Local Plan Review: Preferred Approach 2016-2035

Ended on the 7 February 2019
For instructions on how to use the system and make comments, please see our help guide.

Appendices

(6) Appendix A – Plan Area Sub-Area Maps

output


output

output

(2) Appendix B – Designated Rural and Non-Rural Areas

output

(4) Appendix C – Appropriate Marketing

Marketing Guidance and additional information required to support planning applications

Introduction

E.1 Certain applications for the change of use or redevelopment of property/land need to be accompanied by robust and credible evidence that adequate marketing has occurred in order to support the argument that the property/land is no longer required. This appendix gives guidance on the evidence that should be provided as part of marketing or supporting additional housing in the countryside.

Policies contained in the Local Plan Review which this guidance relates to are:

Policy DM1 – Specialist Housing

Policy DM6 – Accommodation for Agricultural and other Rural Workers

Policy DM7 – Local and Community Facilities

Policy DM9 – Existing Employment Sites

Policy DM13 – Built Tourist and Leisure Development

Policy DM14 – Caravan and Camping Sites

Policy DM21 - Alterations, Change of Use and/or Re-use of Existing Buildings in the Countryside

Proportional Approach

E.2 This appendix sets out the minimum standard of marketing, however it is recognised that any such exercise should be proportional to the size and characteristics of the site/property and the scale of the proposed alternative use. Where possible, the advice of the Council should be sought prior to the commencement of any marketing campaign to ascertain the period and extent of marketing required and to discuss the extent of alternative uses that are required to be explored.

General Requirements of Marketing

E.3 It is important that the marketing of the land, buildings or a site(s) explores appropriate alternative uses; that the marketing price is competitive; the marketing has been appropriate and genuine (this is likely to be in the form of an independent valuer with relevant qualifications); and that a record of all the marketing is presented with the application proposal. The type and scale of marketing should be commensurate with the scale of the facility proposed to be lost.

E.4 As part of any relevant planning application, it will be necessary to submit a marketing report to demonstrate that a robust marketing strategy has been followed. Unless there are significant material considerations to justify otherwise, the marketing exercise should include evidence that the site has been vigorously and exhaustively marketed for between a year and 18 months. The period of marketing must have ended on a date within the nine months prior to the date the planning application was submitted.

E.5 In all cases the marketing process requires as a minimum:

  1. Confirmation by an appropriate marketing agent on headed company paper that the premises were appropriately and extensively marketed for the required length of time;
  2. How interest in the site has been objectively dealt with;
  3. Details of the conditions/state of the land/premises and their upkeep before and during marketing and viability;
  4. Details that the marketing price is realistic;
  5. Dated photographs of marketing board/s on the premises of an appropriate quality, size, scale, location and number during this time;
  6. An enquiry log, how it was followed up and why any enquiries have been unsuccessful;
  7. A copy of all advertisements in the local press and trade journals (should be at least four weeks' worth of advertisements, spread across a six month period);
  8. Evidence of regular marketing across digital platforms over a minimum of 12 months.

E.6 Review of exercise: Within a reasonable period of time following the start of the marketing exercise, if there is a lack of interest in the premises the marketing should be reviewed by the agent and the vendor with a view to adjusting the marketing which could include a review of the price as appropriate.

E.7 Appointed agents may not always be sufficiently active in the relevant market sector under those circumstances the appointment of either sub or joint agents to assist in marketing may be appropriate. The Marketing Report should demonstrate that the need for review has been thoroughly considered.

Viable alternative uses

E.8 Where a change of use is proposed on the grounds that the site has no viable future as a commercial or employment site, the Council will require evidence to demonstrate that the land or property has been fully exposed to the market at an appropriate valuation and that a range of similar uses have been considered. This ensures the Council can adequately assess an application for change of use on the basis of insufficient market demand. The Council may engage specialist advice as necessary to assess the valuation and marketing strategy on a case by case basis.

Assets of Community Value

E.9 Where the property is listed as an Asset of Community Value under the Localism Act 2011, the Council will expect to see evidence of discussion with the local community regarding options for its continued use. This might include an exploration with the local community of the potential for a community enterprise.

Additional Information relating to the loss of specialist accommodation

E.10 In addition to the general criteria above, evidence may be required to demonstrate whether:

  1. The overall proposal would lead to a net loss of residential accommodation on the site,
  2. It can be demonstrated that the accommodation is inherently unsuitable to meet these specialist needs.

Additional information relating to the loss of employment land and use

E.11 In addition to the general criteria above, where a planning application may lead to the loss of an existing site currently in business use class (B1-B8) or similar sui generis uses to alternative uses (without satisfactory provision for replacement land/floorspace or relocation of existing businesses) supporting information will also be required to demonstrate that:

  1. The site/premises has been vacant for some time and has not been made deliberately unviable;
  2. The site/premises has been actively marketed for business or similar uses at a realistic rent/price for a minimum of 2 years or a reasonable period based on the current economic climate;
  3. Alternative employment uses for the site/premises have been fully explored; where an existing firm is relocating elsewhere within the district, maintaining or increasing employment numbers will be acceptable; and
  4. For proposals involving a net loss of 2,000m2 or more employment floorspace, the loss of the site will not result in an under-supply of available employment floorspace in the local area.

Additional Information relating to either proposals for, or the loss of, tourism and/or leisure development

E.12 In addition to the general criteria above evidence may be required to demonstrate:

  1. Marketing and viability assessment for loss of tourist or leisure development including holiday accommodation;
  2. Evidence of the need for new tourist facilities to show a high level of demand on existing sites and justification for new sites, having regard to the quantitative and qualitative analysis of the range of tourist accommodation available, including details about other local touring and permanent sites.

Additional Information relating to housing for agricultural and other rural workers

E.13 In addition to the general criteria above, evidence may be required to demonstrate:

  1. That the dwelling has been marketed for a reasonable period of time based on the current economic climate, how such marketing has been targeted, whether the disposal is freehold, leasehold or on a rental basis. This should be at a realistic market price for an agricultural tied dwelling. Normally a discount of at least 30% against open market price would be expected to establish whether it could meet the existing needs of another local farm or rural business.

E.14 Supporting information required for new occupational dwellings to support existing agricultural activities on well-established agricultural units includes:

  1. there is a clearly established existing functional need;
  2. the need relates to a full-time worker, or one who is primarily employed in agriculture and does not relate to a part-time requirement;
  3. the unit and the agricultural activity concerned have been established for at least three years, have been profitable for at least one of them, are currently financially sound, and have a clear prospect of remaining so;
  4. the functional need could not be fulfilled by another existing dwelling on the unit, or any other existing accommodation in the area which is suitable and available for occupation by the workers concerned; and
  5. other planning requirements, e.g. in relation to access, or impact on the countryside, are satisfied.

E.15 A functional test is necessary to establish whether it is essential for the proper functioning of the enterprise for one or more workers to be readily available at most times. Such a requirement might arise, for example, if workers are needed to be on hand day and night:

  1. in case animals or agricultural processes require essential care at short notice; or
  2. to deal quickly with emergencies that could otherwise cause serious loss of crops or products, for example, by frost damage or the failure of automatic systems.

Appendix D – Shopping Frontages

Primary and Secondary Retail Frontages

The following streets within the Primary Shopping Area of Chichester have been defined as Primary and Secondary Retail Frontages.

Primary Retail Frontage

East Street – North side from No. 1 to No. 50

East Street – South side from No. 51 to No. 94

Eastgate Square – South side from No. 13 to No. 17

North Street – West side from No. 1 to No. 37

North Street – East side from St Peters House to No. 86-87

South Street – West side from No. 1-3 to No. 12-13a

South Street – East side from No. 63 (Old Theatre Mall) to No. 74

West Street – North side from No. 1 to No. 4

Secondary Retail Frontage

Eastgate Square – North side from No. 1 to No. 12

Market Road – West side from No. 4-5 to No. 13

Market Road – East side from No. 16 to No. 17

Crane Street – both sides

Little London – East side from No. 35 to No. 42

Little London – West side from No. 1 to No. 3

North Street – West side from No. 38 to No. 49

North Street – East side from No. 50 to No. 63

Boardwalk Arcade

Northgate – both sides

South Street – West side from No 13 to No. 41

South Street – East side from No. 42 to No. 63

Southgate – West side from No. 8-9 to No. 29

Southgate – East side from No. 30 to No. 34

St. Martins Street

The Square, Eastgate

St. Pancras

The Hornet – North side from No. 11 to No. 25

The Hornet – South side from No. 4 to No. 46-48

West Street – North side from No. 5 to No. 18

(5) Appendix E – Monitoring Framework

Policy

Target to be achieved

Delivery

Indicators

Responsible Agency/Partner

S1 – Presumption in Favour of Sustainable Development

N/A

N/A

N/A

N/A

S2 – Settlement Hierarchy

Distribution of housing in line with policy.

Local Plan

Neighbourhood Plans

Development Management process

New homes built each year (net) and distribution throughout plan area

Chichester DC

Parish Councils

Developers and Landowners

Infrastructure providers

S3 – Development Strategy

Delivery of housing through strategic allocation policies.

Delivery of local community facilities.

Delivery of small scale employment, tourism and leisure

Local Plan

Neighbourhood Plans

Development Management process

New homes built each year (net) and distribution throughout plan area

Distribution of completed community development, employment, tourism and leisure proposals throughout plan area

Chichester DC

Parish Councils

Developers and Landowners

Infrastructure providers

S4 – Meeting Housing Needs

Delivery of 12,350 net additional homes between 2016 and 2035 (650 dwellings per year).

Local Plan

Neighbourhood Plans

Site Allocations DPD

Development Management process

New homes built each year (net)

Chichester DC

Parish Councils

Developers and Landowners

Infrastructure providers

S5 – Parish Housing Requirements 2016 -2035

In line with Table set out in Policy S5.

Local Plan parish housing numbers

Site Allocations DPD

Neighbourhood Plans

Development Management process

New homes built each year (net) by parish

Chichester DC

Parish Councils

S6 – Affordable Housing

Delivery of at least 30% of all new dwellings as affordable housing

Local Plan

Neighbourhood Plans

Site Allocations DPD

Development Management process

Affordable homes built each year by type and as a percentage of all homes built

Median house price to income ratio.

Chichester DC

Parish Councils

RSLs

Homes and Communities Agency

Developers and Landowners

Infrastructure providers

S7 – Meeting Gypsies, Travellers and Travelling Showpeoples' Needs

91 net pitches for Gypsies and Travellers in line with Table 4.1

28 net plots for Travelling Showpeople in line with Table 4.2

Local Plan

Site Allocations DPD

Development Management Process

Net additional GTTS pitches and plots granted permission each year

Chichester DC

West Sussex CC

Gypsy, Traveller and Travelling Showpeople's organisations

Developers and Landowners

S8 – Meeting employment land needs

Delivery of 145835 sq.m net additional floorspace in B Use Class between 2016 and 2035, in line with HEDNA..

Local Plan

Site Allocation DPD

Neighbourhood Plans

Development Management process

Economic Development Strategy

Amount of additional employment land (B uses) developed by type

Percentage change in the number of VAT registered Businesses

Chichester DC

West Sussex CC

Parish and Town Councils

Developers, Landowners and Local Businesses

Coast to Capital LEP

S9 – Retail Hierarchy and Sequential Approach

Delivery of 9500 sqm (gross) comparison retail floorspace at Chichester City

Local Plan

Site Allocation DPD

Development Management process

Monitoring of retail business space commence, gained or lost

Amount and distribution of completed retail development throughout plan area

Chichester DC

Chichester BID

Parish and Town Councils

Developers, Landowners and Local Businesses

Local Organisations

S10 – Local Centres, Local and Village Parades

Maintain vitality and viability of local centres and parades

Local Plan

Neighbourhood Plans

Development Management process

Monitoring of retail business space commenced, gained or lost

Monitoring vacancy rates

Chichester DC

Parish and Town Councils

Developers, Landowners and Local Businesses

Local Organisations

S11 – Addressing Horticultural Needs

Delivery of a maximum 228,000 sqm horticultural floorspace

Local Plan

Site Allocation DPD

Development Management process

Economic Development Strategy

Amount of large scale glasshouse floorspace completed

Chichester DC

West Sussex CC

Developers, Landowners and Local Businesses

West Sussex Growers Association

S12 – Infrastructure Provision

Delivery in line with IDP

Local Plan

IDP

Neighbourhood Plans

Development Management process

Record of infrastructure projects committed or completed.

Chichester DC

West Sussex CC

Infrastructure providers

S13 – Chichester City Development Principles

Enhance Chichester City's role as sub-regional centre and visitor destination

Local Plan

IDP

Development Management process

Monitoring of retail business space commenced, gained or lost in the city.

Monitoring vacancy rates in city centre

Record of community projects committed or completed

Chichester DC

Chichester City Council

Chichester BID

West Sussex CC

Developers, Landowners and Local Businesses

S14 - Chichester City Transport Strategy

Deliver integrated transport strategy for Chichester City

Local Plan

IDP

Development Management process

Record of City Centre projects committed or completed

Average number of vehicles entering Chichester City Centre between 7 and 10am

Chichester DC

West Sussex CC

Infrastructure providers

S15 – Goodwood Motor Circuit and Airfield

Support proposals to enhance or maintain the economic benefits of Goodwood Motor Circuit and Airfield

Local Plan

Development Management process

Monitor number and proposed type/use of permissions granted within site.

Chichester DC

Developers, Landowners and Local Businesses

S16 – Development within vicinity of Goodwood Motor Circuit and Airfield

Limit noise-sensitive development within 400m of motor circuit and airfield

Local Plan

Development Management process

Monitor number of permissions granted within 400m of site

Chichester DC

Developers, Landowners and Local Businesses

S17 – Thorney Island

Support proposals to enhance or sustain military operations on site

Local Plan

Development Management process

Monitor defence estate reviews and related strategies with regard to long term military plans

Chichester DC

S18 – Integrated Coastal Zone Management for the Manhood Peninsula

Promote integrated approach to coastal management

Local Plan

Neighbourhood Plans

Shoreline Management Plans

Development Management process

Collation of monitoring data against other strategic policies of the Plan, tailored to the Manhood Peninusla.

Percentage of rural households within 2km/4km of facilities

Chichester DC

Parish and Town Councils

Developers, Landowners and Local Businesses

Infrastructure providers

Environment Agency

Natural England

S19 – North of the Plan Area

Support proposals for appropriate development for the area

Local Plan

Neighbourhood Plans

Development Management process

Collation of monitoring data against other strategic policies of the Plan, tailored to the north of the plan area

Percentage of rural households within 2km/4km of facilities

Chichester DC

Parish Councils

Developers and Landowners

S20 - Design

Promote high quality design principles for new development that enhance the area

Local Plan

Neighbourhood Plans

Development Management process

Monitoring decisions on planning applications refused and appeals upheld on design considerations

Waste collected per household

Domestic CO2 emissions per household

Reduction in CO2 emissions per capita

Chichester DC

Parish Councils

Developers and Landowners

S21 – Health and Wellbeing

Improve and promote healthy communities

Local Plan

Neighbourhood Plans

Infrastructure Delivery Plan

Development Management process

Monitoring delivery of green infrastructure and amenity open space provision

Chichester DC

Parish and Town Councils

Developers, Landowners and Local Businesses

Infrastructure providers

S22 – Historic Environment

Conserve or enhance heritage assets within the plan area

Local Plan

Neighbourhood Plans

Development Management process

Character Appraisals for Conservation Areas

Monitoring decisions on planning applications and appeals affecting heritage assets at risk

Number of designated heritage assets and number and proportion of heritage assets at risk. (from CDC)

Conservation area appraisals

Chichester DC

Parish Councils

Historic England

S23 – Transport and Accessibility

Improve accessibility to key services and facilities through better integrated transport network

Local Plan

Neighbourhood Plans

IDP

Development Management process

Record of transport infrastructure projects committed or completed

Estimated traffic flow for all vehicle types

Percentage of residents who travel to work on foot or cycle; by public transport and by car

Chichester DC

West Sussex CC

Highways England

Infrastructure providers

S24 - Countryside

Restrict development outside of settlement boundaries to countryside uses

Local Plan

Neighbourhood Plans

Development Management process

Monitor number of permissions granted outside settlement boundaries

Chichester DC

West Sussex CC

S25 – The Coast

Protect and enhance coastal areas

Local Plan

Neighbourhood Plans

Chichester Harbour Conservancy Harbour Management Plan

Development Management process

Percentage of SSSI land in favourable condition in coastal area

Changes in areas of biodiversity importance in coastal area

Completions of leisure/recreational development in coastal area

Number of new moorings/slipways/boat storage facilities completed in coastal area

Marine employment development completed

Chichester DC

Parish Councils

Chichester Harbour Conservancy

Landowners and Local Businesses

S26 - Natural Environment

Protect and enhance natural environment

Local Plan

Neighbourhood Plans

Development Management process

Percentage of SSSI land in favourable condition

Changes in areas of biodiversity importance

Area of Best and Most Versatile agricultural land


S27 – Flood Risk Management

Zero permission granted contrary to Environment Agency advice

Local Plan

Development Management process

Number of planning permissions granted contrary to Environment Agency advice on flooding and water quality grounds

Number of houses at risk of flooding (from the Environment Agency and Strategic Flood Risk Assessment)

Chichester DC

Developers and Landowners

Environment Agency

S28 - Pollution

Protect or improve amenities and environment. Mitigate possible impacts of development

Local Plan

Development Management process

Monitor number of permissions for air quality sensitive development granted within Air Quality Management Areas

Chichester DC

Developers and Landowners

S29 – Green Infrastructure

Reinforce and enhance role of green infrastructure

Local Plan

Site Allocations DPD

IDP

Neighbourhood Plans

Development Management process

Monitoring number of major development schemes which provide long term agreement to maintain and enhance green infrastructure network in vicinity of site

Chichester DC

West Sussex CC

Sussex Wildlife Trust

Parish and Town Councils

Developers and Landowners

S30 – Strategic Wildlife Corridors

Protect or enhance strategic wildlife corridors

Local Plan

Neighbourhood Plans

Development Management process

Monitor number of permissions granted within strategic wildlife corridors

Chichester DC

Parish Councils

Developers and Landowners

S31 – Wastewater in the Chichester Harbour and Pagham Harbour Wastewater Treatment Catchment areas

Protect water quality within the Chichester Harbour and Pagham Harbour catchment areas

Local Plan

Neighbourhood Plans

Development Management process

Monitor number of planning applications approved contrary to EA advice

Percentage of water bodies assessed as good ecological status

Percentage of water bodies assessed as good chemical status (Environment Agency)

Daily domestic water use

Annual average NO2 data from selected sites in the District (CDC data)

Chichester DC

Parish Councils

Environment Agency

S32 – Design Strategies for Strategic and Major Development Sites

Promote a design strategy for all major development incorporating local infrastructure requirements

Local Plan

Neighbourhood Plans

Site Allocations DPD

Design and Access Statements

Development Management process

Monitoring decisions on planning applications and appeals with regards to design and access statements

Chichester DC

Parish Councils

West Sussex CC

Developers and Landowners

Infrastructure providers

Strategic Housing Sites

SA1: Land West of Chichester

SA2: Land at Shopwyke (Oving Parish)

SA3: Land East of Chichester

SA4: Land at Westhampnett/North East Chichester

SA5: Southern Gateway

SA6: Land South-West of Chichester (Apuldram and Donnington Parishes)

SA7: Highgrove Farm, Bosham

SA8: East Wittering Parish

SA9: Fishbourne Parish

SA10: Chidham and Hambrook Parish

SA11: Hunston Parish

SA12: Land North of Park Farm, Selsey

SA13: Southbourne Parish

SA14: Land West of Tangmere

SA15: Land at Chichester Business Park, Tangmere

As per policy requirements

Local Plan

Neighbourhood Plans

Development Management process

Amount of dwellings/ employment floorspace delivered

Net affordable housing completions

Chichester DC

Parish Councils

West Sussex CC

Developers and Landowners

Infrastructure providers