to support it. In essence, the Council has rolled forward the existing plan by 9 years, adding some additional sources of hosing supply, while still relying implicitly on a transport evidence base that was prepared 10 years ago.

This led to the formulation at that time of what can only be described as an attempt to develop an effective car-based mitigation strategy, creating capacity for general traffic added to accommodate unconstrained additional demands on an already over-taxed highways network – the Chichester Area Transport Strategy. Despite language in support of sustainable modes, no deliverable measures were identified to support either the extension of the bus network to serve allocated sites, and much less to create a vital improvement to the quality and reliability of public transport services. This approach reflected the approach set out in DfT Ministerial Circular 02/2013 “Development and the Strategic Highways Network”, applicable since the A27, which is the focus of the most severe difficulties, forms part of the national Strategic Roads Network.

This approach has proven ineffective even before substantial elements of housing land supply in the current plan come forward – in particular West of Chichester and West of Tangmere.

In addition, Circular 02/2013 has now been replaced by a new Ministerial Statement of 23/12/2022, DfT Circular 01/2022.

On both counts the transport evidence base and strategy needs to be properly revisited and established to provide effective mitigation for the plan, including current commitments that are being rolled forward.

The language of the current Ministerial Circular 01/2022 offers a highly condensed synoptic view of the proper approach to addressing transport matters in the planning system notwithstanding that it is directly concerned with the Strategic Roads Network. Videlicet:

“31. The NPPF expects local plans and spatial development strategies to be underpinned by a clear and transparent evidence base which informs the authority’s preferred approach to land use and strategic transport options, and the formulation of policies and allocations that will be subject to public consultation. The company will expect this process to explore all options to reduce a reliance on the SRN for local journeys including a reduction in the need to travel and integrating land use considerations with the need to maximise opportunities for walking, wheeling, cycling, public transport and shared travel.

32. The Transport Decarbonisation Plan indicates that carbon emissions from car and van use is the largest component of the United Kingdom’s total transport emissions. While action is being taken to decarbonise transport such that all new cars and vans will be fully zero emission at the tailpipe from 2035, the proposed location of growth in current plan periods and whether new developments would be genuinely sustainable remain important factors in demonstrating that a local authority area is on a pathway to net zero by 2050 and therefore compliant with the requirements of the Climate Change Act 2008.

33. Alongside this, the local authority should identify the key issues within their study area regarding transport provision and accessibility, setting out how the plan or strategy can address these key issues in consultation with (National Highways, and other transport stakeholders identified in NPPF paragraph 106b). It is the responsibility of the local authority undertaking its strategic policy-making function to present a robust transport evidence base in support of its plan or strategy. The company can review measures that would help to avoid or significantly reduce the need for additional infrastructure on the SRN where development can be delivered through identified improvements to the local transport network, to include infrastructure that promotes walking, wheeling, cycling, public transport and shared travel. A robust evidence base will be required, including demand forecasting models, which inform analysis of alternatives by accounting for the effects of possible mitigation scenarios that shift demand into less carbon-intensive forms of travel.” (our emphasis)

Within the text quoted above, references to National Highways and “the Company” can quite legitimately be extended, given the statements in NPPF paragraph 16, 25, 26 and 106b, to include all the relevant transport infrastructure and service providers in the plan area. Circular 01/2022 also has the weight of secondary legislation as a Written Ministerial Statement and thus should be considered to be highly material.
To date there has been little attempt to explore, to the degree necessary, strategies that conform to Circular 01/2022. It is thus not possible to conclude, as the Council has done, that the issues on the A27 that present a constraint to development, are insuperable.

In line with comments made elsewhere in the response to this pre-submission draft, the Plan thus requires substantial further work to be undertaken with key stakeholders to establish a suitably effective and demonstrably deliverable transport mitigation strategy, to sustainably meet the District’s identifiable development needs and where apparent and appropriate, also ensure that wider cross boundary strategic issues are appropriately addressed, in conformity inter alia, with the Duty to Cooperate, NPPF paragraph 16 and 104-111 inclusive, and DfT Circular 01/2022 and to ensure the Plan’s own Strategic Objectives can be met.

7.2. Policy T1 Transport infrastructure
Stagecoach Objects because the Plan:
• does not comply with the duty to cooperate
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

As described in comments elsewhere, Stagecoach does not see that a suitable proportionate and up-to-date basis exists to properly and appropriately address the transport issues in the plan area.

The 2023 Transport Study does not perform this role adequately but, contrary to the explanatory memorandum, is a scheme intended only to facilitate car-borne movements through some of the key junctions. There is no evidence that an holistic integrated and strategic approach to transport mitigations has been prepared. Certainly Stagecoach has not been involved in any of the discussion about appropriate transport measures in support of the plan, including the Transport Study 2023, contrary to the expectations set out in NPPF at paragraph 16 and 106.

Notwithstanding out fundamental concerns about the transport evidence case and mitigations strategy, Policy T1 reflects a weak and ineffective approach, that seeks to try and define a strategy post-adoption.

Contrary even to the explanatory memorandum for the policy, which seeks to maximise the contribution of sustainable modes, the policy is phased in such a way that it gives basis for previous “predict and provide” solutions to facilitate and support current levels of car dependency – already shown to be undeliverable and unaffordable – will nevertheless be the first rather than the last resort. There is no commitment to seek to maximise the contribution made by sustainable modes to meeting mobility needs. Nor is there any recognition that current chronic congestion and lack of network resilience jeopardises the ongoing attractiveness and long- term sustainability of the current public transport offer.

To be effective and create alignment with national policy, and also provide for an up-to-date transport evidence base and strategy to be adduced, Policy T1 should be modified to read:

“Integrated transport measures will be developed to mitigate the impact of planned development on the highways network, improve highway safety and air quality, promote more sustainable travel patterns and through providing in the first instance, new and improved infrastructure and services that will be credible effective in maximising the encourage increased use of sustainable modes of travel, such as public transport, cycling and walking.

To achieve this, the council will work with National Highways, West Sussex County Council, other transport and service providers (including through the Traffic and Infrastructure Management Group)
and developers to provide a better integrated transport network and to improve accessibility to key services and facilities…

All parties, including applicants, are expected to support these objectives by:

1. Ensuring that new development is well located and designed to avoid or minimise the
need for travel, encourages maximises the use of sustainable modes of travel as an a credible alternative
to the private car and directly provides or contributes towards new or improved transport infrastructure;

2. Working with relevant transport infrastructure and service providers to improve accessibility to key services and facilities with primary emphasis on sustainable modes, and to ensure that new facilities are easily accessible by sustainable modes of travel;

3. Targeting investment to provide local travel options as an that represent a clearly credible alternative to the car use, focusing on the delivery of improved integrated bus and train services, and improved pedestrian and cycling networks, including the public rights of way network, based on the routes and projects identified in the Local Transport Plan, West Sussex Bus Service Improvement Plan, Local Cycling and Walking Infrastructure Plan (LCWIP) and the Infrastructure Delivery Plan;

4. Planning to achieve the timely delivery of transport infrastructure on and approaching the A27 and elsewhere on the network, needed to support new housing, employment and other development identified in this plan;

5. Phasing the delivery of new development to align with and where possible facilitate the provision of new and improved transport infrastructure and services and the outcomes of monitoring travel demand on the network, including that arising from areas immediately adjoining the plan area. It may also be Where necessary to achieve this alignment proactively phase development will be phased to take into account the monitoring and effectiveness of travel plans demands on the network and to ensure that measures are implemented to support the highest possible level of encourage sustainable travel behaviour.;

6. Using demand management measures, such as travel plans, to manage robust methodologies to assess travel demand and minimise the need for new or improved transport infrastructure as part of the monitor and manage process.

7. Delivering a coordinated package of infrastructure improvements at and approaching to junctions on the A27 Chichester Bypass along with other small-scale junction improvements interventions within the
city and elsewhere, as identified through the monitor and manage process. These will increase road capacity, reduce traffic congestion, improve safety and air quality, and improve access to Chichester city from surrounding areas, first by maximising the contribution of sustainable modes to meeting mobility demands, then, and only as evidenced by robust modelling and option testing, providing increased highway capacity for general traffic.

…”

7.3. Policy T2 Transport and Development
Stagecoach Objects because the Plan:
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Section 1 b) of T2 will be ineffective as, absent measures to ensure buses can run reliably and efficiently, improved bus services will not be possible, in support of the plan’s own stated broad approach to transport mitigation, as well as wider local and national policy.

The draft policy does not require improvements to the quality of services such that sustainable choices will be materially more attractive than car use for many local journeys. Without this the Plan’s Strategic Objectives cannot be fulfilled and the objectives of the Plan and this policy, read in its own terms, will not be realised, where reduction in private car use is concerned. It is thus ineffective.

Absent measures to make bus services more reliable and more efficient, by insulating them from chronic congestion as far as possible, still further operating resource and therefore costs, will be needed to just to reliably run existing service frequencies, and capacity, as vehicle productivity continues to be more and more adversely affected by chronic delay. This will be further aggravated by increasing incidence of severe unpredictable service breakdown arising from incidents of diverse kinds on the network, especially on or around the A27, including that arising from more regular severe weather events. Longer journey times can only be expected to lead to relative disadvantage of bus services compared to personal car use, entirely contrary to the objectives of national and local policy, including Policy T1. It can also expect to lead to a dampening effect not on car use, but on bus patronage, threatening the ongoing viability of bus services across the plan area.

Section 1 b) of T2 should be modified to read:
“b) Maximise opportunities for the use of sustainable travel modes through provision of direct and efficient access both to either the existing networks or and through providing such new infrastructure or public transport services, as can be credibly expected to reduce reliance on the private car and work towards achieving net zero in greenhouse gas
emissions by 2050;”

Section 1 d) of T2 will be ineffective as the location of development is fixed by this plan. We commend the fact that all the strategic allocations are or will be served by regular bus services.

However, the use of public transport services, where available, depends on the relevance and reliability of these services. Furthermore, provision of services without them generating sufficient patronage to support their long-term operation also threatens the sustainability of the plan and its supporting transport strategy. This is especially true of new services such as those intended to serve West of Chichester and Tangmere and East of Chichester Strategic Allocations.

This can only be assured by the plan being supported by specific measures to ensure buses can operate efficiently and reliably on the existing and projected services intended to serve the developments concerned, and also at the same time secure behavioural change from existing development.

To be sound and effective, the policy T2 1 d.) should be changed to read:
“d) Ensure major development is located to proposals and the supporting mitigation measures enable the use delivery of high-quality, reliable and effective public transport to present the most relevant possible choice to access local services and facilities including employment, leisure and education facilities”;

The Policy T2 makes no provision for buses, where necessary, to enter and make efficient and safe progress through major development sites. The plan is thus out of conformity with NPPF paragraphs 104-106. It makes no provision to ensure that penetration of bus services is achieved at a suitably early point in the development trajectory, undermining the achievement of the goals of the Plan and this specific policy. As a good example, West of Chichester Phase 1, currently under construction, cannot be served by buses as a strategy to effect interim bus penetration was never made.

Policy T2 1 f.) should therefore be amended to read:
f) Ensure that the layout and design of the site development proposals provides effective penetration of the site by sustainable modes, at all points in the development build-out, including public transport where appropriate; and sufficient space for all vehicles to manoeuvre without compromising the safety of pedestrians and cyclists, the efficiency of bus services, or the ability to provide an appropriate level of landscaping across the site”

Policy T2 3.) regarding Travel Planning depends entirely on its effectiveness on the quality and relative attractiveness of sustainable alternatives over car use. In the absence of efficient frequent, reliable and direct public transport services (or similarly, high quality facilities for active travel, Travel Plans will continue to be the entirely ineffective “tick box” exercises that they generally are today, evidenced by much lower levels of public transport use in most new developments than it seen in nearby established neighbourhoods, as demonstrated broadly by Census data in 2011, 2011 and 2021.

For this policy to be effective an up-to date transport evidence base and strategy, underpinning a series of specified interventions to promote the relevance and effectiveness of all sustainable does including public transport in particular, needs to be put in place.


8. Chapter 9 Infrastructure – Policy I1 Infrastructure provision
Stagecoach Objects because the Plan:
• does not comply with the duty to cooperate
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Policy I1 could not expect to be effective without a clear understanding of the effectiveness and costs of a defined series of measures that are laid out in this Plan and its IDP, to mitigate the transport impacts of the development strategy.

Where the Chichester Transport Study is concerned the only meaningful work has focused on the definition and delivery of a range of highways capacity schemes mainly on the A27 around Chichester.

As we have discussed elsewhere the effectiveness of these schemes is insufficient as set out at Tables 8.1 and 8.2 of the Chichester Transport Study 2023. The plan itself admits that the deliverability of this package cannot be afforded by developer contributions alone.

The Chichester Transport Study 2023 does not attempt provide a realistic assessment of costs to deliver these schemes, despite the fact that they have been under evaluation for many years. Nor does it offer any assurance that the schemes are technically achievable. Rather, it states the opposite:

“9.2.3 No investigation has been carried out into specific land ownership details, or into the location details or cost of moving statutory undertakers and utility apparatus within the areas of the scheme. No design assessments were carried out at this stage to ascertain the deliverability of the proposals except where any Health and Safety concerns were raised.”

Thus on the grounds of effectiveness, deliverability and affordability, the measures on which the Plan relies must at the very least be considered to involve an exceptionally high level of risk. Since Policy I1 is founded on these assumptions, it cannot be considered effective.

As we set out elsewhere, the Plan has been advanced on the basis that if any additional sustainable transport measures are required, these mitigations should be retroactively considered and defined after adoption of the Plan. In the light of the doubts that are apparent of both the deliverability, affordability and effectiveness of the Chichester Transport strategy this is especially unsatisfactory even if existing baseline conditions were reasonably acceptable.

However, the Chichester Transport Study 2023, as did its predecessors, makes plain that that existing problems are acute, and can rightly be considered “severe” in the sense of NPPF paragraph 111. Waiting to define deliverable affordable alternatives is an entirely inappropriate approach to the local plan transport mitigation strategy. Such an approach also makes it impossible to consider prior to adoption how far the transport impacts of the plan can be cost-effectively mitigated by alternative means, or whether they are deliverable having regard to technical achievability, land control, development viability, or any combination of the above. Thus, the plan cannot be considered justified, or effective.

Given the mutual dependence of development strategies in Chichester and Arun in particular on these measures this should be seen as crucial of the fulfilment of the Duty to Cooperate.

The remedy for this is ultimately to put in place a suitable transport mitigation strategy following a strategic appraisal of options through review of the LSS. This then must be supplemented by more detailed development specific and localised scheme definition, including, where necessary, bus priority and other measures to support the substantial promotion of the attractiveness of public transport in key bus corridors over private car use. This would then be reflected by costed proposals in the IDP.

Leaving these fundamental weaknesses to one side, even if such a strategy and mitigation package were defined, there is no mention of public transport in the policy even though it is clearly a key part of the policy environment and mitigation strategy for the plan as expressed in the explanatory memorandum for I1, but also at Policies T1 and T2. I1 thus does not effectively support the realisation of the intent of Policies T1 and T2.

Policy I1 iii) should therefore be modified to read:

“(iii) Safeguard the requirements of infrastructure providers, having regard to requirements within and where appropriate across the boundaries of the plan area, including but not limited to:

• Highways including specific measures to accommodate improved active travel and public transport level of service and cycle lanes, and…”

At limb v) the Policy expects developers to meet the “in perpetuity costs of operating and maintaining infrastructure”. This shackles development management decisions to developers assuming what are infinite costs – given that “in perpetuity”, read properly, can only mean “without any limit in time”. This means that it is impossible to meet the statutory tests on developer obligations set out in the Community Infrastructure Levy Regulations 2010 (as amended) at Regulation 122, also repeated in NPPF. This policy cannot be lawfully implemented and it is thus ineffective.

In the absence of an up-to-date transport mitigation strategy that is fit for purpose, at the point the Plan is examined these costs of any additional infrastructure are not known in any case. The strategy and its costs, including its affordability and deliverability, are crucial to assessing if the Plan is sound.

Subject to an appropriate defined transport mitigation strategy being arrived at, to be sound, the Policy I1 v) should be modified as follows:

(v) To consider and meet as appropriate the in-perpetuity delivery costs of infrastructure and, where appropriate, improved services, to the point where its long-term operational sustainability is credibly assured from mainstream sources. Where adoption is not envisaged by local authorities, that must include arrangements for its future ongoing management and maintenance;


9. Strategic and Area Based Policies

9.1. Policy A1 City Centre Development Principles
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Chichester City centre is rightly identified at 10.2 and 10.4 as the commercial and service hub of the District. It is also acknowledged to be the most accessible place in the District by sustainable modes, public transport in particular.

Boosting the vitality of the city centre is something that Stagecoach strongly supports. Irrespective, the enhancement of the commercial and cultural life of the District in the place where these opportunities can be accessed broadly by sustainable modes, is one that has long been at the heart of national planning policy for town centres, reflected in the “town centre first” approach to locating major trip generating uses.

Paragraph 10.5 exposes an unbalanced and unsound preoccupation with aesthetic matters in its approach to the town centre, and far too little to ensuring that the central place function is enhanced through protecting and enhancing the quality of public transport access.

The city is relatively small but at the heart of an extensive hinterland, and thus the role of bus in supporting sustainable access to and enhanced city centre venue is one that needs appropriate recognition and emphasis. It is important to note that a dominant number of key service and facilities such as the General Hospital are relatively close to the city centre. This directly contributes to driving travel demand into the city, causing congestion. Most importantly, it also makes the task of mitigation simpler, given the impact a suite of active and sustainable measures can have within the same close proximity.

Policy A1 does not provide this. As such, achieving the strategic objectives of the plan is seriously threatened, and the plan is thus not effective.

The Plan needs to ensure that the approach to city centre regeneration maintains and enhances public transport access, interchange and inter-modal connectivity. It also needs to ensure that bus service stopping and interchange facilities are able to address increases in future demand, anticipated by the clear intent expressed elsewhere in the Plan that public transport should be meeting a greater proportion of mobility needs, in a growing district. Achieving this demands an ambitious approach to the location, quality and capacity of bus stop and interchange.

We have been in discussions with the District Council about this, alongside West Sussex County Council, for a very considerable period. Stagecoach has always been keen to help facilitate the Council’s aspirations for the city centre, and we continue to hold this intention. However, this cannot be at the expense of a material diminishing of the convenience and fitness-for-purpose of bus stop infrastructure and interchange. Stagecoach has significant concerns that current proposals to remove the bus station and have all bus services operate from the street kerbside, on an inner distributor road with similar of reduced net stop capacity, fall short of promoting attractive, convenient bus access to the central area as a destination.

For the longer term and where the objectives of the draft plan are concerned looking ahead to 2039, they clearly fall short of enhancing the convenience and attractiveness of public transport use. Much less do they make sufficient provision for a material increase in bus frequency, connectivity, and interchange convenience, on which the draft plan explicitly relies. It is vital that the District Council is clear in policy about its objectives for public transport in the city centre. These objectives must also carry sufficient weight when held in tension with other aspirations for the centre and the constraints on achieving them.

For the Plan to be sound, properly effective and compliant with NPPF, the approach to the City centre cannot ignore its role in the provision of sustainable transport service and connectivity.

Policy A1 should therefore be modified to properly reflect this crucial function, on which the vitality of the city centre must increasingly depend if unacceptable impacts on congestion, air quality and amenity are not to arise. This is still more crucial if wider aspirations to secure a more sustainable society and mitigate carbon are to be achieved.

“…This will include provision for development and proposals that:
• Support and strengthen the vitality and viability of the city centre and its role as a shopping/visitor destination, employment centre, public transport hub and a place to live;

• Support and promote facilitate improved access to the city and with increased emphasis on sustainable modes of travel, with particular regard to enhancing the public transport interchange role of the city centre area, in accordance with the transport strategy for the city and…”

9.2. Policy A3 Southern Gateway Development principles Chichester Bus Station, Bus Depot and Basin Road Car Park
Stagecoach Objects because the Plan:
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

There has been aspiration to redevelop the bus station and nearby bus depot from many years. Stagecoach has been engaged with detailed discussion with the District Council on this matter over a very extended period. We confirm that these discussions have reached a relatively mature stage, however at the time of writing are not concluded.

Stagecoach recognises and supports in principle the Council’s wider aspirations for the “Southern Gateway”, and this has governed our approach to the Council to date. We continue to have no “in principle” objection to relocating our administrative, engineering, operational and customer service facilities.

Leaving our proprietary interests entirely to one side, it remains vital that in so doing, the effectiveness, attractiveness and convenience of these facilities is not compromised, as we have outlined in our representations to Policy A1, if wider national and local transport policy, and the local plan strategy itself, are to be effectively achieved.

The depot is crucial infrastructure to support the safe, reliable and legally-compliant operation of Stagecoach bus services over a very extensive area covering the entirety of the District and beyond. Without securing equivalent facilities, that are fit-for-purpose, many of our services would have to cease.

If buses are to provide a greater and more attractive level of service (still more so if they are to be electrified) larger, more capable depot facilities, and city centre bus interchange facilities will be necessary.

Notwithstanding that the bus station and depot sites are leased from the District Council, these leases terminate well beyond the end of the plan period.

Finding suitable sites for a replacement bus depot in Chichester, in common with all similar localities especially in southern England, is extremely challenging. As a sui generis use, bus depots do not automatically benefit from policy support on land allocated for employment uses. Most bus depots benefit from being legacy assets established under very different economic conditions. That is the case here. The value of a depot site for redevelopment net of demolition and remediation costs, rarely approximates to that able to sustain the acquisition of land in a tight wider employment land market, and the construction of suitable new facilities.

Furthermore, the costs of operating bus services are sensitive to the parasitic costs of vehicle and staff hours and mileage associated with “dead running” to a remote depot location from the operational network. Here, the existing depot site is ideal, and any replacement will unavoidable add ongoing operational costs to the operation that cannot be directly recovered.

We confirm that a replacement depot site has been identified and has in principle been agreed, subject to overcoming issues with the disposition of existing and future structures on the site. However, the site is recognised as not capable of accommodating meaningful operational expansion. This is just one of the most important foundational reasons why a positive transformation of bus productivity needs to be achieved, across the plan area and beyond, to support delivery of greater bus mileage and frequencies with the same level of operational resource. At the time of writing, we are not fully convinced that the proposals for the relocation will be sufficiently fit-for-purpose in the event the above is not achieved. Thus, we must raise a concern that the bus depot site might not be available during the plan period. While there is a strong probability it will be, the certainty surrounding the availability of the site, especially within the first 5 years of the plan, needs to be made transparent.

9.3. Policy A4 Southern Gateway - Chichester Bus Station, Bus Depot and Basin Road Car Park
Stagecoach Objects because the Plan:
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Regarding the removal of the bus station, without equivalent replacement, Stagecoach has significant concerns. Pressures and conflicts at the current bus station site have been gradually rising for several years, arising from increasing use and the need for additional scheduled vehicle layover periods to reduce the risks of accumulated late running from traffic congestion. Peak passenger volumes have recovered strongly on several routes, however passenger accumulations resulting from more frequent delays and disruption have added substantial further pressure on limited space.

Under current plans, buses and bus passengers will be displaced to bus stops at new locations outside the city centre, along Avenue de Chartres. This road was always intended to be a relatively high-speed traffic route, outside the historic core of the city. The city centre has evolved in the subsequent years to reinforce already strong natural severance, with the highway lying beyond the city walls and the green space along the Lavant. It is a traffic dominated, unsurveilled and unattractive environment, reflecting the intended function of the road as an efficient movement corridor for high traffic volume, and nothing more. Avenue de Chartres is relatively close to the rail station and pedestrian connectivity can be provided at broadly equivalent distance to the current bus station, but again it is unsurveilled and currently unpleasant, lacking natural legibility or any sense of prominence.

We understand kerbside capacity on Avenue de Chartres will be strained even to accommodate current levels of service, with no expansion possible. There is therefore a strong probability that to accommodate more frequencies and key new routes, such as West of Tangmere, East of Chichester and West of Chichester allocations, additional future bus stops must occupy a different location. This makes interchange between routes and rail services substantially challenging and less attractive.

The emerging arrangements risk marginalising public transport and public transport users substantially. This strongly undermines achievement of the wider plan objectives and delivery of a significantly greater role for public transport. If substantial public transport growth is to be accommodated in a growing city and hinterland, as the draft plan anticipates, then a more ambitious strategic approach must be taken. This should plan for additional and improved facilities to accommodate all services predicted to be required, whilst enhancing the passenger experience to ensure meaningful and attractive modal choice.

There is therefore a need for the plan to evidence how these issues will be appropriately resolved, having regard to a suitably ambitious approach that properly supports clear objectives to boost the relevance of public transport. The current policy is weak, unspecific and indifferent to achieving the strategic objectives of the plan, including a transport strategy in support of the plan, and as such it is ineffective.

Policy A3 should therefore be modified to read:
“…
• Be designed to encourage and facilitate substantial increase in the use of active travel and public transport to, from and through the city centre.
…”

In line with the commentary above Policy A4 should also be modified to read:

3. Enhance the public interchange function of the immediate area, the public realm, particularly connections to the railway station and the city centre via South Street, Southgate and Basin Road for pedestrians, cyclists and public transport users, and to National Cycle Route 2 and Route 88 which run close by. Suitable replacement bus stops and layover facilities should be provided to replace those at the bus station in line with reflecting the objectives of the West Sussex Bus Service Improvement Plan, and to facilitate growth to meet the requirements of the plan’s development strategy. Routes and crossings should reflect pedestrian desire lines, and public art should be incorporated to create a sense of place;

4. Enhance the public realm, in support of this and wider objectives, incorporating public art and other measures to create a strong and attractive sense of place.
…(renumber remaining points)

9.4. Policy A6 Land West of Chichester

Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective

This is an existing Local Plan allocation. The public transport strategy for the site depends on the delivery of the second phase which Stagecoach notes is the subject of several applications now awaiting review and determination by the Council.

The site represents a compact form of development adjoining the city, as the most sustainable settlement, meeting housing needs close to where they arise, and affording very good opportunities for the use of sustainable modes, especially walking and cycling.

It is vital that a bus service is delivered to serve the site at the earliest potential. This was anticipated to be at the start of Phase 2 and will require the early delivery of the entire length of the spine road between the Old Broyle Road and Westgate and making it available for bus services.

It is not clear if the costs of pump-priming the service mentioned in the draft policy are anticipated to be met by the developer. Without such funding, the service will not be deliverable as years of losses will never credibly be covered from future profit. It is likely that the current wording will be interpreted by the developer as meaning that they have no such obligation binding upon them. Not does policy set out any specification for this service, thus its costs and the basis for securing developer contributions does not exist.

As such any wider transport strategy, that seeks to secure a greater role for the use of public transport, and the aspiration for this allocation cannot demonstrably be met. The policy is ineffective.

Policy A6 should be modified to read:
“…
10. Make provision to accommodate and secure delivery of for regular bus services linking running through the site to Chichester city centre operating at least every 30 minutes Monday-Saturday, and new and improved cycle and pedestrian routes linking the site with the city,
…”

9.5. Policy A7 Land at Shopwhyke
Stagecoach Supports
This is an existing Local Plan allocation, largely built-out, that benefits from an existing set of permissions.

The public transport strategy for the site depends on the delivery of effective bus priority at Oving Crossroads. The current recently implemented scheme, undertaken by National Highways, makes no provision for effective bus priority and needs considerable re-evaluation.

The site represents a compact form of development adjoining the city, as the most sustainable settlement, meeting housing needs close to where they arise, and affording very good opportunities for the use of sustainable modes, especially walking and cycling. It lies on a new bus corridor that will shortly be put in place, running to Tangmere via Shopwhyke. The allocation is being significantly consolidated by further development in the immediate vicinity which strongly supports the potential for this new service.

As we explain in our representations for East of Chichester proposed allocation A8, and West of Tangmere Allocation A14, a clear corridor strategy to effect bus priority is needed, that should be delivered in support of that further growth, and that at Tangmere SDL. However this allocation is a near complete commitment and there is no scope through policy regarding this land to effect this outcome.

It is notable that Point 6) of policy A7 makes mention of a bus service. This language reflects the currently adopted Local Plan policy and has underpinned the existing permissions. The failure of any bus service to be delivered demonstrates from first principles that this Policy has been entirely ineffective. It is important that lessons are learned from this in the Local Plan Review.

9.6. Policy A8 Land East of Chichester
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

This proposed allocation lies next to unallocated land that is already consented as a departure from the adopted development plan, with 143 units near completion south of Oving Road (20/02471/FUL). Additional land, also unallocated but similarly consented, has now commenced north of Oving Road (88 units under 21/02197/FUL). This and the allocation site consolidates earlier development at Shopwhyke brought forward under the current Local Plan, and allocated again as draft policy A7.

Development at Shopwhyke was brought forward on the basis of a premise that the developer would provide or somehow arrange a bus service, that was reflected in the policies of the current Local Plan. This was secured by an unenforceable condition. No bus service has been provided, as there was inadequate clarity regarding the basis on which the costs of establishing such a service would be met by the developer, and the expectations of policy on the developer. The site does however lies on a logical new bus corridor between Chichester and West of Tangmere along the Oving Road.

In addition, an expectation that modifications to the Oving Crossroads would effect bus advantage have proven false – the arrangements put buses into a similar or longer queue than if they use the route available to general traffic to and from the A27.

Stagecoach strongly supports the principle of bringing this land forward. However, the soundness of the site depends on deliverability of a regular, reliable and direct bus service along the Oving Road, taking advantage of effective bus priority.

Given the failure of existing policy in the adopted Local Plan covering the proposed A7 allocation to deliver a bus service, it is of great concern that there is no draft policy to adequately address the issue. The policy is out of conformity with NPPF paragraph 104-105 in that sustainable modes do not offer realistic choices, much less an attractive one, and as such also does not secure the objectives of national policy nor of the plan itself.

Currently the proposed allocation is not served at all by public transport. Policy needs to ensure there is a policy basis to secure contributions to deliver such a service, which may well take the form of a proportionate contribution to deliver a new service or enhance provision that is put in place between Chichester along the Shopwhyke Road to west of Tangmere.

To become sound Policy A8 must be modified to read:
“…
12. Provide for improved high quality connectivity by sustainable travel modes and focused in particular on a corridor between Chichester city centre and Tangmere along Shopwhyke Road, including new improved cycle and pedestrian routes, and a frequent bus service including linkages with Chichester taking advantage of effective bus priority measures on Oving Road at the A27;
…”

9.7. Policy A9 Land at Westhampnett/North East Chichester
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

This land is already allocated and consented as part of the existing 2016 Local Plan. All reserved matters are determined.

The site lies on service 55 between Chichester, Westhampnett and Tangmere. This established service benefits from additional demand from the development at Phase 1. Phase 2 which is currently well underway, does not benefit directly from bus services. However it is a compact and logical form of development where walking and cycling to local facilities and employment is a credible option.

The existing allocation rolls forward policies in the 2015 Local Plan. In so doing it is possible to see which have been effective.

Point 9. regarding bus service and routing has not been effective. In particular the potential for a bus only link between the site and Graylingwell has not been established as policy anticipated. Given congestion around the Portfield area acutely affects public transport this, or alternative methods to secure bus priority over private car use, a clear and unequivocal policy steer is required.

The lack of an up-to-date transport evidence base is ultimately at the root of these issues. Arguably the policy and allocation can only be made sound once this refreshed evidence base in place.

However, it is possible that the allocation could be made sound by modification of Policy A9 as follows:
“…
9. Make provision for regular, direct and reliable bus services linking the site with Chichester city centre, and new and improved safe and convenient cycle and pedestrian routes linking the site with Chichester city, the South Downs National Park and other strategic developments to the east of Chichester city including Tangmere. These objectives could include exploring the potential for a bus only route require a deliverable scheme to afford bus priority through Portfield, and potentially linking the development with the Graylingwell area through use of a modal filter;
…”

9.8. Policy A10 Land at Maudlin Farm
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Stagecoach supports the identification of this site, which consolidates significant recent development on an existing public transport route. It is relatively close to the city and very near substantial centres of employment and services that can be reached by active travel modes, helping damp the demand for car use. It is a site which, with appropriate measures to substantially boost the relevance and attractiveness of sustainable choices, could be made sustainable.

The draft policy is not sufficiently clear and robust about the measures to support the damping of car trips that will be required to support development at this location without having an unacceptable impact on traffic conditions, congestion and the reliability of bus services at Portfield and over a wider area. In fact, the only reference that is made is that the development should fund highways capacity improvements. These improvements, as set out in the Chichester Transport Strategy, do not accommodate growth from additional sites over and above those already allocated in the 2015 Local Plan. They do not secure any mode shift away from car use. An update of this strategy has yet to be produced. This is an unsound, inadequately evidenced approach, that will be ineffective.

Policy A10 should accordingly be modified to read:
“…
5. Provide safe and suitable access points for all users, including a main vehicle access from Old Arundel Road and, subject to further assessment, a secondary vehicle access from Dairy Lane. The development should make the requisite contributions for off-site highway improvements to transport infrastructure and services, with an emphasis o maximising the attractiveness of sustainable modes, in conformity with the Policy T1 (Transport Infrastructure) and T2 (Transport and Development), which will include promoting sustainable transport options high quality pedestrian, cycling and public transport routes;
…”

9.9. Policy A11 Bosham – Land at Highgrove Farm
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Stagecoach supports the identification of this site, which consolidates significant recent development on an existing high quality public transport route, including Stagecoach service 700 and the Coastway rail service available at Bosham Station. It is relatively close to the city and very near substantial centres of employment and services that can be reached by public transport and cycling, offering strong potential to materially damp the demand for car use.

There are serious risks that development in the A259 corridor west of Chichester could place further demands on the junctions at Fishbourne and approaching Emsworth, leading to even more chronic and severe delay to travellers and in particular to bus services.

Nevertheless, given the potential to effect bus priority on the approaches to Fishbourne Roundabout, it is a site which, with appropriate measures to substantially boost the relevance and attractiveness of sustainable choices, could be made sustainable.

The draft policy is not sufficiently clear and robust about the measures to support the damping of car trips that will be required to support development at this location without having an unacceptable impact on traffic conditions, congestion and the reliability of bus services on the approaches to the A27 and over the wider corridor to the west. In fact the only reference that is made is that the development should fund highways capacity improvements. These improvements, as set out in the Chichester Transport Strategy, do not accommodate growth from additional sites over and above those already allocated in the 2015 Local Plan. They do not secure any mode shift away from car use. An update of this strategy has yet to be produced. This is an unsound, inadequately evidenced approach, that will be ineffective.

Policy A11 should accordingly be modified to read:
“…
8. Provide safe and suitable access points for all users, including a main vehicle access
from the A259. The development should make the requisite contributions for off-site highway improvements to transport infrastructure and services, with an emphasis o maximising the attractiveness of sustainable modes, in conformity with the Policy T1 (Transport Infrastructure) and T2 (Transport and Development), which will include promoting sustainable transport options high quality pedestrian, cycling and public transport routes, and providing substantial peak journey time advantage for sustainable modes on journeys crossing the A27 at Fishbourne;


9.10. Policy A12 Chidham and Hambrook
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Stagecoach supports the identification of this site, which consolidates significant recent development on an existing high quality public transport route, including Stagecoach service 700 and the Coastway rail service available at Nutbourne Station. Substantial centres of employment and services that can be reached by public transport and cycling, offering strong potential to materially damp the demand for car use.

There are serious risks that development in the A259 corridor west of Chichester could place further demands on the junctions at Fishbourne and approaching Emsworth, leading to even more chronic and severe delay to travellers and in particular to bus services.

Nevertheless, given the potential to effect bus priority on the approaches to Fishbourne Roundabout, it is a site which, with appropriate measures to substantially boost the relevance and attractiveness of sustainable choices, could be made sustainable.

The draft policy is not sufficiently clear and robust about the measures to support the damping of car trips that will be required to support development at this location without having an unacceptable impact on traffic conditions, congestion and the reliability of bus services on the approaches to the A27 and over the wider corridor to the west. In fact the only reference that is made is that the development should fund highways capacity improvements. These improvements, as set out in the Chichester Transport Strategy, do not accommodate growth from additional sites over and above those already allocated in the 2015 Local Plan. They do not secure any mode shift away from car use. An update of this strategy has yet to be produced. This is an unsound, inadequately evidenced approach, that will be ineffective.

Policy A12 should accordingly be modified to read:
“…
7. Development should make the requisite contributions for off-site highway improvements to transport infrastructure and services, with an emphasis on maximising the attractiveness of sustainable modes, in conformity with the Policy T1 (Transport Infrastructure) and T2 (Transport and Development), which will include promoting sustainable transport options high quality pedestrian, cycling and public transport routes, and providing substantial peak journey time advantage for sustainable modes on journeys along the A259, crossing the A27 at Fishbourne and where necessary on the approaches to Emsworth;

8. Facilitate improved sustainable travel modes, and new improved cycle and pedestrian
routes, including linkages with Chichester city and settlement along the East/West
Corridor;


9.11. Policy A13 Southbourne Broad Location for Development
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Stagecoach agrees unequivocally that Southbourne is a location that could accommodate growth on a strategic scale. It has a substantial range of service available within the settlement, including secondary education. It is well connected by bus and rail service to key destinations, including Chichester, lying to the east and west.

This is one of the few locations identified for growth that represents substantial additional development in a new location to the strategy in the existing Local Plan adopted in 2015. Thus, the transport impacts of development on the substantial scale envisaged at Southbourne are not covered or accommodated by the Chichester Area Transport Strategy that lies behind the existing plan. This demands, from first principles, that substantial further transport mitigation measures are required.

We recognise and endorse fully that the intent of the draft plan for Southbourne as a Broad Location for Development on a strategic scale, includes “Maximising the potential for sustainable travel links through improved public transport, including consideration of opportunities to reduce community severance caused by the railway line as well as the inclusion of cycling and pedestrian routes.” (our emphasis).

The existing railway station at Southbourne is served regularly, however, it is not within the power of this plan to improve rail services. It is, however, well within the scope of action of the Local Planning and Highways Authority to work with bus operators to achieve a step change in the journey time, reliability, frequency and connectivity of bus services, and in particular the major corridor operated as service 700 by Stagecoach along the A259 between Havant and Chichester through Southbourne.

Notwithstanding the clear potential for sustainable connectivity in the western A259 corridor, there are very serious risks that development in the A259 corridor west of Chichester will place further significant car-borne demands on the junctions at Fishbourne and approaching Emsworth, leading to even more chronic and severe delay to travellers and in particular bus services, having the opposite effect to that intended: longer, less reliable and less frequent bus services, leading to a spiral of slowly declining use.

These risks, while very serious, look credibly likely to be entirely mitigated subject to carefully conceived and robust specified actions on the local highway network. It is perplexing to us that this potential still has not been identified, as part of a comprehensive “first principles” review of the transport evidence base. In particular given the former trunk status of the A259, the there is evident potential to effect bus priority on the A259, including on the approaches to Fishbourne Roundabout.

With appropriate measures, including but not limited to this, to substantially boost the relevance and attractiveness of sustainable travel choices, strategic development at Southbourne could well be made highly sustainable.

In the absence of a refreshed transport strategy and transport evidence base, the draft policy is not sufficiently clear and robust about the measures to support the damping of car trips that will be required to support development at this location without having an unacceptable impact on traffic conditions, congestion and the reliability of bus services on the approaches to the A27 and over the wider corridor to the west. In fact, the only reference that is made in Policy is that the development should fund highways capacity improvements. These improvements, as set out in the Chichester Transport Strategy, do not accommodate growth from additional sites over and above those already allocated in the 2015 Local Plan . They do not secure any mode shift away from car use. An update of this strategy has yet to be produced. This is an unsound, inadequately evidenced approach, that will be ineffective.

Policy A12 should accordingly be modified to read:

“…Development should be comprehensively masterplanned to achieve a high-quality design and layout that integrates well with the surrounding built and natural environments to enable a high degree of connectivity with them, particularly for pedestrians and cyclists, and provides good the highest possible quality of access to facilities and sustainable forms of improved public transport services.


4. Provide a suitable means of access to the site(s), and securing secure necessary off-site transport infrastructure and service improvements (including highways in particular to the A259 corridor between Emsworth and Chichester) in conformity with the Policy T1 (Transport Infrastructure) and T2 (Transport and Development) to promote sustainable transport options prioritising delivery of high quality pedestrian, cycling and public transport routes, and providing substantial peak journey time advantage for sustainable modes;
…”

9.12. Policy A14 Land West of Tangmere
Stagecoach Objects because the Plan:
• is unsound as it does not conform to the National Planning Policy Framework
• is not effective
• is unsound because it is not based on relevant proportionate and up to date evidence

Stagecoach strongly supports the principle of intensifying the level of development at the Strategic Development Location already identified and allocated West of Tangmere in the existing Local Plan. This serves to consolidate development at a location where effective and attractive public transport choices could be provided. It also conforms closely with the principle expressed in NPPF that the best possible use should be made of land on sites that are judged to be sustainable, or potentially sustainable locations for development.

It must be stressed that the current policy suite for the SDL has to date not brought forward development in this location. We recognise that a Master Plan has been adopted by the Council, and that a planning application (20/02893/OUT) for the full larger quantum of 1300 dwellings proposed in the draft plan has received a resolution to grant by the Council.

However, we are not aware that a sustainable transport strategy has been finalised.

Land West of Tangmere is not served by any existing regular bus services. Rather, an entirely new bus service corridor is anticipated to operate in the near term from Chichester through Tangmere and beyond towards Barnham. This would serve proposed allocations A7, A8 and West of Tangmere (A14) included in the draft Plan.

This is reflected in the language of the explanatory memorandum to Policy A14 at paragraph 10.65:
“Opportunities, in partnership with relevant authorities, to provide improved sustainable public transport routes linking the village with Chichester city, to improve cycle routes to the city, and better transport links to Barnham rail station and the ‘Five Villages’ area in Arun District; and..”

Initiating this service will be costly and will in large measure be funded not by developer contributions, but by DfT monies awarded through the West Sussex Bus Service Improvement Plan. It is crucial this service is both sustainable in the longer term without revenue support, and that the success of the service can be built on by scalable frequency improvements as strategic development comes forward in both Chichester District, and proposed allocations A7 A8 and A14, and in Arun District, in particular at Barnham, Eastergate and Westergate (BEW).

This demands measures to effect safe, direct and swift operation of the service especially within the city centre, where it approaches and crosses the A27 at Oving crossroads and on the eastern fringes of the District east and west of Tangmere. Without these measures, bus journey time and reliability will be severely compromised and the and impact of this service to damped car trip demands will be very substantially compromised. No such measures are proposed in the draft plan or its evidence base.

Changes to Oving Crossroads have recently taken place which, amongst other intentions, ostensibly provide bus advantage between Chichester and Shopwhyke. The junction in its current form does not offer material gain in bus journey time, as movements involve a less-direct route towards the city over an increased operating distance, much of which involves passage through heavily congested sections of the A27 and Westhampnett Road. A refreshed transport strategy supporting plan-led growth must revisit this area to secure an effective solution which offers bus customers the fastest and most reliable trip-time to and from the city.

In addition, the extension of public transport connectivity towards BEW and Barnham, including key links to secondary education and a logical railhead for journeys beyond towards Brighton and London as provided at Barnham Station, needs to facilitate bus priority between Tangmere and Nyton – whether using the A27, or preferably avoiding it altogether. There are significant safety concerns associated with the at-grade uncontrolled right-hand A27 exit onto the B2233 Nyton Road at Crockerhill Turn. This movement is also prone to extreme delay owing to the conflict with approaching westbound traffic on the A27, travelling at speed, which has priority. Our concerns with this junction in its current form can be expected to worsen with the increased traffic volumes predicted from new residential developments to the west of the city.

A solution providing a suitable short length of highway available only to sustainable modes, between Tangmere and Easthampnett, could provide a very effective solution to this. This would be deliverable within the scope of the separate proposed allocation at A19 Chichester Business Park, Tangmere. We comment on this separately.

Howsoever effected, a reliable direct and delay-free bus corridor between Barnham, BEW, Tangmere and Chichester could expect to secure very substantial elevation of the relative attractiveness of public transport over car use on the entire corridor and serve to effectively damp growth-related demands on this section of the A27. West of Tangmere, in the longer term, there is evident scope for the route corridor to operate as two branches – one via Shopwhyke and one via Westhampnett, effectively serving all the strategic developments proposed in the plan and transforming wider public transport connectivity to key employment destinations and services within and east of Chichester.

However, in common with all the other proposed allocations, the plan proposes no specific measures to provide, much less improve public transport or other sustainable modes to the site. This leaves the draft plan out of conformity with NPPF, especially paragraphs 104-106. The plan is inadequately evidenced and to the degree that public transport measures are identified and emergent, their successful implementation in the near and longer term will be jeopardised without clear measures to provide a safe as well as efficient bus route towards BEW and the Five Village area within Arun. The Duty to Cooperate is not effectively met and effective cross boundary collaboration on these strategic issues through the review of LSS is not demonstrated, despite the current version which identifies the issues.

To be made sound the LSS Review and a subsequent urgent review of the transport evidence base and strategy needs to take place. The strategic issues are especially critical east of Chichester, in our view.

Notwithstanding this foundational deficiency, to be made sound, Policy A14 should be modified to read:
“…
8. Subject to detailed transport assessment, provide primary road access to the site from the slip-road roundabout at the A27/A285 junction to the west of Tangmere providing a spine road link with secondary access from Tangmere Road. Development will be required to provide or fund mitigation for potential off-site traffic impacts through a package of measures in conformity with Policy T1 (Transport Infrastructure) and T2 (Transport and Development) and DfT Circular 01/2022 that maximise the relevance and use of sustainable travel modes, in particular bus services;

9. Make provision for improved sustainable travel modes between Tangmere and Chichester city, in partnership with relevant authorities, including improved direct, seamless safe and reliable and additional bus and cycle routes linking Tangmere with Chichester city, Shopwhyke and Westhampnett. In conjunction with measures in support of Allocation A19, Opportunities should also be explored contributions shall also be sought for providing improving high quality cycling and bus service transport links with the 'Five Villages' area and Barnham rail station in Arun District; and…”


10. Concluding comments

Stagecoach recognises its role as a key stakeholder in the plan, as well as a local employer and corporate citizen. We recognise the primacy of the plan-led system as the mechanism intended to resolve complex challenges, including the proper alignment of transport and spatial planning, which as the National Decarbonisation Strategy for Transport among other policies makes clear, has never been more vital.

In making our representations, we emphasise that we are entirely supportive of the Local Planning Authority and the relevant Highways and Transport Authorities, in their efforts to properly manage the amount and pattern of development to secure vital policy objectives. We recognise that balancing delivery of assessed development needs with a wide variety of other constraints is a very difficult task.

The transport issues faced by the plan are recognised in the draft plan as being serious and long-standing. We believe that there are ways to arrive at a suitable transport mitigation strategy that has regard to wider strategic issues and resolves existing problems in a much more effective way than those pursued to date.

We support the spatial strategy of the plan as it evidently provides the basis to secure the necessary step change in the quality and use of sustainable transport modes, as it explicitly seeks to do. However thus far, there has been insufficient work done to define the measures that will credibly secure these outcomes.

Stagecoach therefore urges the authorities to draw us into the necessary effective ongoing collaborations that is expected by NPPF paragraph 16 and 106; and DfT Circular 01/022, to do this work, prior to, rather than after the submission of the draft plan. We look forward to being approached to initiate this dialogue at the earliest opportunity.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5555

Received: 17/03/2023

Respondent: Millwood Designer Homes

Agent: Savills

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

See attachment for full comments. Proposes increase of Wisborough Green's number to 125 and allocation of HELAA Site at Land East of St Peter's Church for up to 80 dwellings. Policy should support speculative applications if Neighbourhood Plan does not propose development.

Change suggested by respondent:

CDC should amend Policy H3 to increase Wisborough Green’s housing requirement to ‘at least’ 125 additional homes. Present Policy H3 is ineffective and unjustified.
CDC should amend Policy H3 to increase allocation of new dwellings in Wisborough Green to provide suitable housing buffer and compensate for miscalculation of future housing delivery in emerging WGNP.
CDC should allocate Land East of St Peter’s Church (HWG0011) for up to 80 dwellings to ensure that sufficient housing is delivered within earlier part of Plan period.
CDC should amend Policy H3 to remove any ambiguity concerning meaning of ‘demonstrable progress’ and allocate development sites in Local Plan to ensure their timely delivery.
CDC should amend Policy H3 to include support of speculative applications if a Neighbourhood Plan is not proposing suitable quantities of development.

Full text:

See attachment.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5562

Received: 17/03/2023

Respondent: Tim Swann

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

CDC have not consulted on revised housing numbers in North of the district-it quote the restrictions of the A27 which prevents the southern development however the A281 is a bigger constraint which will also have Dunsfold adding pressure.

Allocation of 220 houses plus a further 91 houses on already allocated sites is not sustainable in rural Loxwood-it a huge Percentage increase and will destroy the village.

Change suggested by respondent:

Policy A15 should be removed and Policies H2 and H3 amended to reflect a realistic allocation of 125 houses which is still generous compared to other local area with better services.

Full text:

I feel very strongly the local plan is ill thought through and a unbalanced distribution of houses that doesn't reflect the nature of rural villages. Loxwood is a rural village with no public transport links that are usable for the working population, no work opportunities, a serious lack of sewage capacity, no local grocery shop and yet the council deem it suitable for over 312 houses which will give a 50% increase in dwellings and a potential for significantly more as a 'strategic' location-it is completely bonkers. We are not a town!

It is also very disrespectful of the council to ignore our latest neighbourhood plan-we have accepted the national need for additional houses and have spent significant time and funds to produce this. It has completely demoralized the parish council and make a mockery of the whole process.

I have included my comments below why i believe this is not a viable plan for the council.


CDC have not consulted on revised housing numbers in North of the district-it quote the restrictions of the A27 which prevents the southern development however the A281 is a bigger constraint which will also have Dunsfold adding pressure.
Allocation of 220 houses plus a further 91 houses on already allocated sites is not sustainable in rural Loxwood-it a huge Percentage increase and will destroy the village.
CDC Sustainability Appraisal is weak in its justification for allocation of 220 houses
There is no viable bus, lack of sewerage capacity, a village school, shops to support large increase in housing

Policy A15 should be removed and Policies H2 and H3 amended to reflect a realistic allocation of 125 houses which is still generous compared to other local area with better services.
Loxwood should not be deemed to be a strategic location-it is a small rural village
LPC have spent time and effort to create a Revised Neighbourhood Plan which allocates 126 houses plus 17 carried forward from the Made Neighbourhood Plan giving 143 houses. It has reached Regulation 14 consultation stage and is based upon the Preferred Approach Local Plan consultation. The residentsof the Parish and Loxwood Parish Council have satisfied themselves through evidence gathered that 126 homes is a sustainable allocation given the constraints that exist-it should not be ignored due to water neutrality issues
This protects the village and the community and reflects the importance of Neighborhood plans for Loxwood and the rest of the country -there is a process and it should be respected otherwise it makes a mockery of the whole planning system and developers win every time.
Please can you protect the rural nature of this county and vote against plan.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5615

Received: 17/03/2023

Respondent: Thakeham Homes

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

It is argued that over the 18-year Plan period there should be some growth within all Parishes, even at a low level and that any without growth is suitably justified.

Full text:

See attached representation.

Attachments:

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5638

Received: 17/03/2023

Respondent: Landowners at Chantry Farm

Agent: Henry Adams LLP

Representation Summary:

The table contained in the policy identifies that 30 additional houses will need to be provided in Westbourne either through a Neighbourhood Plan or subsequent Development Plan Document. Our clients wish to make representations that they support this approach and the proposed housing numbers of 30, with these being increased should supporting evidence be provided.

The clients wish the make the Inspector aware of their considered potential for additional housing on their land, allocated within the Neighbourhood Plan. Furthermore, they consider that any potential shortfall of housing in the Parish could be meet by development on their land.

Full text:

These representations are made on behalf of our client, the owners of Land at Chantry Farm, Westbourne who wish to support Policy H3 of the Chichester Local Plan 2021 – 2039 Proposed Submission Regulation 19 Version but object to Policy NE4.

Background

The owners have been promoting the land in the plan enclosed at Enclosure 1 at all relevant opportunities. The land hatched in blue is allocated in the Westbourne Neighbourhood Plan for 6 houses, the green land is allocated as local green space and the purple is available for either residential development or nitrate/bio diversity offset land for the proposed residential development on the blue land.

The land has been marketed by ourselves, and a developer is looking to purchase all 3 parcels. They will look to submit an application in the shorter term to illustrate that the development will be delivered in the early part of the plan period,

Policy H3

Policy H3 of the Chichester Local Plan relates to the non-strategic parish housing requirements for the plan period. The table contained in the policy identifies that 30 additional houses will need to be provided in Westbourne either through a Neighbourhood Plan or subsequent Development Plan Document. Our clients wish to make representations that they support this approach and the proposed housing numbers of 30, with these being increased should supporting evidence be provided.

The Westbourne Neighbourhood Plan 2017 – 2029 was made by Chichester District Council in September 2021 and allocated 28 houses on 3 separate sites. Our client’s land is allocated under Policy SS3 of the Neighbourhood Plan, Land adjacent to Chantry Hall, Foxbury Lane for a development of 6 dwellings.

Our clients support the housing allocation on their land, however the land is able to accommodate far more than 6 dwellings, perhaps up to 20. Our clients wish for the inspector to be aware of the ability to accommodate additional dwellings, should they feel that Westbourne is a sustainable location for numbers in excess of 30 dwellings.

In addition, we would question whether 30 dwellings need to be provided in addition to the 28 allocated in the Neighbourhood Plan as this predates that Proposed Submission Version of the Local Plan. There is currently an application being considered by Chichester District Council for the land allocated under Policy SS1: Land to the West of Monks Hill Lane under ref. WE/22/00209/FUL which we would assume will be approved prior to the Local Plan being adopted. In addition, there is an application under consideration for the land allocated under Policy SS2: Land at Long Copse Lane under ref. 21/02159/FUL which is currently being appealed by the applicant.

It should be noted that the second site mentioned above, land at Long Copse Lane, is allocated in the Neighbourhood Plan for 16 dwellings. However, the application is for just 7, so below the allocation figure. Although, the Land to the West of Monks Lane is 3 dwellings over the allocation, there is potentially a shortfall of housing already in the Parish with the lower numbers consider at Monks Lane. Our clients land is able to accommodate any shortfall.

Policy NE4

Policy NE4 states that ‘Development proposals within strategic wildlife corridors will only be granted where it can be demonstrated that:
1. There are no sequentially preferable sites available outside the wildlife corridor; and
2. The development will not have an adverse impact on the integrity and function of the wildlife corridor and protects and enhances its features and habitats.’
Part of our client’s land is allocated in the Neighbourhood Plan, so we are concerned that location within the Wildlife corridor will restrict development on a site which is deemed suitable by the Parish and District to accommodate housing.

We would ask that the District and Inspector consider this in the examination of the Local Plan, and that the land allocated in the Neighbourhood Plan, for clarity shown in blue at Enclosure 1, be removed from the wildlife corridor and evidence base considered further as this appears to be absence as to justification of location.

In conclusion, our clients support additional housing in Westbourne but would ask these numbers are seen as a minimum figure. Our clients land is deliverable, with solutions to resolve nitrates and biodiversity on site. Also, we would ask that the Wildlife Corridor is amended to exclude our client’s land that is allocated.

Attachments:

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5641

Received: 17/03/2023

Respondent: The Stickland Family

Agent: Henry Adams LLP

Representation Summary:

In conclusion, our client supports the proposed housing numbers in Policy H3 for Wisborough Green
and that the proposed figure of 75 should be seen as a minimum figure. Our clients will be making
the District and the Parish aware of their land being available. This land is also deliverable, with
potential solutions on site for bio-diversity and water neutrality.

Full text:

Chichester District Council – Reg. 19 Local Plan Consultation – Land to the West of Wisborough Green
These representations are made on behalf of our client, the Stickland Family who wish to support Policy H3 of the Chichester Local Plan 2021 – 2039 Proposed Submission Regulation 19 Version.

Background
The Stickland Family are local landowners who live and farm in Wisborough Green. They own approximately 48 acres of farmland and buildings to west of the village, along Kirdford Road. Their land hasn’t been promoted to either Chichester District Council or Wisborough Green Parish Council previously. However, the site will be submitted for consideration in the next publication of the
Housing and Economic Land Availability Assessment (HELAA). In addition, we will be making contact
with the Parish Council to ensure that they are aware of its availability.

Site suitability
The land comprises a mixture of farmland and buildings which could be redeveloped to meet a local housing need. It is also important to note that, given the nature of the existing use, there could be the potential to offset the resulting water neutrality impact. Ongoing surveys and advice is being taken to confirm feasibility and also capacity.
In addition to this, our Clients recognise that Biodiversity Net Gain is an important consideration going
forward. Should part of their landholdings be developed in the future, they do have the ability to provide net gain accordingly.
Both of these points should be important considerations should additional housing sites need to be identified through the Neighbourhood Plan Review or subsequent Development Plan Document. This site is available and deliverable and thus would assist with meeting future housing need.

Policy H3 - support
Policy H3 of the Chichester Local Plan relates to the non-strategic parish housing requirements for the
plan period. The table contained in the policy identifies that 75 additional houses will need to be provided in Wisborough Green either through a Neighbourhood Plan or subsequent Development Plan Document. Our client wishes to make representations that they support this approach and the proposed housing numbers of 75, with these being increased should supporting evidence be
provided.
Wisborough Green Parish Council have commenced with their Neighbourhood Plan review and published the Regulation 14 version in June 2021. This version was based on a lower housing number which was previously identified for the Parish through the Local Plan Regulation 18 consultation.
Therefore, should the Inspector agree with the proposed housing numbers for Wisborough Green, it is assumed that the Parish will continue with their Neighbourhood Plan with the new housing figure.
Our client would like to confirm that their land could provide residential development in line with policy requirements, so the Inspector should not be concerned that there are no additional deliverable sites in the Parish.

In conclusion, our client supports the proposed housing numbers in Policy H3 for Wisborough Green and that the proposed figure of 75 should be seen as a minimum figure. Our clients will be making the District and the Parish aware of their land being available. This land is also deliverable, with potential solutions on site for bio-diversity and water neutrality

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5691

Received: 17/03/2023

Respondent: The Birkett Family

Agent: Henry Adams LLP

Legally compliant? Not specified

Sound? No

Duty to co-operate? No

Representation Summary:

Policy H3 does not allocate any additional housing to Tangmere Parish other than the Strategic Development Location. It is considered that along with the strategic development to the West, that our client’s land to the East of Tangmere can provide additional housing in Tangmere.

Change suggested by respondent:

Promoted land to the East of Tangmere can provide additional housing in Tangmere.

Full text:

These representations are made on behalf of our client, the Birkett Family and the Chichester Local Plan 2021 – 2039 Proposed Submission Regulation 19 Version.

Background

The Birkett Family are local landowners who live in Easthampnett. They own approximately 44 acres of farmland to the west of Easthampnett which is edged red at Enclosure 1. The land has been promoted intermittently to Chichester District Council but they wish to confirm to Chichester District Council and the Inspector that the land is available for development should they consider Tangmere as an area for additional growth.

Site suitability

The land comprises farmland which could be redeveloped to meet a local housing need. Although limited work has been undertaken to date, the landowner is in the process of negotiating to enter into an agreement with a developer / promoter to promote the land to Chichester District Council to ensure it is deliverable.

Therefore, in time and at the request of the Council or Inspector, additional reports and surveys could be provided to support any future housing allocation. However, a highways appraisal has been undertaken, and access to the site is achievable and this can be provided at request.

Soundness

Policy H2 of the Chichester Local Plan allocates 1,300 dwellings at the Tangmere Strategic Development Location. This site has an outline permission and is subject to a Compulsory Purchase Order. For clarity, our client does not object to this allocation, but supports it as it shows that Tangmere is a location that can be seen to grow.

Policy H3 does not allocate any additional housing to Tangmere Parish other than the Strategic Development Location. It is considered that along with the strategic development to the West, that our client’s land to the East of Tangmere can provide additional housing in Tangmere.

We trust our comments will be considered as part of the Local Plan review, and please do not hesitate to make contact if you require anything further.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5729

Received: 17/03/2023

Respondent: Dandara Southern Limited

Agent: Henry Adams LLP

Legally compliant? Not specified

Sound? No

Duty to co-operate? No

Representation Summary:

- It is considered that the selected areas for growth and figures are deliverable, but the plan area could accommodate a greater level of growth;
- The plan does rely on the deliver of Neighbourhood Plan / Small Site Allocations DPD;
- It is considered the wording of H3 is not precise and does [not] provide any clear timetable for delivery within the Plan period

Change suggested by respondent:

The Local Plan needs to give a clear timescale for completion of the supplementary development plan documents in order to give a clear timescale for this to be completed.

Full text:

1 Introduction

1.1 This representation provides a response to the Regulation 19: Local Plan Consultation in relation to the land at Flat Farm, Hambrook, PO18 8FT, as shown on the attached plan HA Appendix 1: Site Location Plan, and hereon referred to as the site.

1.2 This representation will provide a written responses in relation the questions in the Regulation 19 Local Plan Consultation which directly relate to the promotion of our client’s land for future development.

2 Comments on Specific Questions/Tests

2.1 In response to the national planning legislation, this Regulation 19 Local Plan Consultation invites comments on three specific questions, and is the final consultation phase, before the Regulation 19 version of the Local Plan is submitted for examination.

2.2 This representation will respond on these specific questions, and then highlight how our client’s site could help fulfil the full housing requirement for the District through an appropriate allocation within the Council’s Local Plan, or through an allocation of numbers to the Hambrook Parish as set out in policy A12 of the Draft Local Plan, who in turn would select sites through a Neighbourhood Plan allocation.

Is the plan ‘sound’?

2.3 Paragraph 35 of the National Planning Policy Framework defines the tests for soundness which requires the plan to be positively prepared, justified, effective and consistent with National Policy. These matters will now be considered in further detail in relation to the current consultation on the Regulation 19 version of the Local Plan.

Is the plan positively prepared and justified?

2.4 Policy S1 of the Draft Local Plan sets out the spatial development strategy for the District and how the Council will achieve sustainable growth over the plan period and Policy H1 sets out the housing target in response to the strategy. Both policies have been informed by the Sustainability Appraisal (SA) dated January 2023 and the Plan objectives, which are set out at paragraph 2.5.2 of the SA and the Council’s HEDNA (April 2022).

2.5 The SA then goes on to discuss the potential growth scenarios and confirms two points:
• Standard method housing figure for Chichester (excluding SDNP) is 638 dwellings per annum, or 11,484 in total over the Plan period
• The above figure is capped at 40% above the baseline need and that the uncapped figure is significantly higher than this at 884 dwellings per annum (dpa)
2.6 Of particular note is that point ii. above seeks to cap the overall housing increase by no more than 40% above the previously adopted LP housing figure of 435 dpa. The Local Plan then goes on to constrain housing numbers due to an alleged capacity concern along the A27 strategic road network. The Council therefore result in a constrained housing figure by virtue of the standard method ‘steps’ and also due to infrastructure capacity. It should be noted that the 435 dpa figure within the 2015 Local Plan was similarly constrained and an early review was the only basis for accepting this reduced housing figure. This early review did not take place.

2.7 In terms of the influence of the A27, this is the key matter that constrains growth within the southern part of the District. This is based on the evidence base documents that state that the road network cannot accommodate an annual housing figure of more than 535 dpa. This is a fundamental point and one that we do not agree and believe there is capacity to accommodate at least the local housing need within the highway network, alongside potential improvements identified for the following reason.

2.8 The Transport Study (January 2023) is the key document on which the Council rely upon to constrain their housing figure to 535 dpa. On review of this document, it is clear that the Council’s consultants undertook a sensitivity analysis as to whether the core scenario that supports the 535 dpa position in the local plan could accommodate a higher level of growth. The conclusion in paragraph 5.6.5 and 11.2.3 of the Transport Study appears to be that 700 dpa could be accommodated (in the southern plan area) by the mitigation proposed for the 535 dpa core test, with some additional, and as yet undesigned and not costed, mitigation works beyond those highlighted for the Bognor and Fishbourne roundabouts.

2.9 Accordingly, the Council’s own evidence base has undertaken the assessment and concluded that a higher growth figure could be accommodated on the A27, subject to appropriate improvement works. Given the testing of the higher growth figure, which appears to accommodate the higher growth figure, the exceptional circumstances to constrain growth, as set out at paragraph 60 on the NPPF do not exist and the Plan could be considered unsound on this point alone.

2.10 As a result of the above, the SA does not consider a scenario where the Council would meet its local housing need, nor a scenario where it exceeds its local housing need, which is of relevance given scale of development expected for adjoining authorities, including the highly constrained SDNP.

2.11 It should also be noted that the draft Plan does not therefore address any need in relation to unmet need of neighbouring authorities and it does not contain evidence to suggest that these matters have been discussed with the adjoining Authorities. Notably, Arun District Council have confirmed that they will be objecting to the Plan and currently proposed on the basis that they have a significant housing need themselves. This is likely to be further influenced by unmet need from Chichester, who again are seeking to constrain housing requirements, which was the case in 2015 and the subsequent knock on from that was for Arun to address some of that need in their 2018 Local Plan.

2.12 Given that we do not accept that the A27 capacity matters present a ceiling in terms of housing delivery (based on the Council’s Transport Study comments and that of its own consultants), it is not accepted that the Plan and associated SA demonstrates reasonable alternatives have been considered and it is not therefore positively prepared, nor is their approach to housing figures justified.

Effective?

2.13 On the basis of the 535 dpa figure, it is considered that the selected areas for growth and figures are deliverable over the Plan period, however, as set out above, the plan area could accommodate a greater level of growth.

2.14 It should also be noted that the plan does rely on the delivery of Neighbourhood Plan and / or small site allocations DPD. This is set out under Policy H3 in the draft document. This states the following in terms of delivery:

If draft neighbourhood plans making provision for at least the minimum housing numbers of the relevant area have not made demonstrable progress the council will allocate sites for development within a development plan document in order to meet the requirements of this Local Plan.

2.15 The above is not precise and does provide any clear timetable for delivery within the Plan period. Whilst my comments are noted above that the Plan could be effective, the Local Plan needs to give a clear timescale for completion of the supplementary Development Plan documents in order to give a clear timescale for this to be completed.

Is the plan consistent with National Policy?

2.16 On the basis of the comments above, the approach to selected sites for allocation based on the 535 dpa figure is considered to be consistent, however, due to the lack of evidence to demonstrate that the 535 dpa figure should be capped due to the A27 capacity points raised, the draft Plan does not appear to meet the exceptional circumstances allowed for at paragraph 61 of the NPPF to justify their alternative approach. The Plan as proposed is therefore inconsistent with NPPF when read as a whole.

3 Development in Chidham, Hambrook & Nutbourne

3.1 Our client’s site is located within the village of Nutbourne and comprises an area of land of 1.3 hectares adjacent to the existing residential development along Broad Road. The site is currently located outside, but directly to the east of the settlement boundary of Nutbourne.

3.2 The Local Plan provides for a moderate level of growth within the parishes of Fishbourne, Chidham & Hambrook and Bosham, known as service villages, where it is acknowledged that there is good / excellent potential to bring forward development with opportunities to support and expand existing facilities and for increased use of public transport options.

3.3 Policy A12 relates to the strategic Chidham and Hambrook allocation and confirms that land will be allocated for development in the revised Chidham and Hambrook Neighbourhood Plan for a minimum of 300 dwellings and supporting facilities and infrastructure.

3.4 The Parish of Nutbourne and Hambrook is a logical position for the strategic expansion of 300 dwellings, given its sustainable transportation links and lack of constraints in comparison to other locations within the southern area of the District. The evidence documents which have informed the Plan also support the quantum of development put forward in the policy allocation.

3.5 As our client’s land could deliver up to 40 dwellings, it would be an appropriately sized site, adjacent to the existing settlement boundary of Nutbourne, which would not compromise the spatial development of Nutbourne or Hambrook to the north. We will therefore be looking to promote our client’s site with Chidham & Hambrook Parish Council through a Neighbourhood Plan allocation, and will be recommending to the Parish they allocate a
number of small to medium sites to meet the Local Plan policy requirement of 300 dwellings. This development strategy will ensure the integrity and current linear spatial pattern of the service villages are maintained.

3.6 Our client’s land is ideally situated adjacent to existing residential development which surrounds the site to the north, south and west. This includes the recent development at Hambrook Place and the linear form of dwellings along Broad Road to the west, Hambrook Holiday & Caravan Park to the north and further residential development accessed from Broad Road to the south. The site would not extend further to the east than the built form of development located to the north and south and would not therefore encroach on the wider field pattern to the east. The impact on the wider rural landscape to the east would therefore be limited and the views looking towards the South Downs from the A259 would not be harmed.

3.7 The site sits outside and to the south of the Green Corridor shown in the Interim Version of the Chidham & Hambrook Neighbourhood Plan Strategy published October 2021. The development of this site would not therefore impact on the integrity of the Green Corridor or the gap between the settlement boundaries of Hambrook and Nutbourne as shown in the Neighbourhood Plan Strategy.

The Current Appeal

3.8 In addition to the promotion of the site for allocation within the next iteration of the Neighbourhood Plan, the Council will be aware that this site is also currently subject to a pending appeal relating to planning application 20/03378/OUT. This application seeks outline planning permission for thirty dwellings with access, associated works, including the provision of swales.

3.9 The pending planning appeal follows a previous outline application, 20/00412/OUT for an entry level housing scheme of thirty-five affordable dwellings which was dismissed at appeal on 14 January 2022. The main reason for dismissing this appeal was the proposed development was considered to give rise to adverse effects on the integrity of the local Habitats sites. Whilst the Inspector considered adequate mitigation measures in respect of nutrient neutrality had been provided by the Appellant, an appropriate mechanism for securing these measures for the duration of the development had not been provided with any adequate degree of certainty. It should be noted that no other concerns were raised by the Inspector in relation to the suitability of this site for the development.

3.10 The Council have raised two concerns in relation to the current pending appeal for thirty dwellings on the site. The Council raise concern with future occupiers of the discounted market housing (DMS) not being able to obtain mortgages due to properties proximity to electricity pylons which would lead to properties being occupied on a social rented basis. In this scenario, the Council consider in combination with the adjacent social rented scheme, this would result in an unacceptably high concentration of mono tenure properties.

3.11 The Chidham & Hambrook Neighbourhood Plan Strategy also notes the presence of pylons and overhead power lines along the northern edge of Nutbourne and the limitations this might cause to development in relation to the guidance published by National Grid (Design Guidelines for Development near Pylons and High Voltage Overhead Power Lines).

3.12 Taking into account the Inspector’s comments on this point in relation to the previous appeal for 35 no. affordable residential dwellings, it should be noted that the Inspector previously considered that the Appellant’s evidence demonstrated that there were lenders willing to offer mortgages for DMS properties.

3.13 It should also be noted that as this forms an outline planning application with all matters reserved except for access, the layout of affordable housing is not a matter to be considered under this outline appeal scheme. Nine affordable units would also not lead to an intensive cluster of affordable housing as they have frontages onto different roads.

3.14 The second issue raised by the Council in relation to the appeal could be overcome through the provision of a s106 agreement to provide an appropriate mechanism to secure the mitigation measures relating to nutrient neutrality.

3.15 As the Council have raised no concerns in relation to the principle of residential development on the site with regard to the current planning appeal, the use of the site for residential development is generally considered to be acceptable. This could be delivered through a successful outcome on the current appeal, through a future allocation within the Neighbourhood Plan or via an SPD prepared by the Council.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5740

Received: 17/03/2023

Respondent: Metis Homes

Agent: Nova Planning

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Whilst the Facilities Audit (2018) that informed the settlement hierarchy is out-of-date, it scores the settlement of Westbourne higher than Loxwood and does not take account of the fact that Westbourne is within cycle distance of both Southbourne and Emsworth (Havant Borough) train stations. Despite its comparatively higher sustainability credentials, Westbourne has an allocation of only 30 dwellings. This allocation is based on a flawed Spatial Strategy and as such it is not properly ‘justified’. Consequently, the draft Plan is unsound.

Full text:

See attachments.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5778

Received: 17/03/2023

Respondent: Beechcroft Developments Limited

Agent: Genesis Town Planning Ltd

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

An increased dwelling requirement could be accommodated without the need to significantly alter the proposed spatial strategy. Additional development could be accommodated at less constrained Service Villages in northern parts of Manhood Peninsula. Not all of Manhood Peninsula is affected by challenges. Hunston is relatively unconstrained compared to other parts of Manhood Peninsula. Hunston has good accessibility to road network. Additional development at Hunston would be consistent with Policy T1. Hunston has been, and continues to be, a sustainable location for new development. Previous work on emerging Local Plan and now withdrawn Neighbourhood Plan demonstrate that it is capable of delivering at least 200 homes during Plan period. Site promoted at Land at Hunston Village Dairy.

Change suggested by respondent:

Make a strategic scale allocation as part of Policy H2; set a housing figure of at least 200 homes for Hunston in Policy H3 which could be delivered as part of Neighbourhood Plan process.

Full text:

See attachments.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5839

Received: 17/03/2023

Respondent: Kirdford Parish Council

Agent: Troy Planning + Design

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Define small-scale housing; clarify that making 'provision' is not the same as making 'allocations' ie; some housing can be expected from windfall sites; paragraph 5.10 not reflected in policy.

Change suggested by respondent:

Define small-scale housing; clarify that making 'provision' is not the same as making 'allocations' ie; some housing can be expected from windfall sites;

Full text:

See attachment.

Attachments: