Policy S12: Infrastructure Provision

Showing comments and forms 31 to 57 of 57

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1881

Received: 06/02/2019

Respondent: Jennie Horn

Representation Summary:

- Most schools already at capacity
- No provision for schools for future development in Witterings/Bracklesham area
- Funding for schools to be considered
- Doctors already at full capacity
- Dentists already at full capacity

Full text:

Having trawled through the CDC Local Plan, which I have to say at the outset is the least user friendly document I have had the misfortune to read in a long time. The sceptic amongst me , would claim that CDC has deliberately done its best to make it as inaccessible as possible and these points go to explain my reasons for coming to that conclusion.

:- It was released just before Christmas, when CDC knows that people are busy.
:- It was released with very little advertising and only now has there been a little more effort but still not enough..
:- Very few public exhibitions have been put on or advertised , many actually put on by local communities horrified at what has been included.
:- Only available really to those who have access to the internet as there is a charge of £15 for a paper copy so excluding many of the older generation who do not have access to the internet.
:- the fact that the software being used only allows one response from an email address. Any others are not acknowledged.

I would like these issued raised and acknowledged. For such an important Consultation to be conducted in this matter is harmful and actually against a democratic process.

I have commented electronically but because of the constraint of 100 words this makes commenting properly very restrictive , I am therefore submitting this email as well and insist that both my electronic comments/objections are taken together and that neither is excluded.
I welcome a need for a Local Plan to safe guard the uniqueness and sustainability of our beautiful city, but this plan is wholly unfit for purpose. In places it is so biased and contradictory , it has actually made me laugh ! This is a Local Plan so why has there only been development in the South , East and West. For some reason Goodwood and the North has either been included and then removed or excluded completely. This is not a LOCAL PLAN, this is a biased and incomplete plan because of this exclusion.

The Southern and western areas that border Chichester Harbour AONB have been repeatedly included in the plan for significant development despite having the a same or greater criteria for exclusion than Goodwood and the area to the south SDNP which have been excluded. This invalidates the Plan as it contradicts all the criteria used and makes a mockery of the Plans integrity.

TRANSPORT

The transport study done by Peter Brett Assoc (PBA) is completely unfit for purpose. The study has only explored short term transport infrastructure which is completely unacceptable for this Plan which specifically states that is should be looking at short, medium and long term transport models especially the considering the Plan is supposed to last until 2035. It has included a link road in AL6 which was roundly opposed in the democratic Highways England (HE) consultation of 2016 along with hybrids of Options 2 and 3 also rejected, so it should not have been included unless all other options including the preferred Mitigated Northern route had also been included.

There has been no detail of how these large housing developments (over 2000 homes) along the A259 are going to access the A27 which is already at full capacity at the Fishbourne Roundabout. There is also no evidence that the required consultations between CDC, PBA and HE have taken place so any inclusion of link roads and junction upgrades are invalidate and should be removed and if not adequately addressed in future iterations of this plan , I will raise it with the examiner at the appropriate time .The PBA actually claims that there will not be an increase in air/noise/pollution by the building of a link road. REALLY ! You are proposing to build an elevated road (due to it being on a floodplain 3 zone !) which would have to be 4 metres high in an open flat topography, bordering the highly sensitive Chichester Harbour AONB with dark skies and noise/air pollution protection and restricting right turns only, necessitating Stockbridge and Whyke roundanabout traffic to travel twice as far and the report states that there would be no increase in air pollution.Absolutely ridiculous and totally unrealistic.They also state that there will be no further increase in air pollution despite traffic volume increasing year on year. Chichester, especially Stockbridge Roundabout has frequently breached air quality limits in recent years and continues to do so. So this part of the report is just nonsense.(DM24/SP28)
There is also no mention of any realistic funding. Again you cannot include junction upgrades which come under the jurisdiction of HE and for which no consultation evidence has been shown in the report. CDC Local Plan should not include any upgrades that they do not have confirmed funding for when the plan is produced. Anyone can produce a plan with a nice wish list but this does not make a professional /viable document .
CDC said itself that "any highways improvements should mitigate congestion on the A27"....the limited detail in this plan actually adds to the congestion it does not mitigate it and it again hugely disadvantages local traffic.

All the proposed developments along the A259, at Chidham/Hambrook, Bosham, Southbourne and Fishbourne all claim that they are sustainable because they have good transport links in the form of bus and rail links. They do not and these transport link viabilty and frequency cannot be influenced by CDC as they are run by independent companies. At present the bus service is fairly frequent at peak times but other times is not so cannot be relied upon. It is also not a very cheap option for many people. Rail links have been cut significantly in recent years with timetable rearrangements and places like Bosham and Southbourne have one train stopping once an hour at peak times, to and from Chichester. Not what I would call good links. and again is expensive..£2.80 for a single from Fishbourne...a journey of 5 minutes !! So these developments would realistically rely on cars again so increasing the burden on the Fishbourne of Emsworth junctions that are already running at full capacity.

Unless these issues are adequately addressed in future iterations of this plan, i will raise it with the examiner at the appropriate time.

HOUSING

( including 3.17,S3,S5,S19,4.3 )

Why is CDC not insisting that SDNP take back responsibility for the allocation of 41 houses a year . It would remove the need for CDC to find areas for another 200+ houses within their local plan and SDNP should be promoting small scale house building within the Park in order to sustain local services such as schools and local services which will die if more families are not encouraged.

Why has the north of Chichester ,been removed from the plan...houses along the A259 amount to well over 2000 houses with the same environmental sensitivities and yet houses south of the SDNP to Chichester NONE. There is no justification for this as there is suitable land around Goodwood airfield and Rolls Royce that could be used and was originally included in the plan but again was removed for no justifiable reason. Why can large villages like Lavant and Boxgrove not have any housing allocation ? They are classed as local service hubs as they have shops and schools and yet are excluded. Unless this is adequately addressed in future iterations of the plan, I will raise this with the examiner at the appropriate time.

New housing need to be smaller less intrusive developments so that they don't overwhelm and swamp existing residential areas. They also need to be a majority of affordable housing for people with local connections. These local connections should actually mean people born in the city or whose parents have lived in the area for the majority of their lives. Local young adults don't stand a hope of buying or even renting in Chichester as the prices are so high compared to wages of most ordinary people.There should be a ban on second homes and but if they do slip though and are rented out, then rents should be capped to make it less attractive to landlords.

New developments should not include 'executive' 4 and 5 bedroomed houses. There are enough of these in Chichester and so developments should consist of 1, 2 and 3 bedroomed properties only with a few 4 bedroomed houses to satisfy housing association demand.

Why are brownfield sites like the one bordering Swanfield Drive / Portfield near Sainsburys not being used for housing if demand is so crucial. We do not need anymore out of town entertainment which is killing the town centre.It should be reclassified for housing , as it would have less impact, is within walking distance of services and already borders residential areas..

Unless these issues are adequately addressed in future iterations of the plan, I will raise it with examiner at the appropriate time.

SCHOOLS/SERVICE INFRASTRUCTURES

(including 4.85)

Although there is lip service paid to providing schools, it is all very vague. If you are building developments of 250 + then you are going to need school provision. Most schools in places like Bosham are already at full capacity from local children so expansion or new schools need to be built very early on in any development. The threshold should be very low , for example when the 50th house of 250 is built, that way the services will already be in place before the houses are occupied. Most primary schools within Chichester city and surrounding villages are now already at full capacity necessitating parents to have to travel in cars to get their children to less local schools. The schools like Parklands Primary that have been expanded recently to take two form entry have suffered from substandard design and building. Stairs out of action for months. Disabled toilet out of use and worst of all classrooms too hot in summer due to lack of air conditioning which meant children had to be sent home for several days. This particular issue has still not been addressed so will occur next year when the temperature rises.

Although the Free School has recently been completed( but because of its site requires most children to access by car at least some if not all of the way,) relieving pressures on primary and secondary school places, no provision has been made for future developments around the southern peninsula of Witterings/ Bracklesham etc which necessitates huge transport movement twice a day as there is no secondary school provision within a 6 mile radius.

Funding for such new schools are not funded by CDC and therefore these should have been properly costed and funded before they could be legitimately included in the Local Plan...again a fictitious wish list !!

No mention of where people are going to find other services such as doctors and dentist, many of which are already running at full or near full capacity.If there are no services available locally then people will be forced to travel. No mention of increased travel because of this and lack of local school places in the Local Plan.

Unless these issues are adequately addressed in future iterations of this plan, I will raise it with the examiner at the appropriate time.

AIR QUALITY

DM24/SP28 There is no acknowledgement of the fact that the air quality levels especially at Stockbridge Roundabout exceeds quite substantially acceptable levels set by the Government. Such an omission is significant and has a huge influence on future planned developments and unless it is adequately addressed in future iterations of the plan, I will raise this with examiner at the appropriate time

AL6.

Well where do I start on such an utter inaccurate piece of wilful destruction and vandalism. AL6 contradicts everything that the Local plan states .
It does not protect the biodiversity of the area...It DESTROYS it
It does not protect the historic views of the only Cathedral visible from the sea...It DESTROYS it.
It does not enhance the natural environment (S26)... It DESTROYS it
It does has an adverse impact on the openness of views in and around the coast. (S26)..It DESTROYS them.
It does not have regard to flood and erosion policy (S27)...It WILL increase the likelyhood of flooding and contamination of Chichester Harbour water.
It does not protect the area from light/air/noise pollution(DM23/24 etc)....it would DESTROY the dark skies policy and hugely increase air pollution.

I could continue. AL6 should be removed completely. The Plan itself states that no proper study has been done into the impact of AL6 and so that very admission should have been enough to exclude it from the plan.How can you include a destructive option like this without doing any sort of environmental study or impact study first. Unprofessional and disgraceful AL6 comes within 100 metres of Chichester Harbour which has AONB status which holds the same protection as the SDNP but does not have the same 5km exclusion that the SDNP has been given....strange that !! Unfortunately Chichester Harbour does not have a landed Estate as its neighbour !!

AL6 is on a category 3 Floodplain , which under Governments own rational means that it should not be developed for housing or industry at all because of the unacceptable flood risk and only then developed if ALL other less risky sites have been developed first and only then for suitable light use. Land to the south of the SDNP has been removed due to it being under risk of flooding and yet it is mainly classed as Flood zone 2 , a lesser risk. So why was it removed for this reason and AL6 left in place ?
INCONSISTENCY and BIAS. REMOVE AL6.

Under CDC own data, a link road would need to be elevated to 4 metres in order to be safe from flooding.How on earth are you going to mitigate a road that high which is on a flat topography with historic views of Chichester and the Cathedral ? .This would then contravene Government policy on pollution and housing , as the toxic fumes from the road would reach higher into the air.REMOVE AL6.

This link road and Options 2/3 were hugely unpopular in the 2016 Highways England Democratic Consultation and were emphatically rejected by the vast majority of Chichester residents as they knew it would be short term and ineffectual and that along with the no right turns at junctions would hugely hinder the movement of local traffic. CDC were seen to accept that and Cllr Dignum said that "any Highways improvement should mitigate congestion on the A27". Clearly this scheme would not and so why is the link road included. If you want an unbiased complete Plan then surely the mitigated Northern route should have been included in this plan as the criteria are the same...no funding and no HE acceptance, or exclude both proposals. Again double standards to the detriment of the south.No roads should have been included as they do not come under CDC remit or funding and the protection under Para 3 AL6 is unachievable. Total betrayal under Cllr Dignum leadership.REMOVE AL6

In order to instigate a link road , junction upgrades are also mentioned...(but not funded by CDC and no consultation evidence with HE in the Local Plan S23 and PBA report) Each junction is estimated to take a minimum of 3 yrs to complete, that's 15 years of gridlock, air pollution and misery. Seriously. Chichester city and tourist industry would be destroyed. REMOVE AL6

There is no mention of only a 100 metre border with the Chichester Harbour AONB and yet frequent reference is made to the SDNP 1km border. Double standards and inconsistency again.REMOVE AL6

There is no mention that the land earmarked in AL6 is floodplain 3 category. Frequent reference to SDNP/Goodwood being in Flood zone 2 and a small amount in Flood plain 3. Again double standards and inconsistency. REMOVE AL6

No mention to the destruction of the views and yet time and again SDNP/Goodwood views of the Cathedral are mentioned and pushed. The views from SDNP/Goodwood are far less prominent and actually are invisible because of the topography of the land in many places. Not the case for views in AL6 where uninterrupted views of the Cathedral can be seen from the coast in almost any position looking north. Double standards and inconsistency again.REMOVE AL6

No amount of mitigation could protect Chichester Harbours unique ecology. It has status as an AONB, SPA,SAC,SSSI and is a Ramsar site. There is no detail of how a successful buffer zone would be applied.There appears to be no room for a proper successful wildlife buffer zone, with proposed building up to 100 meters of the harbour.There would be significant adverse ecological damage done, from light, noise and especially air pollution,which already breaches Government and EU safe levels. There is no mention of waste water management and the capacity for any further waste water to be processed at Apuldram Water Treatment plant is not an option as it has reached capacity so the risk of polluted water entering Chichester Harbour is incredibly high and an unacceptable risk.(Policy S18) REMOVE AL6

There are other much more suitable areas already identified around Goodwood Airfield and Rolls Royce which meet the criteria set out in the plan for housing and light industrial employment and already have suitable infrastructure but have been unjustifiably removed. These should be reinstated and AL6 REMOVED.

Any development of AL6 would necessitate movement by car due to its proximity to the A27 .This is against CDC Local plan policy of encouraging any new developments to either be well served with public transport or sustainable transport ie cycling and walking. The position of this site will not meet this criteria. REMOVE AL6.

There is no mention of the fact that this site is part of the River Lavant floodplain. Those of us who remember the 1990's , remember the hugely damaging flooding that affected Chichester partly because the water courses and natural drainage had been allowed to deteriorate. AL6 covers a significant part of the River Lavant natural drainage basin. It would be insane to build on this land. It could well result in renewed flooding in the city centre as we get wetter winters and the rain water has no where to go.REMOVE AL6.

The plan is totally inconsistent as to numbers in the development. How can we possibly comment on a plan that in one place states there would be 100 houses and industrial units in AL6 and yet elsewhere it says 200 + homes and industrial units. Ridiculous inconsistency and very unprofessional. REMOVE AL6.

Unless all these issues are adequately addressed in future iterations of the plan, I will raise these with the examiner at the appropriate time.

In summary, The CDC Local Plan in its form at present should be rejected and rewritten with the inconsistency and bias removed. Any development site should only be include when a proper and realistic viability study has been commissioned by independent consultants who will have been given a complete and unbiased brief (unlike the PBA study which is incomplete ,short term and does not reach the brief that was supposedly set). This is hugely important to the Chichester area and its residents. We want and deserve a fair ,complete and transparent plan and this version is not.

CDC along with WSCC should go to central Government and insist that until proper funding is put in places to sort the transport/A27 and services (Schools etc) infrastructure out then although the Plan can be written, no housing will be built until funding has been secured and work started on this vital infrastructure. We cannot sustain this level of development without serious investment on infrastructure and the addressing of dangerous pollution levels because of the lack of it.

Until this Plan has been fairly and properly amended so it provides a properly informed, fair and complete document it should not be adopted and should then be rewritten and only then reissued for full public consultation again. Unless this is adequately addressed in future iterations, I will raise it with the examiner at the appropriate time.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1944

Received: 07/02/2019

Respondent: Mrs Sally Mountstephen

Representation Summary:

The minimum number of houses the CDC proposes to build are: the Manhood 1,933, an east-west corridor of 10,056, with a token number of 489 for north of the area plan make no allowances for the inadequate number of police, doctors, schools and transport we already have in place.

Full text:

I write to express my comments on The Local Plan - Preferred Approach

I have lived in West Wittering on the Manhood Peninsula for the last 19 years.
The Manhood Peninsula is a unique area which relies heavily on tourism, agriculture and horticulture; within its boundaries lie the Chichester Harbour Area of Outstanding Beauty (ANOB) and the Pagham Harbour Local Nature Reserve (LNR).
It has only 2 main access roads leading to the A.27.

While I have huge sympathy for the CDC being dictated to by the Government in relation to how many houses, retail units and commercial development they wish to see built, they do not take into consideration the countryside they want it built on.

Therefore I cannot support your view of the way forward (up to the year 2035) as being manageable or workable.

The one massive sticking point is the A.27 itself. I believe there is a considered view that the A.27 in its present form and the proposed northern route round Chichester (2016) is unworkable and unaffordable - the present southern route being unworkable and the northern route unaffordable.
The proposed spur road AL6 (which is Option 3 from the 2016 consultation which was dismissed as it was admitted the road would have to be upgraded to a dual carriage way within 12 years to cope with the increased traffic) from the Tesco's roundabout to link with the A.286 via a roundabout would merely push the traffic south and cause further havoc = eg: cars wanting to access the new Chichester Free School would have to then drive across Wophams Lane, through Hunston to the school, both roads are narrow and are not capable of coping with a huge flow of traffic. Those roads are already used by locals who wish to avoid the congestion on the A.27.

Once upon a time there were traffic lights on the A.27, these were removed and replaced with roundabouts, now you propose to put back traffic lights at the Stockbridge and Whyke roundabouts with no right turn if you are driving in a west - east direction. I have heard the cost to be in the region of £80 million pounds, money you do not have. Just leave the A.27 alone until someone with a vision of the future needs of Chichester has the guts to implement a northern route.


I quote 2 reasons why: An accident on the A.286 on 2nd February 2019 closed the road for 5 hours; a cyclist was killed on 10th May 2018 the A.27 was closed for approx 9 hours. The surrounding roads and Chichester were gridlocked.

The minimum number of houses the CDC proposes to build are: the Manhood 1,933, an east-west corridor of 10,056, with a token number of 489 for north of the area plan make no allowances for the inadequate number of police, doctors, schools and transport we already have in place. The East Wittering's Medical Centre had listed over 10,300 patients registered in 2018 - where is the provision for more medical centres?
All these extra houses will have at least one car per family, reality says two cars; how on earth is the A.27 going to cope with these larger numbers when it cannot cope with today's numbers?

The A.27 is the crux of the problem - get that sorted; then the CDC will have a mandate for the future.

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1962

Received: 05/02/2019

Respondent: Mr David Myers

Representation Summary:

Proposals in the plan will affect the following:
- Roads - increasing traffic, but crumbling roads, no A27 bypass solution.
- Foul Drainage - denials by Southern Water that there are problems. Proposal to run a sewer from Whitehouse Farm around north of Chichester to Tangmere instead of upgrading Apuldram WW treatment works. Sewer pipe problems at Bosham and elsewhere. Untreated sewage discharged into the harbour. Increasing danger to public health.
- Education - existing schools short of funding
- Police - also short of funding
- Hospitals - under pressure

Full text:

The following are my general comments on what I consider to be serious problems that are likely to be encountered with these latest proposals.


Based on past experience I think it fair to say that will be big problems with the lack of sufficient infrastructure (money).


Look at where we are with the current Local Plan:-


Roads - increasing traffic, but crumbling roads, no A27 bypass solution.


Foul Drainage - denials by Southern Water that there are problems. Proposal to run a sewer from Whitehouse Farm around north of Chichester to Tangmere instead of upgrading Apuldram WW treatment works. Sewer pipe problems at Bosham and elsewhere. Untreated sewage discharged into the harbour. Increasing danger to public health.


Education - existing schools short of funding Police - also short of funding
Hospitals - under pressure


The latest Plan will substantially increase the amount of development in the East - West corridor along the A259. This is likely to have an adverse impact on the wild life in the Chichester Harbour AONB, with increased public use of the shoreline footpaths.


I thought the AONB had the same status as a National Park. Surely any ideas for development likely to affect it should be treated in the same way as the NP?

The actual control of when building takes place once permissions are granted seems to rest entirely with developers?

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2013

Received: 08/02/2019

Respondent: Mr Graham Porrett

Representation Summary:

No provisions for education have been met on previous large sites. How can we be assured that planning for education will in fact be carried out.

Full text:

I have a number of issues with the PLAN.
The old plan has not expired yet a more aggressive plan is being introduced.
Few people have commented.
A mail shot to all residents should be implemented outlining the individual aspects
The A27 Junction alterations appear to be a "southern route" by stealth.
The Appuldram link road in particular is of serious concern what with its proximity to the Harbour.
No provisions for education have been met on previous big builds how can we be assured that planning for education will in fact be carried out.
The intensity of build projects appear to have exceeded the current plan targets, why impose a greater plan ahead of requirement.
A stronger opposition to building the large scale developments should be implemented.
Of the new build how many will be for Chichester residents. If outside families move into the borough their children's requirements will only exasperate the future housing requirements.
What properties are for current residents and will a rule apply to prevent outside occupation.

My main concern is that the PLAN is too big and complex for many to fully understand and longer should be taken to fully explain the implications.

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2105

Received: 15/02/2019

Respondent: West Sussex County Council

Representation Summary:

Support the requirement that all development must provide or fund new infrastructure, facilities and services required, both on and off-site (including full fibre communications infrastructure) as a consequence of the proposal.

Support the reference to safeguarding educational facilities under section 3 of the policy.

This Policy, also Policy S13: Chichester City Development Principles, should aim to encourage cycling and walking access to be the natural and preferred modes of access.

Remove reference to Strategic Infrastructure Package and replace with WSCC wording.

Full text:

West Sussex County Council Officer Level Response
Introduction
The Chichester Local Plan Review Preferred Approach sets out how the future development in the District will be shaped, excluding the area within the South Downs National Park, up to 2035. It includes the overall development strategy as well as relevant strategic policies to meet the future needs of the area and development management policies to help guide development over the plan period. The Local Plan helps to:
* choose where the development goes;
* protect the character and beauty of the area;
* provide job and housing opportunities so that children can continue to work and live locally;
* support and help to boost the local economy;
* help residents to maintain healthy and active lifestyles; and,
* make sure that there is adequate services, travel options and community facilities.

The Chichester Local Plan was adopted in July 2015. At that time, the Local Plan was approved, but the Government Inspector said that it had to be reviewed again within five years, to make sure that sufficient housing was planned to meet the needs of the area.

The first part of the review process was carried out in June 2017 with an Issues and Options consultation, in which comments were invited regarding the overall development strategy and possible development locations. The Local Plan Review: Preferred Approach is the second stage of the process. It sets out the proposed development strategy and policies for the area to meet future needs.


West Sussex County Council Officer Level Comments
This note sets out West Sussex County Council's (WSCC) officer response to the consultation on the draft Chichester Local Plan Review Preferred Approach. It highlights key issues and suggested changes to which Chichester District Council (CDC) is requested to give consideration. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding WSCC service requirements in order to mitigate planned development.


Minerals and Waste
A steady and adequate supply of minerals and the achievement of sustainable waste management can help to achieve a District or Borough Council's goals in relation to the economy, housing, transport, communications, strategic infrastructure and the environment. Therefore, District and Borough Local Plans should recognise the importance of minerals and waste issues as relevant to the scope of their overall strategies.

We welcome the reference to the adopted Minerals and Waste Local Plans and safeguarding in the document and the requirements in policies where a site is located within a minerals safeguarding area, or near to a safeguarded waste site. There are some missing references to safeguarding of minerals and waste sites for some of the proposed allocations, set out below and request that these references are added. It is also requested that 'Joint' is added into the references for the Joint Minerals Local Plan through the document.

Policy W23 of the Waste Local Plan applies to all Districts & Boroughs, regarding waste management within development and should be referenced in the Chichester Local Plan Review.

AL3 East of Chichester
The site is to the north of the Fuel Depot site allocation in the Waste Local Plan (Policy W10) for a built waste facility as part of a comprehensive redevelopment of the site (including complimentary non-waste uses). The East of Chichester allocation is the land to the north, bisected by the railway line, of the Fuel Depot. Reference should be made to giving consideration to the allocation, and therefore its safeguarding.

AL4 Westhampnett/North East Chichester
Reference should be made to minerals safeguarding, for consistency with other allocations, as within the sharp sand and gravel safeguarding area.

AL5 Southern Gateway
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 200m of the Chichester Railhead.

AL6 South-West of Chichester
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 300m of the Chichester Railhead.

AL7 Highgrove Farm Bosham
Remove reference to minerals safeguarding as the site is not within the safeguarding or consultation area.

AL12 Park Farm Selsey
Reference should be made to minerals safeguarding as site is within the sharp sand and gravel safeguarding area.

Neighbourhood plan allocations
Sites are yet to be allocated though neighbourhood plans. It is considered that the Joint Minerals Local Plan and Waste Local Plan are referenced, particularly with regards to safeguarding policies (M9, M10 and W2) and these documents and policies are given detailed consideration when allocating sites. Development at, adjacent or proximal to existing waste or mineral sites / infrastructure should be the subject to consultation with WSCC.


Connectivity and Sustainable Travel
The County council has worked with the District Council on the preparation of the transport evidence base study undertaken by Peter Brett Associates for the District Council. The recommended transport mitigation strategy, as assessed using the Chichester Area Transport Model has been demonstrated to be capable in principle to prevent the development from resulting in severe residual cumulative impacts on the highways and transport network. However, the recommended strategy has several risks to deliverability and acceptability associated with it, which require further work to be undertaken to demonstrate that the strategy can be implemented in its current form to provide the forecasted mitigation to travel conditions.

There are three locations where new highway alignments are proposed outside of existing highways boundaries. Two of these may include significant earthworks or structures to be delivered, being Stockbridge Link Road and Terminus Road diversion. The cost of the mitigation strategy exceeds a figure which could reasonably be supported by the value of the proposed development developer contributions alone, therefore the delivery of the strategy will depend upon securing of external grant funding to top up developer contributions. WSCC will work with the District Council in supporting and or applying for funding, the District Council needing to secure Highways England to support funding applications for A27 improvements. The proposed junction designs for the A27 Stockbridge and Whyke roundabouts include bans to well used right turn movements off the Chichester A27 bypass which result in significant forecast changes to traffic flows on local roads in the south of Chichester and on the Manhood Peninsular.

There is a need to ensure the land outside the highway boundary is available and the plan should set out how this land will be acquired to deliver the measures, it may be that a commitment to use, if required, and therefore reference to CPO be made in the policy.

Funding for the mitigation strategy is uncertain. It is considered that the Plan should set out how it will deal with this uncertainty. This could include trigger points in the monitoring framework to trigger a change of approach or alternative options to deliver the required development.

These factors mean that feasibility work is necessary to be undertaken prior to Plan submission, to reduce as far as practicable risks to costs, land take, impacts and deliverability of the proposed transport strategy in order to show that the strategy can be implemented within the plan period and that the funding strategy will be sufficient to meet the design requirements. In particular the following will need to be addressed:

* Statutory undertakers equipment under the roads junctions to be impacted.
* Extent of earthworks required to create a vertical and horizontal alignment compliant with design standards. Design audit to identify any required departures from standard.
* Designing for drainage and flooding issues, including compliance with the WSCC LLFA Policy for the Management of Surface Water, November 2018.
* Designs for structures to cross watercourses - Stockbridge Link Road
* Design should include suitable provision for rights of way and footway crossings
* Scoping for whether and at what level further Environmental Impact Assessment will be required.
* Stage 1 Road safety Audit, designers response report and resulting amendments to designs.
* Land take required after feasibility level designs have been developed and availability of required land.
* Wophams Lane - impacts of forecast changes to flow patterns to take B2201 southbound traffic on requirements for highway width, alignment, footway provision and junctions with A286 Birdham Road and B2201 Selsey Road; design solution required.
* Quarry Lane, Kingsham Avenue /Road, Terminus Road; impacts of forecast flow changes on highway users, residential and commercial frontagers and measures to manage through traffic whilst maintaining local access

Sustainable transport measures will also be required to mitigate planned development. These will be identified through more detailed assessments of sites including pre-application consideration. Funding will need to be identified through development and other sources as well in some cases.

Public Rights of Way
There is support for the Local Plan Review's approach to Public Rights Of Way (PROW), not just for the potential to impact on existing public off-road access but also the opportunity it brings to enhance this access for the benefit of future residents, communities and visitors. PROW deliver benefits for personal health and wellbeing; sustainable transport; reduction of air pollution and road congestion; are able to support local economies; and they connect communities.
WSCC PROW welcomes several aspects of the Vision statement, which give support to the protection and enhancement of the PROW network, and provision of safe and convenient off-road access opportunities for residents and visitors:

* Pursue a healthy lifestyle and benefit from a sense of well-being supported by good access to education, health, leisure, open space and nature, sports and other essential facilities;
* Live in sustainable neighbourhoods supported by necessary infrastructure and facilities;
* Move around safely and conveniently with opportunities to choose alternatives to car travel.

The Local Plan Strategic Objectives offer further support to enhance off-road access, particularly to 'Encourage healthy and active lifestyles for all, developing accessible health and leisure facilities and linked green spaces'. However, the objective to 'Achieve a sustainable and integrated transport system through improved cycling networks and links to public transport' should recognise walking also as an important mode for many people; some strategic enhancements will significantly improve walkers' safety and convenience.

It is considered that West of Chichester the A259 could act as a corridor for increased volumes of non-motorised access, particularly cycling. Improvement of the existing on-road facility and development of a various 'feeder' routes to connect with the many settlements, perhaps using quiet lanes in places, would encourage cycling particularly to be a natural alternative to vehicle use. Policy S18: Integrated Coastal Zone Management for the Manhood Peninsula, gives regard to such an ambition in stating it will 'Improve infrastructure to support sustainable modes of transport, especially cycle ways, bridleways and footpaths, including the National Coastal Footpath'.

The National Planning Policy Framework (NPPF) Open Space and Recreation, para 97b) states:
the loss resulting from the proposed development would be replaced by equivalent or better provision in terms of quantity and quality in a suitable location.
The NPPF para 98 also states:
Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks including National Trails.'
There is support for Policy S20: Design, that recognises these requirements in stating development 'is well connected to provide safe and convenient ease of movement by all users, prioritising pedestrian and cycle movements both within the scheme and neighbouring areas and ensuring that the needs of vehicular traffic does not dominate at the expense of other modes of transport, or undermine the resulting quality of places' and 'incorporates and/or links to high quality Green Infrastructure and landscaping to enhance biodiversity and meet recreational needs, including public rights of way'.


Education
As the local education authority, WSCC has the statutory duty to ensure that there is a sufficient supply of suitable school places to meet statutory requirements for early years, primary, secondary and sixth form provision (including up to age 25 for those with special educational needs and/or disabilities). Education infrastructure, or contributions to provide infrastructure, will be required in order to mitigate proposed development. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding education and other service requirements in order to mitigate planned development.

The table below sets out the primary, secondary school and sixth form requirements to mitigate proposed development. SEE ATTACHMENT FOR TABLE

AL1 Land West of Chichester

It should be noted that phase one of this development will provide the primary school with the core of the building being built to the specification for a 2 form entry (FE) school and 1FE teaching accommodation. Phase 2 as per 6.10 on page 93 should include expansion of the primary school for the further 1FE of teaching accommodation.

AL2 Land at Shopwhyke (Oving Parish)

No update to original response for this allocation is required.

AL3 Land East of Chichester - previously South of Shopwhyke

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 1 FE expandable to 2FE and pro rata share of the build costs would be required.

If numbers were to increase on the east side of the city, education provision will need to be reviewed, potentially a further 1FE may be required including land provision, this could be in the form of an expansion or a new school being built capable of expansion to 3FE.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL4 Land at Westhampnett / North East Chichester

The remaining 200 dwellings will impact on the education provision in the area, financial contributions towards expansion of existing or pro rata costs towards the expansion of the school within AL3.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL5 Southern Gateway

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from the strategic allocation of 350 dwellings in the Southern Gateway. However, consideration should be given to the cumulative impact of housing in the area Land South West of Chichester (AL6) to allocate land within the area for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL6 Land South West of Chichester (Apuldram & Donnington Parishes)

It should be noted that the primary education provision in this area is either in Chichester City Centre which means crossing the main A27 or by travelling south towards the peninsula. Consideration should be given to the cumulative impact of further housing in the area along with the Southern Gateway allocation (AL5) to allocate land within the strategic allocation site for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL7 Bosham

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. The strategic allocation of 250 dwellings in isolation does not require a new school to be built. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL9 Fishbourne

The primary school serving the area is currently at capacity, expansion of the school may be possible, feasibility / options appraisals would need to be undertaken.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of primary and secondary schools and sixth form if feasible and required.

AL8 East Wittering

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development.

Contributions would be required for expansion of primary and secondary schools if feasible and required.

AL10 Chidham and Hambrook area

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL11 Hunston

Any development within this area cannot currently be accommodated in the existing primary school at North Mundham. Further capacity would be required to accommodate the development, CDC will need to work with WSCC to determine how additional capacity in the area could be accommodated if land is to be allocated.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

AL12 Selsey

Further capacity would be required to accommodate the development. Contributions (and possibly land if required) would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

AL13 Southbourne

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 2form entry expandable to 3FE primary school and pro rata share of the build costs would be required.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL14 Tangmere

The current allocation of 1,300 dwellings will bring forward the requirement for land for a 1FE expandable to 2FE and financial contributions would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

Footnote: - if all of the proposed sites were to come forward the secondary school and sixth form provision would be full in the Chichester Planning Area. Expansion of the secondary schools in the Chichester Planning Area to cater for the increased demand would need to be sought from the academy sponsors, where appropriate and the Local Authority.


Lead Local Flood Authority
The Lead Local Flood Authority (LLFA) is concerned about the approach being taken with regard to ensuring potential wastewater treatment for proposed new sustainable development.

Paragraph 8 of the NPPF states:
8. Achieving sustainable development means that the planning system has three overarching objectives, which are interdependent and need to be pursued in mutually supportive ways (so that opportunities can be taken to secure net gains across each of the different objectives):

a) An economic objective - to help build a strong, responsive and competitive
economy, by ensuring that sufficient land of the right types is available in the
right places and at the right time to support growth, innovation and improved
productivity; and by identifying and coordinating the provision of infrastructure;

Paragraph 20 of the NPPF states:
20. Strategic policies should set out an overall strategy for the pattern, scale and quality of development, and make sufficient provision for:
a) housing (including affordable housing), employment, retail, leisure and other commercial development;
b) infrastructure for transport, telecommunications, security, waste management, water supply, wastewater, flood risk and coastal change management, and the provision of minerals and energy (including heat);

In the LLFAs view, the Local Plan Review is not setting out an overall strategy for the pattern, scale and quality of development in relation to arrangements for wastewater management. The LLFA considers that CDC needs to go further in incorporating within the Local Plan Review how this provision is being made.


Additional Policy Comments

Policy S12: Infrastructure Provision
Support the requirement that all development must provide or fund new infrastructure, facilities and services required, both on and off-site (including full fibre communications infrastructure) as a consequence of the proposal. The explicit reference to full fibre communications infrastructure is supported as this will provide gigabit-capable and future-proofed services to all development, existing and new. The reference to provision of facilities and services on and off-site is also supported as in the case of broadband for example, all development will be adequately equipped with the necessary infrastructure installed for the purposes of connecting to full fibre gigabit-capable broadband services. This policy supports the County Council's aim for increased digital infrastructure that will provide for gigabit-capable broadband and future technologies such as 5G.

Support the reference to safeguarding educational facilities under section 3 of the policy.

The policy includes the requirement to 'Facilitate accessibility to facilities and services by a range of transport modes'. PROW can offer vital access means for walkers and cyclists, such as for employment land use (e.g. commuting by bicycle) and in support of the high street, both for employees and customers. IT is considered that this Policy, also Policy S13: Chichester City Development Principles, should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.

The supporting text, paragraph 4.81 makes reference to the Strategic Infrastructure Package (SIP). It is requested that this wording is removed and replaced with West Sussex County Council identifies service infrastructure requirements necessary to support new and existing communities, where strategic development and growth is proposed in Local Plans. These are required to deliver the County Council's statutory responsibilities, strategic objectives and current policy and feed into the preparation of the Infrastructure Delivery Plan.


Policy S13: Chichester City Development Principles
This policy, like policy S12, it is considered should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.


Policy S23: Transport and Accessibility
The policy and supporting text paragraphs 5.15 - 5.33 refer to Transport Infrastructure. Understandably much consideration is given to the A27 around Chichester; however, in addition to seeking new infrastructure from new development, it is recommended support in principle is given to maximising the value of existing infrastructure so as to facilitate off-road user modes accessing either side of the A27.


S24: Countryside
Supporting text paragraphs 5.34 - 5.43, acknowledges 'it is necessary to provide for the social and economic needs of small rural communities, and enable those who manage, live and work in the countryside to continue to do so'. It is recognised in para 7.205, supporting text to policy SM35 Equestrian Development, the high numbers of liveried and stabled horses. A considerable network of businesses are supported by such a high equine population, and in addition to financial value within the local community there is considerable benefit in terms of health and wellbeing of individuals. It is suggested that Policy S24: Countryside, could recognise this specifically.


S27: Flood Risk Management
Supporting text paragraph 5.54, requested amendments underlined - as a consequence of the rise in sea levels and storm surges, parts of the plan area will be at increased risk from coastal erosion, groundwater, fluvial and/or tidal flooding. Hard defences may not be possible to maintain in the long term, therefore development needs to be strongly restricted in areas at risk to flooding and erosion, whilst ensuring that existing towns and villages are protected by sustainable means that make space for water in suitable areas. Development must take account of the policies of the relevant shoreline management plan

Supporting text paragraph 5.58, requested amendments underlined - Built development can lead to increased surface water run-off; therefore new
development is encouraged to incorporate mitigation techniques in its design, such as permeable surfaces and Sustainable Drainage Systems (SuDS). Where appropriate, SuDS should be used as part of the linked green infrastructure network to provide multiple functions and benefits to landscape quality, recreation and biodiversity. This can be achieved through habitat creation, new open spaces and good design. SuDS should be designed to help cope with intense rainfall events and to overcome any deterioration in water quality status. In determining the suitability of SuDS for individual development sites, developers should refer to guidance published by the Lead Local Flood Authority (LLFA): West Sussex LLFA Policy for the Management of Surface Water: https://www.westsussex.gov.uk/media/12230/ws_llfa_policy_for_management_of_surface_water.pdf and, if necessary, seek further advice from the Lead Local Flood Authority LLFA.

S27 policy text requested amendments underlined for section 1 - a. through a sequential approach, taking into consideration all forms of flooding, it is located in the lowest appropriate flood risk location in accordance with the NPPF and the Chichester Strategic Flood Risk Assessment (SFRA); and

S27 policy text requested amendments underlined for section 2. Sustainable drainage systems (SuDS) will be required on major developments (10 or more dwellings or equivalent) and encouraged for smaller schemes. SUDS should be designed into the landscape of all new development and should be included as part of a District wide approach to improve water quality and provide flood mitigation. A site-specific Flood Risk Assessment will be required for sites within or adjacent to areas at risk of surface water flooding as identified in the SFRA. There should be no increase in either the volume or rate of surface water runoff leaving the site.

S27 policy text requested additional bullet point as number 4 - Clear management arrangements and funding for their ongoing maintenance over the lifetime of the development should be proposed. Planning conditions and / or obligations will be used to secure these arrangements.

S27 policy text requested amendments underlined for section 2, but would be section 5 - Development should not result in any property or highway, on or off site, being at greater risk of flooding than the 1 in 100 year storm return period, including an allowance for climate change.


Policy S29: Green Infrastructure
The Green Infrastructure policy is welcomed, including provision of new Green Infrastructure as an integral part of the development at Strategic Development Locations. It is recommended that measures are put in place to secure the long term management of such Green Infrastructure.


Policy S30: Strategic Wildlife Corridors
The identification of Strategic Wildlife Corridors and inclusion of a policy to safeguard them from development is welcomed. It is recommended that CDC promotes positive conservation management within these corridors to maximise their contribution to maintaining and enhancing biodiversity. As stated in Section 5.66, 'These corridors do not stop at the plan area boundaries.' Thus, it is recommended that CDC works in partnership with Chichester Harbour Conservancy and The South Downs National Park Authority to ensure that these Strategic Wildlife Corridors continue to provide effective corridors and connectivity across the wider landscape.

Section 5.66 refers to four Strategic Wildlife Corridors connecting Chichester Harbour with the South Downs National Park but it is noted that there is no mention of the Strategic Wildlife Corridors to the east of Chichester which connect Pagham Harbour with the South Downs National Park (as seen in Policy Map S30b). It is also noted that the maps referred to in Section 5.66, Maps 5.1 & 5.2 are missing.

WSCC and CDC promoted a Mitigated Northern Route for the A27 at Chichester as the preferred option, subject to the inclusion of important mitigation measures that are needed to make the scheme acceptable in environmental terms and the 'full southern route' as a reasonable alternative. Both routes could impact on the identified Strategic Wildlife Corridors. As currently drafted, Policy S30 would seem to prevent a mitigated northern route from coming forward in the future. Therefore, the District Council should consider whether the policy is overly restrictive (for example should it refer to 'significant adverse impacts' or 'unacceptable adverse impacts'?) and how it would be applied if a northern route for A27 were to come forward in the future.


Policy S31: Wastewater Management and Water Quality
S27 policy text requested amendments underlined for section 3, this - Where appropriate, development should contribute to the delivery of identified actions to deliver infiltration reduction across the catchment. Where appropriate development should contribute to the delivery of identified actions to deliver a reduction in the level of infiltration of groundwater into the sewer system.


Policy AL1: Land West of Chichester
AL1 policy text requested additional bullet point as number 8 - Increase capacity to attenuate surface water on site, thereby reducing the discharge flows off the site below current rates and reducing the risk of flooding to residential areas downstream.

AL1 policy text requested additional bullet point under 15 as 15 b- Provide mitigation for any loss of watercourse habitat resulting from culverting for highway provision in the development;

AL1 policy text in supporting 'improved cycle and pedestrian routes linking the site with the city, Fishbourne and the South Downs National Park', a new key link for cycling will be to Salthill Road, thereby enabling cyclists to benefit from the existing bridge crossing of the A27 for journeys to and from the west.


AL2: Land at Shopwyke (Oving Parish)
The policy acknowledges need 'for foot/cycle bridge across A27 to Coach Road'. There is also need for equestrian users to cross the A27 and WSCC PROW has received several enquiries seeking support for such infrastructure. Consideration could be given to the proposed bridge providing for all three modes.


AL3: East of Chichester (Oving Parish)
AL3 supporting text requested amendments underlined for paragraph 6.22 - The site is identified for 600 dwellings, however, there may be potential to deliver a large strategic development of 1000 dwellings, subject to further evidence, including the testing of additional growth on the local highway network and capacity of the site to provide flood risk attenuation for the increased housing density. The site should be master planned as a whole, and delivered through a phased development over a ten year period. Although the site is physically separated from the city by the A27 Chichester Bypass, the development should form a planned extension to the city, forming a new neighbourhood. This will involve opportunities to provide new facilities to serve the wider local community with good off-site access, particularly by walking and cycling to existing local facilities and facilities in the city.

AL3 policy requires exploring integrated green infrastructure with other strategic sites to the north east of the city, Tangmere and the wider countryside. It is considered that future residents will have expectations for provision of safe and convenient links towards Oving and also across the railway to link to the A259 cycle path and PROW south of the A259. It is considered that the policy should be strengthened to ensure such provision.


Policy AL4: Land at Westhampnett/North East Chichester
AL4 policy text requested amendments underlined for section 3 - Open space and green infrastructure, including a linear greenspace with public access along the Lavant Valley.

Taking into account the site-specific requirements, proposals for the site should satisfy the following requirements:

Policy AL4 policy, it is welcomed that 'provision should be made for green links to the South Downs National Park and Chichester City.' Safe and convenient walking and cycling to Lavant, from where people will access the South Downs, will provide for sustainable transport use.


Policy AL5 Southern Gateway
AL5 supporting text requested amendments underlined for paragraph 6.38 - The area has been identified as suitable for comprehensive regeneration with the aim being to make it a more attractive and welcoming gateway for the city, providing new housing, business and retail space and leisure and tourism facilities. Opportunities will be identified to improve transport links with a focus on cycling, walking and public transport and the removal of non-essential traffic from the area. There is also scope for significant public space enhancements and new landscaping incorporating blue / green infrastructure delivering multi-functional benefits.

AL5 policy text requested amendments underlined for section 5 - Provision of open space that:
* Is in accordance with Policy DM34, including retention of the existing playing pitch unless suitable re-provision is provided;
* Reinforces / enhances green and blue infrastructure consistent with Policy S29 and fully exploits the opportunities for sustainable drainage.


AL5 policy text requested amendments underlined for section 8 - Provision of both a surface and waste water management plan which demonstrates no net increase in flow to Apuldram Waste Water Treatment Works would result from this development, unless suitable alternative provision is agreed;


Policy AL6: Land South-West of Chichester (Apuldram and Donnington Parishes)
The LLFA has concerns regarding the lack of reference to flood risk constraints of the site in Policy AL6. There is reference to flood risk in paragraph 6.47. However, the policy itself makes no reference to these constraints.
The constraints arise from a combination of the following:

* Current tidal /fluvial flood risk extending from Chichester harbour to the west and up the River Lavant floodplain; (Map 1)
* Future tidal /fluvial flood risk associated with climate change; (Map 1)
* Constraints on infiltration of surface water run off because of high seasonal groundwater levels (<0.025m below the surface) (Map 2); and
* Constraints on gravity outfalls because of the low relief and long-term reduction in tidal window for discharge.

The above limits the options for how the site can be effectively drained without a step change from typically employed methods to embrace more innovative and currently expensive options e.g. blue roofs and rainwater harvesting.

The LLFA recommends that the policy sets out both the above constraints and the type of innovative drainage that will be required to achieve the development objectives for the site.



Key: Projected medium projection extent of SLR based upon 4m contour

AL6 extent

Current Flood Zone 3 extent.

Current Areas of high (1:30) surface water flood risk

Map 1 Existing and projected Tidal and surface water flood risk for AL6.

Consistent with paragraph 3.2 of the SFRA, given the high risk of flooding both now and into the future for this site, it is recommended that CDC gives consideration to the climate change maps to understand how the flood zones are predicted to change over the lifetime of the development.


Key:
AL6 boundary.

Groundwater levels are either at very near (within 0.025m of) the ground surface.

Groundwater levels are between 0.025m and 0.5m below the ground surface

Map 2 Groundwater flood risk JBA

Policy AL6 WSCC PROW considers 'necessary highway improvements to adequately mitigate the likely impacts on the highway network' to include a bridge crossing of the A27 for convenient walking and cycling access to the Terminus Road industrial estate and the city. There is an existing public footpath but, as this crosses the A27 at-grade, this will not provide the safest facility and not encourage people to minimise use of vehicles for local access. Provision of a bridge and access through the site could also establish a valuable link to the popular Salterns Way walking and cycle path. An additional link to Salterns Way should also be provided off the A286 for the benefit of Stockbridge residents as a safer alternative to the A286.


AL 7 Highgrove Farm, Bosham
The LLFA notes that the above site has the potential for a moderate risk of groundwater flooding. It is likely that this is perched groundwater draining from higher ground / springs to the north that lies in the superficial mixed sediments underlain by Lambeth Clay.


Policy AL8: East Wittering Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'Opportunities ... for the expansion and provision of green infrastructure into the wider countryside including between settlements and facilities'. Existing and future residents and the local visitor economy would benefit by delivery of an off-road route for walkers, cyclists and horse riders to and from the Medmerry development and towards Selsey. It is considered that Policy AL8 should aim to deliver this enhancement specifically.


Policy AL9: Fishbourne Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

It is considered that off-road cycling links to land West of Chichester (off Salthill Road) and to Bosham (off Park Lane) would benefit this community with enhanced sustainable connectivity.


Policy AL10: Chidham and Hambrook Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'opportunities' to develop green infrastructure and links to other communities. An opportunity, in conjunction with Highways England, exists to maximise the value of existing infrastructure by creating a new bridleway (for walkers, cyclists and horse riders) on a path using an existing A27 overbridge.


Policy AL11: Hunston Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The village is already well connected for walkers to access the surrounding countryside but there are presently no local cycling or horse riding facilities on the PROW network. A bridleway link to South Mundham (with the potential for future cycle links to Pagham and towards Bognor Regis) and to Sidlesham via the golf course and Brimfast Lane would provide residents and visitors with improved access to the countryside and services.


Policy AL12: Land North of Park Farm, Selsey
It is unclear why the policy map shows the proposed strategic allocation lies outside of the Neighbourhood Plan proposed settlement boundary. Some explanation for this anomaly would be helpful in the text.


Groundwater flood risk as depicted by JBA mapping (Brown = seasonal groundwater level lies between 0.025 and 0.5m below the surface).

The principle concern that the LLFA wishes to highlight is the need to ensure that the necessary foul sewerage infrastructure to support development is in place. It is the LLFA understanding that the Siddlesham WWTW experiences capacity issues currently, in part exacerbated by groundwater infiltration. While Policy AL12 states: Development proposals will need to demonstrate that sufficient capacity will be available within the sewer network, including waste water treatment works, to accommodate the proposed development in accordance with Policy S31.

The policy proposes only to provide 'pedestrian links between the site and new development south of Park Lane'. It is considered that cycling links should also be provided.


Policy DM8: Transport, Accessibility and Parking
The PROW network can provide vital means for communities to interact and encourage sustainable local access. The policy requirement to create 'links between new development and existing pedestrian, cycle and public transport networks' is welcomed. However, establishing links into surrounding existing development should not be overlooked also - the greater the permeability, the greater the use.


Policy DM10: New Employment Sites
Whilst mentioned earlier in the Plan in respect of a number of specific sites, this policy should specifically aim to provide, as a matter of course, suitable walking and cycling infrastructure to encourage local sustainable access. This infrastructure may need to extend outside a site boundary so as to provide safe and convenient connection to existing infrastructure. This principle should apply also to Policy DM13: Built Tourist and Leisure Development and Policy DM14: Caravan and Camping Sites.


Policy DM32: Green Infrastructure
Whilst it is recognised the policy proposes support subject to not 'dissect[ing] ... the linear network of cycle ways, public rights of way, bridleways ...', the policy could lend support to establishing new routes as part of the Green Infrastructure network itself.


Policy DM35: Equestrian Development
It is appreciated why the Plan would wish to require future equine development to be 'well related to or has improved links to the existing bridleway network'. However, this will add to the pressure of use on the existing bridleway network, which is not extensive outside of the South Downs, so will increase degradation of paths. Future developments must, therefore, accept to contribute in some way, acceptable to the local highway authority, to mitigate the additional impact to be created so all lawful users are not disadvantaged.


Policy DM29: Biodiversity
The measures to safeguard and enhance the biodiversity value of development sites are welcomed, including seeking net biodiversity gain.


Schedule of proposed changes to the policies map
S30a West of City Corridors -suggest title should be West of City Strategic Wildlife Corridors (to match S30b: East of City Strategic Wildlife Corridors. The Strategic Wildlife Corridors are depicted in different colour patterns on the two plans which is somewhat confusing.


Strategic Wildlife Corridors Local Plan Review Background Paper
Proposed Hermitage to Westbourne Strategic Wildlife Corridor
A large area depicted as Biodiversity Opportunity Area (BOA) in Fig. 1 (immediately to the south of the Rivers Ems & Meadows Local Wildlife Site, Westbourne) is in fact housing and forms part of the settlement of Westbourne. You should consider if this land should be included as having potential for biodiversity enhancement.


Glossary
Includes Sites of Nature Conservation Importance (SNCIs) but not Local Wildlife Sites (LWSs). SNCIs are now known as LWSs.

Attachments:

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2194

Received: 07/02/2019

Respondent: Environment Agency

Representation Summary:

Overall we support the policy. We would recommend that paragraph 3 be amended to include reference to flood risk management infrastructure.

Full text:

Thank you for the consultation on the above document. We have reviewed the document and have the following comments to make in response.

Summary
Overall we are pleased to see that the Plan provides a framework to ensure that new
development will take place in a considered manner to address environmental constraints as well as provide policy hooks for the delivery of environmental enhancements. However, to ensure that the Plan is as effective as possible and meets necessary policy and legislative requirements we have made some recommendations for improvements. These are set out in detail below. Where we support a policy we have also highlighted this below.

We have highlighted concerns with policy AL6 - Land SW of Chichester and have made recommendations for more significant changes to policies in relation to flood risk management (both strategic and development management) and wastewater management and water quality.

As a general comment we note that a significant proportion of the housing numbers
proposed through the Local Plan will be delivered by Neighbourhood Plans. We have
highlighted key criteria for individual locations that we would wish to see considered by those Plans when allocating sites. Where possible we would wish to see these included within the Local Plan policy but as you will be aware we have produced a checklist for Neighbourhood Plan groups in your District which will guide the identification of sites and other key issues and opportunities to be addressed in their Plans.
We would be happy to meet with you to discuss further any of our comments and support the rewording of the policies prior to the production of a pre-submission Plan.

Specific comments

Strategic policies
Policy S12 - Infrastructure
Overall we support the policy. We would recommend that paragraph 3 be amended to
include reference to flood risk management infrastructure.

Policy S17 - Thorney Island
We are currently exploring opportunities for habitat creation in an area on Thorney Island. This is part of our Habitat Creation Programme which seeks to create new habitat to offset losses elsewhere as a result of sea level rise and implementation of coastal and flood risk management infrastructure.
Whilst the policy as drafted, along with other policies in the Plan, would not restrict this opportunity we would like you to consider whether further wording could be included to provide specific support for habitat creation.

Policy S18 - Integrated Coastal Zone Management
We support the continued inclusion of this policy and the specific references to key Plans.
We also support the intention that financial contributions should be sought to deliver both flood risk management infrastructure as well as improvements to the quality of watercourses in the area.

Policy S20 - Design
We support the specific requirements of this policy in point 5 and 8 with regard to green infrastructure and enhancing biodiversity and climate change resilience.

Policy S23 - Transport and Accessibility
The policy includes a new road connecting Birdham Road to the A27 Fishbourne
roundabout. The site includes areas within flood zones 2 and 3 and will cross a number of watercourse. It is essential that the requirements of the NPPF paras 157-8 are satisfied prior to the allocation. We have made detailed comments on this in relation to policy AL6 - Land South West of Chichester.

Policy S25 - The Coast
We are pleased to see the support in this policy for future habitat creation as well as the delivery of flood defences and adaptation to climate change. This supports principles of net environmental gain advocated through the NPPF and the 25 Year Environmental Plan as well as providing necessary policy hooks to support our future plans through our Habitat Creation Programme.
As we highlighted through the Issues and Options consultation this Programme was set up to deliver the compensatory habitat required to address the losses in habitat that would take place as a result of the flood and coastal risk management measures identified in the Shoreline Management Plans. There are specific locations within Chichester District which offer opportunities to provide saltmarsh and coastal grazing marsh in the medium to longer term. These locations include areas in Fishbourne, Chidham and Hambrook and on Thorney Island.

Policy S26 - Natural Environment
We would recommend that the policy wording be extended to say "protect and enhance biodiversity". This is consistent with the NPPF requirements in para 170 regarding net gain and current Government proposals to mandate biodiversity net gain for all new developments.

Policy S27 - Flood Risk Management
We support the intention of the policy, however, we would wish to see changes made to ensure the policy is as clear as possible. We would also recommend you consider what a strategic policy on flood risk management is seeking to achieve in addition to the development management policy. As drafted there are some duplications and/or inconsistencies between the two policies.
It may be more prudent to have a shorter overarching policy that seeks to ensure that flood risk will be taken account of at all stages in the planning process in order to avoid inappropriate development in areas at current or future risk (taking into account climate change) and to direct development away from areas of highest risk. Reference could and should be made to the Strategic Flood Risk Assessment to enable this. We would also support a requirement here for development to seek to achieve a reduction in flood risk for existing communities on and off site.
The principle of point 3 is supported but again should be considered whether it sits best within the development management policy.
We would recommend removing point 4. It is not clear entirely what the rationale behind this is but as drafted it suggests that development within areas with a certain level of flood risk would be approved. This should only be the case when the sequential and exception test have been satisfied in accordance with the NPPF paragraph 157- 8. I would be happy to discuss this further if the intention behind the statement is different.

Policy S29 - Green Infrastructure
We support the policy and are pleased to see specific reference to "blue" infrastructure.

Policy S30 - Strategic Wildlife Corridors
We are supportive of this policy and believe it provides a strong framework for the protection and enhancement of biodiversity within the Plan Area. In particular we support the corridors along watercourses and the links with Biodiversity Opportunity Areas.
As previously highlighted in our Issues and Options response to the Local Plan the
Environment Agency are looking to deliver more natural flood management (NFM) measures to complement and support traditionally engineered flood defenses. This is about working with natural processes in whole catchments and has the potential to help us manage and reduce flood risk in a more efficient, cost effective and sustainable way whilst securing wider environmental benefits. We would be interested to discuss whether the Strategic Wildlife Corridors Background Paper could be expanded upon to consider these opportunities.
A nationally consistent set of opportunity maps to indicate potential for natural flood
management have been produced and I have attached a briefing not which shows how you can access this screening information. The identification and safeguarding of wildlife corridors could support our further work on NFM in the Chichester District and we would welcome the opportunity to discuss this further. In particular we would be interested to discuss whether the Strategic Wildlife Corridors Background Paper could be expanded upon to consider these opportunities.

Policy S31 - Wastewater Management and Water Quality
We support the intention of this policy, however, we recommend that the policy is amended to ensure that specific issues associated with the Apuldram WwTW catchment are addressed and that wider opportunities for the necessary protection and enhancements of water quality in the catchments across the Plan area are taken forward through development. As drafted the supporting text to the policy talks primarily around wastewater treatment capacity and impacts on water quality. However, we would recommend that this is expanded to discuss wider water quality and water resources issues within the Plan area.
This should include reference to the Water Framework Directive and the South East River Basin Management Plan, for which the Council has an obligation to support their delivery.
We would wish to see the Plan include a policy that will ensure that the design and location of development will both protect and enhance water bodies, both surface and groundwater.
We are aware of a few adopted policies regarding water quality that you may wish to review ahead of the further iteration of your Plan. These include policy W DM1 - Water supply and quality in the Arun Local Plan and Policy 31 - Integrated Water Management and the water cycle in the Cambridge Local Plan. The Policy in the Arun Local Plan is subdivided in to 3 sections to cover issues of water supply, water quality and catchment specific measures.
This approach or layout may be useful for you to consider here.
You may also wish to consider whether there are elements of this policy that would be better situated in a development management policy to direct decision making on individual sites.
I would be happy to work with you further to develop this policy, however, to support this the following identifies some key wording that could be included:
"All new development must demonstrate:
* That it has no adverse impact on the quality of water bodies and groundwater, or will prevent future attainment of good status;
* That development contributes positively to the water environment and its ecology and does not adversely affect surface and ground water quality"
This will reflect that impacts on water quality will not solely relate to wastewater infrastructure but can include diffuse pollution as well as physical changes to watercourses.
With regard to the specific requirements for the Apuldram WwTW the policy as drafted broadly reflects the current adopted Plan policy. Would there be an opportunity here for the policy to reflect elements of the recently endorsed Position Statement between the Environment Agency and Southern Water in terms of managing development in the catchment?
The policy makes reference to the higher building regulations standard of 110 l per person per day. We support this standard but would recommend you consider whether this detail is needed in this strategic policy as well as development management policy DM16 - Sustainable Design and Construction.

Site Allocations
Please note we have no additional comments to make on the sites that are being taken forward from the current adopted Local Plan as we consider that the key policy criteria we sought at that stage has been transposed across. We continue to support these requirements.

Policy S32 - Design Strategies for Strategic and Major Development Proposals
We support this policy and specifically requirements for issues such as green infrastructure and SuDS to be fully considered through a Masterplan. Without this overarching vision for larger sites it is often difficult to provide a comprehensive scheme to address key environmental constraints and opportunities.

Policy AL13 - Land East of Chichester
There is a small area within the site located in Flood Zone 2, along with an additional surface water body (lake). We would recommend that the masterplan for this site fully considers these constraints in designing the site including the adopting the sequential approach. We would wish to see built development located solely within Flood Zone 1.

Policy AL 5 - Southern Gateway
We have previously made comments on the proposals for the Southern Gateway through the adopted masterplan for the site. As highlighted there are a number of constraints to development in this area, however, we are pleased to see specific criteria in the policy toensure that these key constraints to the site within our remit are fully considered.
These are:
- Bullet 8 which requires the provision of a wastewater management plan which
demonstrates no net increase in flow to the Apuldram WwTW. This is in line with the
Surface Water and Foul Drainage SPD and the Position Statement on managing new
housing development in the Apuldram (Chichester) Wastewater Treatment Works
Catchment agreed between the Environment Agency and Southern Water.
- Bullet 10 which sets out the requirement for a Flood Risk Assessment to address the
specific flood risk issues on the site. We would recommend that this policy criteria
could be expanded upon to require the sequential approach within the site and to
ensure that more vulnerable uses such as housing be located in the lowest areas of
flood risk.

Policy AL6 - Land SW of Chichester
At this stage we do not support the inclusion of this site within the Plan.
The allocation is composed of housing, employment and a road scheme. Large areas of the allocation falls within flood zones 2 and 3 and we would wish to see further evidence to support this allocation. This may be as part of a Level 2 Strategic Flood Risk Assessment for this site which would then inform a Sequential and if necessary an Exceptions Test. The assessment would need to consider how the proposals could be delivered and identify any mitigation and/or compensation measures that may be necessary to ensure that the development is safe and that there is no increase in flood risk to third parties.
Whilst we note that there are areas outside of the flood plain within the allocation and that some of the development could avoid these areas it is anticipated that the road would cross the flood plain and therefore further detailed understanding of this risk and how it would be managed should be provided.
As drafted the policy makes no reference to flood risk and we would wish to see this
amended.
With regard to housing development we would wish to ensure that all development be located in Flood Zone 1 and that the policy criteria would reflect this.
Other issues include the crossing of watercourses and impacts on biodiversity and water quality. This should be referenced within the policy criteria with requirements for any watercourse crossings to be clear span in design. This will ensure that flood water conveyance is not impeded and protect the habitat associated with those watercourses.
In addition to flood risk we also have concerns with regard to where the sites wastewater would drain to. In line with our Position Statement on managing new housing development in Apuldram (Chichester) Wastewater Treatment Works Catchment allocations within the Local Plan should not drain to the Apuldram WwTW but be directed to alternative WwTW catchments, notably Tangmere WwTW via the new sewer pipeline connection once operational.
It is difficult to understand how this site would connect to an alternative WwTW and therefore would question whether the site would be deliverable.

Policy AL9 - Fishbourne
Fishbourne parish falls within the Apuldram WwTW catchment and we would recommend that the policy makes specific reference to the issues that the Neighbourhood Plan group should consider when identifying sites for their Local Plan.
We would also recommend that specific reference is made to the Source Protection Zone that covers part of the parish in order to ensure that the groundwater, and in turn the drinkingwater supply, is protected.

Policy AL11 - Hunston
There are parts of Hunston that fall within flood zones 2 and 3. We would recommend that if possible the policy makes reference to the fact that built development should be located solely in Flood Zone 1. If this is not possible some reference would need to be made to flood risk and the requirement for the Neighbourhood Plan group to fully consider this through their site allocation process. If sites were to be allocated in flood zone 2 or 3 it is likely that the Plan would need to be supported by a Level 2 SFRA or equivalent.

Policy AL13 - Southbourne Parish
Point 16 identifies the need to ensure that sufficient capacity is available at the relevant Wastewater Treatment Works prior to the delivery of development. This could be expanded to include sewer network capacity. Liaison with Southern Water regarding any necessary phasing of development would be encouraged.

Development Management Policies

Policy DM5 - Accommodation for GTTTS
We support the specific criteria in this policy to ensure that GTTS sites are not located in areas at risk of flooding.

Policy DM14 - Caravan and Camping Sites
We support the particular reference to restricting the occupancy of these sites in flood risk areas. However, there is no specific mention that flood risk areas should be avoided where possible. We would recommend that this should be included within the policy criteria.

Policy DM15 - Horticultural Development
We are pleased to see specific reference to the need to demonstrate adequate water
resources are available and/or water efficiency measures.

Policy DM16 - Sustainable Design and Construction
We support the requirement for new development to achieve a water usage of a maximum of 110litres per head per day.
For completeness we recommend that point 5 should be expanded to include compensation as well as make reference to net gain. This is in line with NPPF para 170.
We support the requirement in point 8 with regard to measures to adapt to climate change.

Policy DM18 - Flood Risk and Water Management
para. 7.115 - reference to the Environment Agency should be removed from this sentence.
The responsibility for surface water drainage and consideration of SuDS sits with West Sussex County Council as the Lead Local Flood Authority for this area.
para. 7.116 - vulnerability - it should be noted that not all development types would be appropriate in all flood zones. Basement dwellings would not be supported in flood zone 3. This paragraph should be amended to reflect this.
We would recommend that you review this policy alongside the strategic policy on flood risk to ensure that they are complementary. Whilst the intention of the policy is good some further clarity could be provided to ensure that all sources of flood risk are considered through decision making.
As drafted there is no reference to the Sequential Test which is a key step in decision
making with regard to proposals in a flood zone. It appears that a number of the criteria included in policy 42 of the current adopted Local Plan have been stripped out. We would recommend further consideration of this for the next iteration of the Plan.
We note that the policy also makes reference to wider water management and does refer tothe South East River Basin Management Plan, however, as per our comments on policy S31 we would wish to see a specific policy that provides for the protection and enhancement of water quality. It may be prudent to consider whether an overarching strategic policy to address flood risk and water management would be best with separate detailed development management policies for each topic.
We would be happy to work with you regarding this detail.

Policy DM20 - Development around the coast
We support this policy and the requirement to safeguard a strip of land behind existing or proposed sea defence or coastal works. Please note that the Environment Agency would seek a 16 metre buffer behind any of our tidal defences.
We support the specific requirement to ensure that development for boat or marine use would not be detrimental to water quality.

Policy DM24 - Air Quality
We are pleased to see that this policy recognises that new development may be located near to existing uses that may be potentially polluting to housing. It is important that the onus should be on the developer/applicant to manage any impact to ensure that they don't leave the existing user affected, e.g. by complaints.

Policy DM26 - Contaminated Land
We support this policy as drafted.

Policy DM29 - Biodiversity
We support this policy as drafted and are pleased to see that specific reference has been
provided to ensure that net gain in biodiversity is actively pursued. Consideration should be
given to the current Government consultation on mandating biodiversity net gain in all new
development and whether this may require further strengthening of the policy wording.
Policy DM32 - Green Infrastructure
We support policy.

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2297

Received: 07/02/2019

Respondent: Portsmouth Water Ltd

Representation Summary:

PW agree that the siting and timing of development can assist with the economic provision of water resource infrastructure. It also states that safeguarding existing infrastructure, such as water mains and aquifers, is important. Portsmouth Water would urge developers to check for existing infrastructure and for source protection zones that may limit development options.
Water infrastructure is not funded through CIL but a separate 'Infrastructure Charge' payable for each individual house. This is designed to pay for all off-site water infrastructure such as mains reinforcements, service reservoirs and supply. Development to an agreed program will help this system work effectively.

Full text:

Spatial Vision
Portsmouth Water note that there are significant additional housing allocations to the west of Chichester and on the coastal strip. These sites will need to be assessed for water supply and funding included in the Infrastructure Charging scheme. (See Map 4.1 Key Diagram)

It is not clear what water storage capacity is being referred to in Section 3.19. Portsmouth Water will review the provision of Service Reservoirs, for day to day use, and has re-started development of a large raw water storage reservoir at Havant Thicket. The reservoir, when combined with Portsmouth Water's existing sources and enhancements to its groundwater sources, would create sufficient
surplus to support an additional flexible daily transfer of treated water from Portsmouth Water are to Southern Water without detriment to Portsmouth Water's resilience.

Southern Water requires this transfer to help meet a significant deficit in its Southampton East, Southampton West and Isle of Wight resource zones. This deficit arose after Southern Water agreed to reduce its abstraction licences on the Rivers Test and River Itchen at a public inquiry in March 2018, to help protect the environment.

It is not clear that the water demands of the Horticultural Development Areas have been assessed. It is possible that these businesses will rely on rainwater harvesting and storage but changes in licencing regulations mean that 'Trickle Irrigation' is no longer exempt from abstraction licencing.

Groundwater abstraction in the coastal plain will require an impact assessment under the Habitats Regulations. (Section 4.75)

Spatial Strategy

Policy S12 sets out how development can make effective use of existing infrastructure. Portsmouth Water agree that the siting and timing of development can assist with the economic provision of water resource infrastructure. It also states that safeguarding existing infrastructure, such as water mains and aquifers, is important. Portsmouth Water would urge developers to check for existing infrastructure and for source protection zones that may limit development options.
Water infrastructure is not funded through CIL but a separate 'Infrastructure Charge' payable for each individual house. This is designed to pay for all off-site water infrastructure such as mains reinforcements, service reservoirs and supply. Development to an agreed program will help this system work effectively.

Strategic Policies

Policy S27 'Flood Risk Management' refers to Sustainable Drainage Systems (SuDS) and the need to control surface water run-off. It should also refer to aquifer protection and the need for caution when using infiltration systems especially deep bore systems. This applies particularly when the site is in, or close to, a source protection zone.

Policy S31 'Wastewater Management and Water Quality' refers to higher standards in the Building Regulations for water consumption to reduce pollution in the harbours. Portsmouth Waters 'Water Resources Management Plan' is based on lower per capita consumption and we have an aspiration for all customer to reach 100 litres/head/day by 2050. This is no substitute for reducing overall flows
to sewage treatment works by the control of groundwater infiltration and surface water drainage.

Strategic Site Allocations

Policy AL1 'West of Chichester' does not mention water supply so we assume that the site has reverted to a conventional system with sewerage pumped to Tangmere WWTW and water supplied by us. Portsmouth Water has provided provisional designs for this system and there are no existing large diameter water mains on the site. Costs for reinforcement of the water mains will be recovered by the new Infrastructure Charge and on site mains are likely to be provided by a third
party. Information on how reinforcement of the water mains is recovered by the Infrastructure Charge can be found in Portsmouth Water's Developer Charging Arrangements on our website under https://www.portsmouthwater.co.uk/developers/.

Policy AL2 'Shopwyke' is already under construction and has a conventional water supply system with all elements provided by us. Costs are being recovered via the Infrastructure Charge and on-site charges.

Policy AL3 'East of Chichester' is a new strategic site and there are no large diameter mains crossing it. This is an old landfill and may contain material that can damage plastic pipes. On site mains may need to be protected or be more expensive to ensure water quality is maintained.

Policy AL4 'Westhampnett' Phase 1 is already under construction and account has been taken of the large diameter main that crosses the site. Phase 2 is an extension of the existing Greylingwell site but it is not clear if this has been allowed for in the design of this 'Inset Appointment'. Portsmouth Water do not own the mains and there may be a single point of supply.

Policy AL5 'Southern Gateway' is an inner city development with a good water supply system. The reference to the 'efficient use of water' is confusing because many of the other strategic development sites also drain to Apuldram WWTW. All sites need to be water efficient but not follow the example of the 'Code for Sustainable Homes'. Sites were developed in Chichester that used rainwater harvesting to meet the Code objectives but were able to use higher water use fittings such as power showers. This led to properties producing more sewage than equivalent water efficient homes. This did not achieve the objective at Apuldram. An alternative provision might be to reduce infiltration but it is not clear how this would be funded or who would carry out the work.

Policy AL6 'South West Chichester' is crossed by a large diameter main that will have to be reflected in the road layout or diverted. The proposed link road may offer an alternative route for the main.

Policy AL7 'Bosham' is situated on the old A27 and there are no large diameter mains in the area.

Policy AL8 'East Wittering' is at the extremity of the distribution system and may be expensive to supply.

Policy AL9 'Fishbourne' allocation is not site specific and it is difficult to comment on the feasibility of water supply. Any off site costs will be recovered via the new Infrastructure Charge. Portsmouth Water have public water supply abstractions in the area and development is likely to be located in a source protection zone for our Fishbourne public water supply abstraction. Under this policy, where development is in a source protection zone, the policy should also refer to groundwater quality
protection and the additional requirements when using infiltration systems in particular deep bore systems. Further guidance on Portsmouth Water's preferred approach to development relating to groundwater quality within our catchments can be found within 'Portsmouth Water's Groundwater Protection Guidance notes' which are attached to this response and also available to view on our website under https://www.portsmouthwater.co.uk/developers/groundwater-protection/.

Policy AL10 'Chidham and Hambrook' is a large site and may need to be considered in combination with 'Southbourne' and 'Bosham'. There are no large diameter mains in the area and mains reinforcements may be required.

Policy AL11 'Hunston' allocation is not site specific.

Policy A12 'Selsey' is at the extremity of the distribution system and has seen previous housing growth. Reinforcement of the water mains may need to be provided.

Policy AL13 'Southbourne' is supplied from a different distribution system to Chichester. This is a very large housing allocation and this may need to be considered in combination with 'Hambrook' and 'Bosham'. There are sufficient water resources for all the housing allocated to Portsmouth Water's area of supply. It is the location of the housing site in relation to existing trunk mains and
service reservoirs that determines the cost to supply. Local reinforcement of the water mains may be required.

Policy AL14 'Tangmere' housing allocation has increased by 30% and we may need to repeat the modelling that has already been done. There is also uncertainty about the water supply to the HDA which seems to rely on rainwater harvesting for future growth. The housing development and the HDA could have an impact on our source protection zone. Under this policy, where development is in a source protection zone, the policy should also refer to groundwater quality protection and the
additional requirements when using infiltration systems in particular deep bore systems. Guidance should be sought from Portsmouth Water's Groundwater Protection Guidance for development.

Policy AL15 'Land at Chichester Business Park, Tangmere' Portsmouth Water have public water supply abstractions in the area and the site allocation is likely to be within a source protection zone for our Aldingbourne public water supply abstraction. As above, where development is in a source protection zone, the policy should also refer to groundwater quality protection and the need for caution when using infiltration systems in particular deep bore systems. Please refer to Portsmouth Water's Groundwater Protection Guidance for further information.

Development Management

Policy DM10: 'New Employment Sites' Development proposal should be compatible with other policies in the Plan, in particular DM9 'Existing Employment Sites' to ensure that the development is otherwise acceptable. Policy DM9 states that development should 'not generate unacceptable levels of water pollution' and this should include groundwater pollution. This requirement should also be applied to Policy DM10, especially when the site is in, or close to, a source protection zone.

Policy DM15 'Horticultural Development' Developments at Tangmere HDA have relied on infiltration to dispose of excess surface water. This policy states that development should 'not generate unacceptable levels of water pollution' and this should include groundwater pollution. Portsmouth Water have public water supply abstractions in the area and the potential impacts must be assessed for any SUDS. The EA 'Abstraction Licencing Strategy' (ALS) may give an indication about the
availability of groundwater but it does not cover the derogation of existing supplies.

Policy DM16 'Sustainable Design and Construction' covers the use of Building Regulations to control water use. Portsmouth Water have an aspiration to reduce overall water use to 100 litres/head/day and this policy will help to achieve that aim.

Policy DM18 'Water Management' using SUDS needs to take account groundwater quality and should avoid direct infiltration into the chalk aquifer. This is especially important within the source protection zones.

Policy DM29 'Biodiversity' Portsmouth Water has legal duties to protect and where practical enhance biodiversity and has an active program of work on it's own land. This work is now expanding to include projects on other people's land in association with 'Catchment Management' activities. We would look to CDC for support in areas such as Bosham Stream, Lavant Stream and Fishbourne Stream where schemes could be developed in partnership with local housing developments.

Policy DM35 'Equestrian Development' can have a direct impact on water quality including groundwater quality. Portsmouth Water support the protection of water courses and aquifers.

Appendix 'E' Monitoring Framework

Policy S12 covers the provision of infrastructure but it is not clear how records of completed projects will be collected or stored.

Policy S26 covers biodiversity improvements and Natural England should be consulted on priorities and record keeping.

Policy S31 covers water consumption which is only available for the whole Company area in the WRMP Annual Review.

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2379

Received: 25/01/2019

Respondent: Mr John Newman

Representation Summary:

Support policy S12 in general

Full text:

Introduction
I agree with most of the points made in the Introduction, not least the points about affordable housing, (para 2.9) for which there is a clear demand and inherent because of the 0.75%pa rise in population and the yawning gap between incomes and house prices.
I will acknowledge that I am writing as a baby boomer, but I note the above average presence of senior citizens in the CDC area and your anticipation that it will rise to 35% by 2015 (para 2.8). This surely has implications for the facilities that CDC, and probably more so WSCC because of its responsibilities for social care, will need to provide, and I do not notice any focus on this in your introductory section. In fairness I am slightly more encouraged when I read paragraph 3.19
I would also ask how many of the young people educated in the area return here to live and work after qualifying. And if the number is low, why, and what do you propose to do to ameliorate the haemorrhage?
Spatial Vision and Strategic Objectives
I agree with your list of items in paragraph 3.2. That said, I note that you state that people should be able to "move around safely and conveniently with opportunities to choose alternatives to car travel (my emphasis). This surely has major implications for public transport, for walking, and for cycling, and surely these should be highlighted in this introductory summary. I shall look forward to seeing what you have to say about these later in the document.
I agree with paragraph 3.3 - but what do you mean by your hope to "balance the ageing population"? That could sound horribly ominous!
In para 3.4 I understand the wish to diversify the local economy - but where are these new organisations to go? You talk about "new sustainable neighbourhoods on the eastern, western and southern sides of Chichester, which could, especially when one thinks of Whitehouse Farm, appear to presage a level of growth which will frighten many. I think that the example of Summersdale, where I live, does not bode entirely well, for it is largely devoid of any community centres and has no public transport in the evenings.
In para 3.6 you speak of a "highly accessible transit corridor" Do you really mean this, says he thinking of the state of Chichester by-pass, the queues that I see coming east on to the Fishbourne roundabout in the morning, and the rush-hour queues from Bognor? Perhaps I could add what the all too predictable impact of Whitehouse Farm will be on both the Fishbourne roundabout and the Northgate gyratory.
Re para 3.10, my understanding is that rather more than "moderate levels of growth" are proposed between Fishbourne and Southbourne, and I shudder at the impact on the A259, all the more so when I think of all that traffic passing through the narrow main road at Fishbourne and also coming out on to what is already a very dangerous Fishbourne roundabout, which I do my best to avoid now!
Turning to paragraph 3.19 I welcome, amongst the other points you make there, the references to affordable housing, to air quality, to the section on health and well-being, and (at a time of fears about global warming) to the reference to flood risk.
Spatial Strategy
I welcome the list of services and facilities mentioned in paragraph 4.12, as that most certainly is not the case in present-day Summersdale.
In fairness I recognise the increased demand for housing as mentioned in para 4.22, as this is inherent in an area of rising population and probably more single-person households (which I have not seen mentioned). I suspect, for instance, that I am far from alone in living singly since bereavement in the family house where I have lived for forty years and from which I have no plans to move. That said, enormous care will be needed in selecting the areas for expansion and the implications for infrastructure and community buildings. Moreover you are clearly right in para 4.30 to refer to longer term growth.
You are clearly right to talking of "meeting the housing needs of the plan area and tackling homelessness" in para 4.34. In all honesty I was appalled when I saw the numbers of people sleeping out late a night when I happened to walk home at a late hour last March. I did not think that such an inhuman state of affairs obtained in Chichester, and am horrified that it still apparently does. I strongly agree with paragraphs 4.43 and 4.44. I welcome the policy statement S6, even if I think that we really need is a return to council house building, as was used to solve even worse problems in the decades after 1945.
Re para 4.66 I have very mixed feelings. It has pleased me not to see the extent of boarded up properties that one sees elsewhere. That said:-
* I write as one who detests shopping and does very little within Chichester city centre; I probably use only about half a dozen shops and those only occasionally.
* I know that my wife always preferred to go to Worthing and can think of a friend who prefers Southampton.
* I think that you have to recognise as a fact of life that more people are going to shop on-line, not least for reasons of price, and that that inherently impacts on traditional retail shopping.
* I tend to do my shopping on the edge of town as that is where the big supermarkets are and parking is easy. I would take some persuasion to change that.
* Looking at policy S9, do you really need more shipping in the Southern Gateway at a time of decline of town centre retail shopping?
Providing Supporting Infrastructure and Services
Paragraph 4.80 should also include cycle tracks and bus routes if you really want to move away from the use of private cars.
I note that paragraph 4.81 includes a reference to "appropriate revenue support". I fully agree and wish that I could believe that this present austerity-obsessed government would actually provide it.
Your policy S12 seems right to me.
East-West Corridor
I think that you are somewhat optimistic in paragraph 4.88. The 700 bus service is very good, but what about other routes, especially in the evening? The present state of the Chichester by-pass is dreadful, and the Fishbourne roundabout is a particular source of danger, moreover one likely to be made worse by more traffic coming from Whitehouse Farm and from further development along the A259.
Policy S13 seems fine to me.
Paragraphs 4.95-98 describe a situation that I know only too well. I would add that as a cyclist I find the western end of The Hornet and St Pancras to be by far the most dangerous pieces of road in Chichester, and I write as one who usually does not mind where he cycles.
I do not agree with paragraph 4.101 - I think that a park and ride is badly needed, arguably from both the west and the south.
Re policy S.14:-
* Re peripheral car parks, if you want to revive the city centre, is that really the answer? What about those who find walking difficult or who do not want to carry heavy shopping half a mile to their car?
* I shudder what the queues will be like with a bus lane up to the Bognor roundabout.
* I think that the present bus/rail interchange is quite good, though I think that you need safer crossing of the road and seats in the bus station
* I do not notice any statement about solving the problems caused by the level crossings by Chichester Station. Having had to wait there for over five minutes yesterday while a train was sitting in Chichester Station I feel bound to ask whether there cannot be some mechanism to bring the gates down just before a train is due to leave, and when you are going to have either a bridge or an underpass there.
Re paragraphs 4.103-105, wshat consideration has been given to the transport consequences of such development, especially given the absurd decision to remove the Oving lights?
Given that I live in Maplehurst road, you will not be surprised that I have noted policy S15. Essentially I welcome this policy, not least, as having some pretentions to being a musician, I am very aware of noise, and the weekends where un-silenced racing is allowed are truly a misery, which ideally would be stopped as unbelievably selfish and insensitive and at very least should not be allowed to expand beyond the one such meeting per year. In fairness the banks erected some years ago have made a difference, and for the most part aircraft do behave themselves. I also think that any housing development closer to Goodwood Airfield should be out of the question, as the noise would be intolerable to anyone with normal hearing. In policy S16, point 2 I think that un-silenced racing should not be allowed despite their loss of amenity, as the consequent noise is not reasonable.
Re paragraphs 4.111-115, what do you think is going to be the impact of 1600 new houses in that area - to amenity and the rural aspect; to the A259; to traffic through Fishbourne; and the already dangerous Fishbourne roundabout? I think that the scale of this development is highly questionable for these reasons.
Strategic Policies
Looking at policy S20, I agree with all the points that you make. I would add:-
* The need for a public transport system that does not stop in the evening, and
* The need for good bicycle access. When I think that at least twice a promised access to Centurion Way has not been delivered, I think it fair to make that point, especially if you really do want to get people out of their cars.
Re paragraph 5.16 I find it sad that you do not mention in your strategic corridors that the cycle track adjacent to the A259 going west from Chichester is part of cycle route NCN2.
Re paragraph 5.22 our roads are going to be even more over capacity with significantly more housing development. I have already referred several times to my concerns over the dangerous Fishbourne roundabout.
Re paragraph 5.27 I welcome the interest in cycling provision. Living in Summersdale it takes me less than ten minutes to cycle into the city centre - in fact by far the quickest way I can get there. For the most part it is safe, I think, but with the glaring exception of the Northgate gyratory. Whoever designed that clearly forgot that a cyclist is at his/her most risk when pulling away, so to expect cyclists to stop at each exit is a massive deterrent. This cyclist prefers not to use the cycle lane in order to have safer crossing at each exit. I find the St Pauls Road exist especially dangerous. I would also like to have paint markings on the raised kerbs at each exit for safety in the dark.
More generally, if you are in the Low Countries, it is exceptional for cyclists can have two way traffic in what it is a one-way street for motorists - I have seen so many no-entry signs there with "uitgezonderd fietser" below. In fairness there is some of this in Chichester, but I think that there is scope for more.
I also think that Chichester centre needs increased provision for cycle parking, for instance adjacent to the Little London car park, where there is plenty of potential space, and at the eastern end of East Street, where I find the present racks often to be full.
I would also like you to think how cyclists can be safer at the western ends of The Hornet and St Pancras, which are the two roads in Chichester which make me feel very chary.
With the additions of the points made in the previous paragraphs and also restating a need for evening bus services, I generally support the points made in policy S23, though I would repeat what I have already said about expecting people to park too far away from the city centre if you really want people to come there, and I would extend this point by saying that if you are going for distant parking, a park and ride becomes essential. I am agnostic about the Birdham Road to Fisbourne proposal, as I do not know enough about it to comment.
Re policy S24 I would make a particular plea for the Lavant Gap, which is important both to Lavant and Summersdale especially as an important part of our amenity. And we did not fight to save it to have a northern by-pass trundling through there!
I agree with policy S27 and would add that I can remember the floods some fifteen years ago and looking out at the River Lavant east of Maplehurst Road to see how far the waters were going to spread. That too me (besides proximity to Goodwood) would be a major factor in my opposing any development there. I am aware that the Pagham Rife project subsequently ameliorated the risk, but I still think that it needs to be borne in mind, especially given the impact of global warming.
I agree with policies S28 29, 30, and 31. I would make a particular point of air and noise pollution.
Strategic Site Allocations
I agree with policy S32,
How can you write paragraph 6.8? You will know as well as I do that cycling links are not good, and will be worse if Centurion Way is to be diverted. Also how are cyclists supposed to get into the city from the northern end of Whitehouse Farm - down St Paul's Road and coming on to the Northgate Gyratory (which will also be receiving significantly more motor traffic? Please!! I hope that you also know that the plans could well include a really dangerous junction on Centurion Way that is the entrance from Bishop Luffa Close.
As for motor traffic, the same point about St Paul's Road applies. And as for the southern end, surely you know what that is going to do to local roundabouts, not least the dreadful Fishbourne roundabout?
In terms of recreational disturbance, (para 6.12) why is there no reference to Centurion Way?
The points above all are relevant to policy AL1.
Re policy AL2 I do not know enough to comment in much detail. That said, I am concerned about transport access. I know that I am not alone in detesting coming up to the Bognor roundabout from Bognor and often prefer the safer route via the Oving traffic lights. Has any account been made of how such traffic, which is not inconsiderable will be affected, and how this will make the journey from Bognor to Chichester significantly worse than it presently is?
Re policy AL5 I accept the case for redevelopment, though was far from impressed with the last proposal I saw and commented on at the time; I thought, and still think, that the road alternations then proposed were insane and asking for more rather than less jams. I welcome the references to access for cyclists and pedestrian. I am not clear when there are references to the bus depot as to whether that includes the bus station. If you want people to come to Chichester centre, bus access needs to be close; moreover the present bus station is properly close to the railway station, which is important for integrated travel. I do not see any reference to taking away the present crossing gates, which are a serious impediment to traffic at the moment, both on Stockbridge and Basin Road; I think that that is a bad omission.
Re policy AL9 I lack the detailed knowledge usefully to comment, but would ask how far the present state of the A259 has been borne in mind in planning both in Fishbourne and further west from Chichester. It is narrow and at times congested now - major development can only exacerbate such problems.
Re policy AL10 I can comment only as one who fairly often cycles east-west along the A259. The exit from the cycle track on the southern side of the A259 to the east side of Chidham is presently dangerous because of the road layout and the warning sign about cyclists being several; yards too late and often obscured by foliage. Where there is a cycle track in Chidham, parking on that track is not uncommon. There is also a significant gap in the cycle track through much of Chidham. Moreover this is part of a national cycling route, and will become even more significant with more development in Chidham and points west.
Re policies AL11 and AL12 please bear in mind the need for cycle access and for the proposed cycle track between Chichester and Selsey (via Hunston) to develop, especially if you really mean to develop non-motor transport (and also as a valuable and healthy amenity) and bearing in mind how dangerous the B2145 is.
Re policy AL13 cycling provision to the west of the roundabout presently is reasonable; it is not good west of the roundabout. My comments about NCN2 refer here too.
Development Management
I am especially pleased to see paragraphs 7.2, 7.4, 7.6, and 7.8, as with an ageing population and baby bookers such as me passing 80 within ten years or so, increased specialist provision is inevitably going to be necessary. This is not to downplay other specific groups, eg students - I simply write from an area of specific knowledge. I agree with policy DM1.
The principles behind policy DM2 seem right to me and I am pleased to see recognition of the need for affordable housing. I would make specific reference to resolving homelessness, young families with not much money, and people in the twenties moving to a new area to start work.
I agree with what you are saying in policy DM8. I have raised my concerns about such issues as cycling routes, bus services, parking and the impact on existing crowded and/ or dangerous routes earlier in this response.
I can see why you are seeking to protect the city centre and prevent an excessive dominance of out of town areas, all the more so as I have seen this in the USA. That said, I find shopping on the edge of town a lot easier -things are in the same place; parking is easier; prices tend to be better. And how far are you crying for the moon as on-line shopping takes off? I for one would take a lot of persuasion to do much shopping in a city centre especially with poor parking. So, while I accept most of what you say in policy DM12, it is with this big proviso.
I agree with policies DM13 and DM14.
I think that any new building should have to incorporate solar panels (re policy DM16). I know how much electricity my solar panels have saved me, and, were I younger and further solar installation not so expensive (it would take me more than a decade to get my money back) I would seriously consider more to provide solar energy for heating and electricity storage.
We are now so aware of air quality issues that I am very pleased to see policy DM24. I also agree with policy DM25 and would add that this should be a significant issue (because of the noise pollution emanating from Goodwood) for any development east of Maplehurst Road.
Re policy DM33, last time I was there I thought that the canal towpath was very dangerous at the western end, particularly for anyone trying to ride a bicycle there.
My apologies but I do not know enough about the later policies usefully to comment.

Summary
In case it helps for me to summarise what I have been seeking to say:-
* As a cyclist I have inevitably had a lot to say about present inadequacies in the network. These need remedy if you really want people to get their bikes out in a city that is made for cycling and feel safe in so doing. Moreover there are the clear health and pollution gains from more cycling, and it is actually often the quickest way from a resident anywhere in the city to get into the centre.
* Housing is important - to resolve homelessness; to provide affordable housing; to meet the needs of young families with not much money or young singles moving here to begin a job/ career.
* There are particular issues re an ageing population and the increased needs are so predictable now even if perhaps not immediate.
* If you really want people on buses, fares have to be lower so that they are competitive with the marginal cost of a car journey for a family, which they are not at present. Services need to be good and to include the evenings.
* I think that there is a danger of Canute tendencies re retail when I think of the attractions of edge of city shopping let alone on-line trading.
* This is linked with car parking - reasonably central car parking and/or a park and ride are crucial if you really want to maintain/expand the city centre.
* The present situation over the level crossing is unacceptable.
* The Fishbourne roundabout is unacceptably dangerous, and the present "by-pass" is a denial of your hopes of an easy east-west transit.
* I am pleased to see the sections on air and noise pollution, and also the encouragement of solar electricity, and I hope that these will really mean something

Attachments:

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2521

Received: 06/02/2019

Respondent: Sidlesham Parish Council

Representation Summary:

Policy S12 is welcomed, but the range of provision to be supported, especially if whole life costs are to be met will place great demands on funding streams such as S106, CIL and other funding streams and there must be doubt as to whether your council's Infrastructure Development Plan can be fully met.

Full text:

INTRODUCTION - strategic and local importance of A27 improvement

The PC is concerned that the strategic context of the Plan, whilst making reference to the importance of the A27 trunk road, fails to realise the impact of the lack of the implementation of a scheme has on the future sustainability of new development proposed, let alone the completion of those proposed under the current plan.

Reliance on S106 and CIL contributions to mitigate, for instance increased traffic, will have little impact on alleviating the problem that the current A27 represents to communications and, importantly, the city of Chichester's future economic viability.

The plan makes little attempt to future proof Chichester and its hinterland with its continued reliance on relatively low paid employment in tourism, horticulture and areas such as retail.
The Coastal West Sussex and Gt Brighton Local Strategic Statement makes strong reference to the
Inter-relationship between the Bognor Regis northern bypass on the A259, the Arundel bypass and the A27 improvement at Chichester - the impact of these two schemes on Chichester, already apparent at the Bognor roundabout, could be catastrophic congestion.

Comments on Main policies.

S4 Meeting housing need

The Manhood Peninsula is expected to deliver 1993 units during the Plan period. Of this figure, 600 are in Selsey, East Wittering and Hunston, 175 as parish housing requirement in Birdham and North
Mundham. It is not clear what proportion of the residual 1208 fall into the category planning permissions, committed or made as of 2017 and what are expected to be small windfall sites.
Without this breakdown the potential impact on parishes such as Sidlesham, that are deemed unsustainable for housing, cannot be assessed. This is particularly important in Sidlesham where, due to prior consent approvals through the conversion of agricultural / horticultural buildings there is potential for 100 plus new units. This potential that would appear to be categorised as "windfall" obviously does not fit the definition, especially as to date (32 approvals in Sidlesham and Earnley), none are social housing but all are full market and some, costing £600k, are beyond any prospect of meeting the needs of first time buyers. The parish considers the majority of the conversions inappropriate and the potential scale of the number of conversions challenges the District's sustainability definition that is well founded for the parish. Whilst the Parish Council appreciates that the guiding legislation stands outside the local plan process, the potential distortion the developments, which are essentially on the ex Land Settlement Estate, needs to be specifically addressed in the local plan. Additionally, there are implications for policies S11 and DM15.

S6 Affordable Housing, DM4 Affordable Housing Exception Sites (S12 Infrastructure Provision)

The policy and supporting text gives too great a flexibility to developer, especially in terms of the economic viability of development. The renegotiation by developers of the proportion of social housing post original consent appears to have characterised many developments arising from the existing plan and consents that were granted prior to its approval. The fact that the plan seeks to control the artificial sub division of sites to avoid the social housing "trigger" gives a strong indication of many volume builders' reluctance to truly engage in meeting the true scope of overall housing demand. Whilst the hybrid of shared ownership meets a particular aspect of overall demand, it fails to address the increasing necessity of proper social housing. The true economic viability of sites needs rigorous independent assessment and, if not viable as market led development, the appropriateness of the site for development should be reassessed or its consideration for acquisition by, for instance, a community land trust scheme or compulsory purchase to provide social housing should be considered.

Policy S12 is welcomed, but the range of provision to be supported, especially if whole life costs are to be met will place great demands on funding streams such as S106, CIL and other funding streams and there must be doubt as to whether your council's Infrastructure Development Plan can be fully met.

S7 Gypsy and Travellers and Travelling Show People, DM5 Accommodation for Gypsies

It is noted that separate provision is required in the 5yr housing supply for this category. The eligibility for inclusion is that the individual still has an itinerant life style, ie travelling from place to place. Many of the gypsy families/individuals that seem to qualify under this category patently do not exhibit this form of life style. Local experience fully supports this position with gypsy communities simply using their caravan homes as a base to engage in trade, with the site often becoming the builders' type yard for the storage of materials or the waste from their trade. This form of occupation does not distinguish the use from any other individual living in an area and consequently should not qualify for any special recognition; in fact, in many cases such use under normal planning powers would be contrary to policy.

This "special treatment" causes a great deal of resentment in local communities especially where there is a social housing need - that is most areas - and where school places are under pressure.
The qualifying criteria must be fully investigated and a change in status over time reviewed as many sites, originally for itinerate use, simply become settled locations and do not therefore meet the criteria. It seems that the process from itinerant to settled status is a common progression and has the result of the "need" for new pitches continually increasing.

The substantial increase from the 2015 plan requirement to the 90 plus gypsy pitches now identified illustrates how the process is being used to bypass Planning that would restrict the provision of such "housing" if it were built development and that areas become favoured by gypsy communities as other gypsies are already located there and a sub community established. The criteria for assessment of eligibility must be reviewed together with the transition to settled status and additionally the degree to which concentrations of gypsy and other travellers are occurring in specific areas - this is considered to be the case in Sidlesham.

DM6 Accommodation for Agricultural Workers

The reintroduction of this qualifying criteria is welcomed. However, there is a major issue with enforcement and the policy needs to be strengthened to ensure the occupant continues to be employed in agriculture or horticulture. The change away from agricultural/horticultural occupation is often not declared and after the requisite elapse of time, ELD status is applied for. The need to register agricultural/horticultural occupation on an expiry time basis that would exclude qualification under ELD should be considered in the policy and/or the surrounding text. The subdivision of land and the separation of the original accommodation from the land is an increasing aspect of land holding in areas such as Sidlesham. On many sites an agricultural viability assessment is made as to whether a subdivided holding is viable and whether a constant presence on site is required to maintain the use and therefore accommodation required. However, this potential position should be a consideration at the original point of separation and a condition made that the subdivided land should not benefit from a subsequent consent for another house/residential caravan. This subdivision has and continues to be a trait on the ex LSA estate and, particularly within the HDA's, undermines their priority for horticultural production. At least in the HDA's the approval of agricultural worker accommodation should be restricted and perhaps limited to a residential caravan on a temporary consent and not lead to a progression to a permanent building as currently happens.

S11 Horticultural Need, DM15 Horticulture

There appears to be a weakening of the distinction between what in the 2015 Plan were termed
"hub" sites at Runcton and Tangmere and the other HDA sites in Sidlesham and Almodington.
Para 7.92 is particularly troubling ". It is not expected that large scale glasshouse development
(228,000 sq m required) will occur in Sidlesham and Almodington HDA's to the same extent as at
Runcton and Tangmere. The statement introduces doubt over the distinction between large scale industrial type of production and what is termed "market garden" horticulture expected at Sidlesham and Almodington.

The statement about "land adjacent to an HDA" previously related to Runcton and Tangmere. Its extension to Sidlesham and Almodington again introduces doubt over your council's true intentions about the scale of the industry envisaged outside the old hub sites and undermines the strong position it took on large scale such the Madestien proposal in Almodington. Your council stresses the importance of the HDA but continues to allow the break-up of the land within the smaller ones through conversion of buildings to residential and the take of land for gardens under "prior consent" as mentioned above. This approach is contrary to the proposed policy and will lead to further fragmentation and inefficient use of the land that remains. This approach could lead to requests for land outside the current smaller HDA's and bring glasshouse development into conflict with the overall environment. Many of the largest glasshouse developments are outside the HDA's but in established glasshouse areas and lead to the possibility that the HDA's need review and at least two new areas established based on the Fletchers Estate and Jakes Nursery and on Street End Lane. These area are equal or probably exceed production in many parts of the two HDA's.

S23 Transport and Accessibility

The strategic need for a solution to the A27 has already been mentioned but the impact locally cannot be overstressed in respect of the Manhood Peninsula. The high levels of out commuting for employment and many services are all dependent on a functioning A27 and further development in reality can only aggravate a non-functioning situation.

The cul-de-sac position of Selsey presents major problems for the town - the second largest in the district - in terms of emergency services and, for instance, the levels of congestion when heavy domestic traffic flows are combined with the summer tourist traffic that swells the population to approaching four to five times its winter levels. The sustainability of this situation in terms of environmental impact, the economic viability and overall acceptability must be doubtful. This is apparent to the road users but increasingly the areas that the road passes through, such as
Sidlesham, suffer pollution from exhaust emissions, noise, unacceptable delay in access from adjoining roads and properties, just simply crossing the road by pedestrians is made almost impossible as traffic is so often two way with no gaps. This situation cannot be ignored and just allow the road to be loaded with more traffic. The carrying capacity of the B2145 must be seen as a limiting factor in any future development in Selsey. This situation is mirrored on the A286 with The Witterings and Bracklesham.

It will be important that development in Selsey contributes to traffic management on the B2145 and that the whole of the road is eligible for any S106 and CIL contributions and not just the immediate locality of Selsey. The overall intention should be to improve safety, ensure speed is observed and allow safe road crossing. These factors will be considered within the Sidlesham Neighbourhood Plan.

Pollution is an increasing concern and in line with the Plan's policy objectives for greening of the environment, structural tree planting will be proposed within the B2145 corridor. The plan makes reference to sustainable transport but there are no specific proposals. It is suggested that for the Manhood Peninsula the proposed Greenway Selsey to Chichester is part of a specific policy that seeks to protect the adopted route and that Neighbourhood Plans for Hunston, Sidlesham and Selsey then adopt the route into their plans.

S24 Countryside, DM22 Development in the countryside, DM31 Trees, hedgerow and
woodland, DM29 Biodiversity

These policies and accompanying text is supported and will form the basis of Sidlesham's Neighbourhood Plan. Para 5.39 indicates conversions of existing buildings will be favourably considered where they lead to uses needed to support the rural economy and create 'rural affordable housing'. Currently, many conversions do not meet these criteria, especially the latter where often large upper market houses are developed way out of the range of meeting any local social need. The policy needs to reflect this problem with more specific criteria covering what is acceptable within the scope of any conversion.

The identity of the rural areas is an important consideration in maintaining their character if they are not to become just the spaces between larger settlements. This is particularly important on the
Manhood Peninsula and in the countryside associated with the transport corridors of the A286 and
B2145. The open countryside along these routes with their small settlements are in danger of encroachment by development and urbanisation. A specific policy is suggested to protect such areas and enhance their character by schemes of tree planting, improvement to the roadside environment and strong traffic management. Again, this approach will feature in the Neighbourhood Plan.
Whilst it is appreciated that agriculture is currently in a state of uncertainty, a policy that seeks to promote the balance between agricultural production, the environment and amenity would be welcome as a basis for whatever system of agricultural subsidy eventually is formulated. Particular emphasis should be placed on the protection of high grade agricultural land (grade 1 - 3a), biodiversity , and for instance structural tree planting for drainage and co2 reduction. A positive approach to recreational access in support of green tourism should also form part of a strengthened countryside policies.

S25 The Coast, S30 Strategic Wildlife Corridors

The policy makes reference to Chichester Harbour Management Plan but should also make reference to the Pagham Harbour Management Plan - although this currently only covers the period to 2018, the RSPB can be expected to bring forward a new plan for the next 5-10yr period.
The significant changes to the Pagham Spit over a relatively short period of time could have significant impact on the drainage of the harbour and particularly the surrounding land and including the R. Lavant flood relief channel. The importance of the Harbour's drainage function should be reflected in a specific policy that balances the significance of the habitat with the land drainage issues.

The Medmerry Scheme has created a significant change in the coastal geography creating a significant new coastal habitat extending westward from the margins of Pagham Harbour to within a short distance of the edge of Chichester Harbour AONB. An important corridor for wildlife is developing over the short distance between the two and should be considered as a designated area under policy S30.

S27 Flood Risk Management

The plan makes reference to flood risk but does not fully realise its significance to the Manhood
Peninsula and the constraints it places on development, the future of its economy and the resilience of its communities.

Whilst SUDS has its uses in localised drainage it often simply drains an area into a downstream network that has to cope with the additional run off. The Peninsula has an extremely high water table for the majority of the year that makes most soakaway drainage ineffective. An integrated network utilising the existing ditch system and augmenting this with attenuation areas with good clear outlets to the sea must be developed and maintained.

Many new housing developments rely on SUDS but simply only cover the development site. Developers have to be responsible for the water they produce from the point of generation to its disposal to the sea or main river. This should form a requirement of any planning agreement and a policy within the plan should reflect and formalise this responsibility. Realisation of the true infrastructure cost of drainage should be fully reflected in the site evaluation process and its economic viability. The development of many coastal locations or those on flood plain may be proven uneconomic if the real cost for drainage were realised and not the passing on of the problem
downstream as currently occurs.

Reference is made to Surface Water Management Plans. It is the responsibility of the lead strategic flood authority (in this case WSCC) to produce and maintain these plans. As a material consideration there should be policy and text to ensure the plans are kept up to date and that priorities identified in plans are brought forward for action and funding such as CIL directed to their implementation.

S31 Wastewater Management and Water Quality

Southern Water needs to have information on future demand foul drainage - detailed discussions with SW have shown that the levels of development known to them, especially in respect of
Sidlesham Waste Water Treatment Works, do not appear to reflect the development levels and question the capacity of the facility. Additionally, the size and overall functioning of the pipe network is very troublesome, for example, the "trunk main" from the Witterings. It would appear that calculations are primarily based on dry flow rates where much of the pre 1960's housing on the
Peninsula has mixed drainage and the foul system suffers from ground water inundation. The Parish requests that a clear reappraisal of the wastewater capacity of SWWTW and of the network is made and the infrastructure costs of a system that has the required headroom and a network that will support existing and any new development is made and factored into the plan.

DM35 Equestrian Development

The parish is concerned about the high level of horse related development that is occurring on the
Peninsula, especially on the settlement boundary margins, within the ex LSA estates, and associated with gypsy sites. Much of this development is often deemed as "agricultural use" when it is really a "change of use" as the livestock are not supported by grazing of the land. The use for "horse culture" often removes high quality land form agricultural/ horticultural use, despoils the land creating a strong visual intrusion often close to residential areas. The Plan policy should ensure that the change of use is properly applied and enforced. Clarity should also be sought as to the true recreational nature of much of the horse keeping and as there is no bridleway network on the Peninsula how often large numbers of horses kept on a small acreage might be exercised.

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2539

Received: 07/02/2019

Respondent: Mrs Sue Talbot

Number of people: 2

Representation Summary:

We support Policies S1, S2 and S3 in principle. However, we are concerned about the impact that 1250 new dwellings could have on Southbourne and its residents. Infrastructure in the Parish is already inadequate.

Full text:

We support the general approach taken in the Preferred Approach and appreciate the difficulty in balancing the requirements for new housing placed on the District Council against the need to protect sensitive and attractive areas. We support Policies S1, S2 and S3 in principle. However, we are concerned about the impact that 1250 new dwellings could have on Southbourne and its residents. Infrastructure in the Parish is already inadequate. The infrastructure required to serve the new development as listed in Policy AL13 must be delivered on time, ie before or during the proposed development, if the quality of the local environment and the residents is to be protected. Therefore, we support the framework provided for the Southbourne Parish Neighbourhood Plan review set out in AL13 provided the infrastructure is delivered in time as set out in Policy S12. If delivery cannot be guaranteed we would object to the proposed housing numbers.

(We have raised objection to Policy AL13 (4) which is addressed in a separate submission).

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2544

Received: 07/02/2019

Respondent: Chichester Harbour Trust

Representation Summary:

It is essential to increase the capacity of water treatment works at all facilities in Chichester Harbour to ensure no additional storm discharges of untreated waste water into the Harbour, which could adversely impact the status of the SSSI designation.

Full text:

We object to the allocation site at Highgrove Farm, Bosham with approximately 13 ha of open countryside allocated to a minimum of 250 houses.

This development in the countryside directly conflicts with policy S24 Countryside and Policy S26 the Natural Environment; which clearly states there should be no adverse impact on the openness of views in and around the coast, designated environmental areas (i.e. the AONB) and the setting of the South Downs National Park. The proposed development at Highgrove Farm directly contradicts these policies.

We strongly believe that this development would cause irretrievable harm to the landscape character, setting and context of Chichester Harbour AONB and the intervisibility with the South Downs National Park. We feel that the measures proposed within the policy would not be able to sufficiently mitigate for the damage this development would cause.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2593

Received: 07/02/2019

Respondent: Countryside Properties

Agent: Turley

Representation Summary:

Criterion 4 - laudable but should be recognised not always achievable in practice - provide further guidance.

Final part of policy - insert new bullet (between first and second) to indicate that CDC will work with the applicant to explore/agree alternative forms of infrastructure that would address identified viability concern.

Full text:

See attachment

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2637

Received: 05/02/2019

Respondent: Barton Willmore

Representation Summary:

We support this policy however additional provision should be made to allow for
significant infrastructure improvements to be part funded by the Council or through grant funding where they are of wider benefit than simply being required to make a
development acceptable. e.g. Highways England and Housing Infrastructure Fund.

Full text:

See attachment

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2654

Received: 04/02/2019

Respondent: Mr Mike Dicker

Representation Summary:

- Consideration must be made for improvements in infrastructure and public transport links to settlement hubs already at breaking point.
- Work should already be being undertaken, not just to mitigate future development.
- There are primary schools in SDNP that are undersubscribed.
- IDP must be available for consultation prior to examination.


See attached for full detail.

Full text:

Full detailed submission for the Local Plan and supporting evidence is attached.

The representations attached to this submission reflect a high level summary of the detailed submission and do not contain the full level of detail received.

High level comments received:

a. The transport study conducted by Peter Brett Associates (PBA) is not fit for purpose and needs to be rewritten. The scope set for PBA is far too constraining and counters the democratic process agreed by the council to seek alternative routes.

b. Many of the documents are inconsistent and in their current form smack of inconsistency and bias. Reasons for excluding some strategic sites are not consistently used for other sites.

c. Many of the evidence documents are not present or are not complete for this consultation. These will need to be re consulted when they are complete.

d. CDC should not be accepting the unmet housing need from the South Downs National Park (SDNP). They should also be going back to government to insist that until certainty is provided on the A27 this area can not accommodate future housing and or employment space.

e. The proposed link road was resoundly rejected last time it was proposed by Highways England. CDC need to respect the voices that rejected what is option 2 by stealth. Particularly as the PBA report states that the building of the link road will offer other "strategic options". This will not be tolerated locally.

Attachments:

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2725

Received: 07/02/2019

Respondent: Sussex Wildlife Trust

Representation Summary:

We support this policy recognising green infrastructure within its provision in line with paragraph 171 of the NPPF. However, we do note inconsistencies within the PAP and seek clarity on whether the term 'green infrastructure' in this policy also captures blue assets. For example, the glossary for the PAP does not refer

to blue assets within the definition of Green Infrastructure. Yet the supporting text (5.61) for Policy S29: Green infrastructure does recognise the blue aspect of green infrastructure.

Full text:

See attachment

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2738

Received: 07/02/2019

Respondent: Boxgrove Parish Council

Representation Summary:

Until infrastructure has been addressed, CDC should not accept additional housing.

Full text:

Given that no work has been undertaken to relieve the existing over-stretched infrastructure for the developments already granted permission, Boxgrove Parish Council is at a loss to understand how CDC can contemplate increasing the annual quota of 435 homes per annum to an astounding 601.
The original quota of 435 was not increased at the time BECAUSE the inspector agreed that the infrastructure then could not cope with more. Nothing has changed since then. Added to this the recent disastrous loss of Government funding to mitigate the conditions on the A27 will guarantee grid-lock and misery for the entire district for years to come. This will not help businesses within the Chichester district.
Clearly without supporting infrastructure all the added schools, doctors' surgeries, sports' facilities, not to mention the hospitals, will have an added strain with which they will not be able to cope.
CDC should not accept this increase in housing until the infrastructure has been addressed. Furthermore, this acceptance of higher numbers has seen CDC allocating numbers of homes far in excess of those agreed in made neighbourhood plans and in those already submitted.

Refuse the increased numbers until the infrastructure proposals have been implemented.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2867

Received: 07/02/2019

Respondent: MR William Sharp

Representation Summary:

4.80 fails to distinguish between high carbon/carbon light infrastructure; fails to distinguish between infrastructure which does/does not impact landscape and/or historic environment, facilitates particularly car dependent housing developments and fails to insist on low-car developments.
4.86 Where infrastructure costs might jeopardise a development, Plan should impose on developers a duty to re-plan for less impactful development as low-car housing would lessen the need to pay a share of expensive new roadworks.

Full text:

See attachment

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2889

Received: 07/02/2019

Respondent: Bloor Homes Southern

Agent: Savills UK

Representation Summary:

Policy should include text to clarify level of provision required and supported by viability evidence.

Make criterion 2 clearer in that it only relates to infrastructure required specifically to make devt acceptable.

Remove ref to "full fibre communications infrastructure" as may not be in control of developer or development site.

Full text:

See attachment

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2939

Received: 06/02/2019

Respondent: CPRE Sussex

Representation Summary:

We are concerned that there is a real risk that development and supporting infrastructure will continue to be out of step in some places.

Full text:

See attachment

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2997

Received: 04/02/2019

Respondent: Mrs Sarah Sharp

Representation Summary:

Object on grounds that new development is not coordinated with the infrastructure it requires; new development will put huge strain on existing provision; CIL system for providing infrastructure is patchy; lack of cooperation between councils re; safe linking paths and cycleways; failing to prioritize sustainable modes of travel; developers are able to deliver housing and not infrastructure.

Full text:

See attachment

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3054

Received: 04/02/2019

Respondent: Mr and Mrs L.G. Cooper

Number of people: 2

Representation Summary:

Central Government needs to be made to realise that simply fulfilling their number
requirements will (i) need central funding - e.g. improving the A27, and (ii) be impracticable if leading to overloading of existing local sites/infrastructure.

Full text:

See attachment

Attachments:

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3240

Received: 07/02/2019

Respondent: Taylor Wimpey Strategic Land

Agent: Henry Adams LLP

Representation Summary:

Support policy but consider than further housing should be delivered to ensure deliverability of infrastructure

Full text:

See attachment

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3245

Received: 07/02/2019

Respondent: WSCC (Estates)

Agent: Henry Adams LLP

Representation Summary:

Support policy but consider that current proportions of housing/employment figures could restrict delivery of infrastructure.

To ensure deliverability, further consideration should be given to viability of delivering infrastructure required to support site allocations through the IDP.

Full text:

See attachment

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3274

Received: 06/02/2019

Respondent: Landacre Developments Ltd

Agent: Genesis Town Planning

Representation Summary:

Support policy S12. However the Local Plan Policy or the IDP should make clear, for at least the first five years, what infrastructure is required, who is going to fund and provide it, and how it relates to the anticipated rate and phasing of development. Not set out in either S12 or the IDP (paragraph 15.9) which specifically deals with the Fishbourne AL9 allocation. Paragraph 15.9 of the IDP should state that 'the parish is allocated for residential development of 250 dwellings' rather than 'the site is...' in recognition that more than 1 location should be selected for the allocation.

Full text:

See attachment

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3292

Received: 06/02/2019

Respondent: Chichester Grain Ltd

Agent: Genesis Town Planning

Representation Summary:

Support policy S12. However the Local Plan Policy or the IDP should make clear, for at least the first five years, what infrastructure is required, who is going to fund and provide it, and how it relates to the anticipated rate and phasing of development. Not set out in either S12 or the IDP (paragraph 15.4) which specifically deals with the Southbourne allocation.

Full text:

See attachment

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3321

Received: 06/02/2019

Respondent: Domusea

Agent: Genesis Town Planning

Representation Summary:

Support Policy but should add in the following:
Southbourne - Paragraph 15.4 of the IDP should in addition state that 'the parish is allocated for residential development of 1250 dwellings' rather than 'the site is...' in recognition that more than 1 location might be selected for the allocation.
Mundham -

Full text:

See attachment

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3414

Received: 06/02/2019

Respondent: Seaward Properties Ltd

Agent: Genesis Town Planning

Representation Summary:

The Local Plan Policy or the IDP itself should make clear, for at least the first five years, what infrastructure is required, who is going to fund and provide it, and how it relates to the anticipated rate and phasing of development. This is not set out in either S12 or the IDP (paragraph 15.9) which specifically deals with the Fishbourne allocation. Paragraph 15.9 of the IDP should in addition state that 'the parish is allocated for residential development of 250 dwellings' rather than 'the site is...' in recognition that more than 1 location should be selected for the allocation.

Full text:

See attachment