8.17

Showing comments and forms 1 to 5 of 5

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 3864

Received: 01/03/2023

Respondent: Mr Michael Wright

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

Rejuventation of local bus services and connection to rail is urgently required. This probably cannot be achieved with low density scattered residential development

Full text:

Rejuventation of local bus services and connection to rail is urgently required. This probably cannot be achieved with low density scattered residential development

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4131

Received: 14/03/2023

Respondent: Mr Matthew Rees

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Not sound because fails to evaluate sustainability appraisal (p89) statement: "important high level concern is the lack of a train station at Tangmere", and not legally compliant because Tl contains no assessment of whether a train station between Barnham and Chichester could support sustainable development and provide necessary strategic infrastructure in a timely way. May be non-compliant with Duty to Cooperate as the statement of compliance indicates a failure to take reasonable steps to engage with ORR (p52), which is not justified and the Infrastructure Delivery Plan excludes any consideration of a rail station, so there is a lack of evidence proportionate to the issue.

Change suggested by respondent:

Amend the plan as follows:
8.17 To redress the lack of response from the ORR in February 2019 and lack of any evidence of any other engagement (as noted in the Duty to Cooperate statement of compliance, page 52) the Council will make renewed efforts to engage with the ORR, Network Rail and train operators with the aim of gaining a firm commitment for the reinstatement of the train stop between Tangmere and Oving on the existing line. The council will work with these organisations and local stakeholders to facilitate improvements to the accessibility of railway stations and provision of new station stops and other strategic infrastructure to be available on a predict and provide basis. The council also works closely with bus operators to improve their services in and through the plan area.

Tangmere Station — site option 1 (preferred): Woodhorn Lane, access from Oving road. This is located approximately 1800m from the museum, with the benefit of adjacent land on both sides of the line and an existing level crossing. The site to the north of the track could repurposed for bus interchange, secure bike storage and bus station. Site access could be improved for pedestrian / cycle via a cost effective access to the disused airfield perimeter near the junction between Woodhorn Lane and Church Lane Oving.

Tangmere Station — site option 2: adjacent to Chichester Flood Relief Channel, access via Oving Road. This site has the benefit of existing structures at the side of the line and a disused agricultural property which could be reused for station facilities. This site also has space on both sides of the line. Train passing through the site shows that there is plenty of space for a full length station for services at this site.

**See also annotated images provided within attached document**

Full text:

There is much to commend in this document and the supporting technical documents that accompany it, and I have listed in the appendix to this letter 26 such paragraphs and policies. I am happy for my support to be registered against these sections of your consultation document. There is also much upon which I must represent a concern, so I attach representations relating to 22 paragraphs or policies.

I am happy to participate in a hearing session, and I would flag at this stage that the common theme that links all of these representations is the need to safeguard the natural and built environment in and around Saxon Meadow, Tangmere from the risks of unsustainable development, I consider that the independent examiner should focus their review on the aspects of the local plan that relate to this matter.

Appendix 1: list of policies that I support
1. P14, 1.23, 1.24: Duty to cooperate
2. P24, para 2.30 "the council declared a climate emergency in July 2019"
3. P24, para 2.32 — "all proposal for new development should be considered in the context of a climate emergencV'
4, P30: Objective 2: natural environment: "development will achieve net gains in biodiversity'
5. P43, 4.1 "National policy promotes increasing energy efficiency, the minimisation of energy consumption and the development of renewable energy sources"
6. P43, 4.3: "Some renewable energy projects provide significant opportunities to enhance biodiversitV'
7. P53, Policy NE5: Biodiversity and Biodiversity Net Gain
8. P62, Para 4.42: Hedgerows and some types of woodlands are identified as a priority habitat
9, P62, Policy NE8: Proposals should have a minimum buffer zone of 15 metres from the boundary of ancient woodland or veteran trees to avoid rood damage (known as the root protection area)
10. P68, Policy NEIO: Criteria for Development in the Countryside - Does not prejudice viable agricultural operations or other viable uses
11. P80, Para 4.91: There are serious concerns about the impact of flooding, both in respect of current properties at risk but also the long-term management of the area.
12. 4.92: any development in the plan area must therefore have regard to flood and erosion risk.
13. 4.94: built development can lead to increased surface water run-off; therefore, new development should include SuDS to help cope with intense rainfall events
14. P81, Para 4.96: Environment Agency consent is required for any works within 16 m of tidal waters and 8m of fluvial watercourses in line with the Environmental Permitting Regulations 2016. This strip is required for access. The policy includes a setback requirement to ensure this access strip is not obstructed.
15. P80, 4.92, Any development in the plan area must therefore have regard to flood and erosion risk, now and in the future, by way of location and specific measures, such as additional flood alleviation, which will protect people, properties and vulnerable habitats from flooding. Recent changes to national guidance highlight the importance of considering flood risk from all sources, and this is particularly significant for the plan area as large parts of it are at risk from groundwater flooding, which needs to be recognised in development decisions alongside the well-established risks in relation to tidal, fluvial and surface water flooding. Appropriate mapping of all sources of flood risks is still evolving, and is likely to develop further over the plan period
16. P93, Policy NE20 Pollution: Development proposals must be designed to protect, and where possible, improve upon the amenities of existing and future residents, occupiers of buildings and the environment generally. Development proposals will need to address the criteria contained in, but not limited to, the policies concerning water quality; flood risk and water management; nutrient mitigation; lighting; air quality; noise; and contaminated land. Where development is likely to generate significant adverse impacts by reason of pollution, the council will require that the impacts are minimised and/or mitigated to an acceptable level within appropriate local/national standards, guidance, legislation and/or objectives.
17, P94, 4.127, Light pollution caused by excessive brightness can lead to annoyance, disturbance and impact wildlife, notably nocturnal animals. The design of lighting schemes should be carefully considered in development proposals to prevent light spillage and glare.
18. P94, 4.128, Dark skies are important for the conservation of natural habitats, cultural heritage and astronomy. The plan area includes three 'Dark Sky Discovery Site' designations, all located within the Chichester Harbour AONB; Eames Farm on Thorney Island, Maybush Copse in Chidham; and north of the John Q Davis footpath in West Itchenor. Development within or directly impacting these areas will be subject to particular scrutiny in terms of their impact on dark skies. The entire SDNPA area is also declared as an International Dark Sky Reserve. Development directly impacting this area will be subject to similar scrutiny.
19. P96, Policy NE22 Air Quality
20. P97, Policy NE-23 Noise
21. P142, Para 6.29, Amenity: Private space, shared space and the design quality and construction of communal spaces all contribute to amenity
22. P155-6, Policy P11:Conservation Areas "protecting the setting (including views into and out of the area)"
23, P55, Para 4.26 - The council is under a legal duty to protect designated habitats, by ensuring that new development does not have an adverse impact on important areas of nature conservation, and by requiring mitigation to negate the harm caused.
24. P58, Para 4.33 The council is under a legal duty to protect their designated bird populations and supporting habitats
25. P95, Para 4.129 The council has a duty to review and assess air quality within the district
26. P301, Conservation Area: An area of special architectural or historic interest, designated under the Planning (Listed Buildings & Conservation Areas) Act 1990. There is a statutory duty to preserve or enhance the character, appearance, or setting of these areas.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4205

Received: 15/03/2023

Respondent: Chidham and Hambrook Parish Council

Legally compliant? Yes

Sound? Yes

Duty to co-operate? Yes

Representation Summary:

17 What is this going to deliver and when will it be delivered? What outcomes can residents expect? Shouldn’t consultation already have been carried out with local transport providers? We need to have oversight of the negotiations with rail and bus operators The volume of housing proposed in this plan and the desire to move more and more people away from using their cars makes having an economic efficient and regular bus and train service an absolute necessity.

Change suggested by respondent:

.

Full text:

17 What is this going to deliver and when will it be delivered? What outcomes can residents expect? Shouldn’t consultation already have been carried out with local transport providers? We need to have oversight of the negotiations with rail and bus operators The volume of housing proposed in this plan and the desire to move more and more people away from using their cars makes having an economic efficient and regular bus and train service an absolute necessity.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5475

Received: 17/03/2023

Respondent: Mayday! Action Group

Number of people: 8

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

This leads us to question exactly how much regular dialogue CDC has with essential transport providers. CDC must surely realise that without significantly improved rail and bus services, expansion cannot be achieved. District residents expect to be told on a regular basis the content and status of discussions with organisations such as Network Rail and Stagecoach. The housing numbers contained in this Draft Local Plan should be based on known (now!) deliverable improvements in train and bus services. The inference here is that CDC have not been doing this essential work and without efficient, regular bus and train services the dream will become a living nightmare.

Full text:

Executive Summary

The Local Plan as written lacks ambition and vision, and will be detrimental to the landscape within which the district lies. It is a plan borne out of a need to produce a legal document which will satisfy the regulatory authorities. In terms of Urban Planning it fails “To meet the needs of the present without compromising the ability of future generations to meet their own needs” (NPPF).

The development that will consequentially arise from the deployment of such a made Local Plan is not sustainable. It will adversely affect the Character, Amenity and Safety of the built environment, throughout our district.

In particular, the Local Plan is inadequate for the needs of the people in the district both at present and in the future because –

1. It has been written in advance of the District having a properly formed and agreed Climate Emergency Action Plan. It is inconceivable that such a key document will not shape our Local Plan. It is this Action Plan that is needed first in order to provide the long-term strategic view as to how and what the District will look like in the future; this, in turn, will help form and shape the policies outlined in any prospective, Local Plan. The Plan as proposed is moribund, as a result of “cart before the horse” thinking.

2. The Local Plan as written does not adequately address how infrastructure, transport and services are going to be materially and strategically improved to meet the predicted growth and shift to a significantly ageing population. There is presently insufficient capacity to supply services and to have adequate people and environmentally friendly connectivity, as a direct result of decades of neglect towards investing in infrastructure and services to meet the needs of the District’s population. We are led to believe that developers through increased levies in order to gain permission to build will fulfil this need, but all that this will result in is an uncoordinated, dysfunctional mess completely lacking in any future-proof master planning approach. We contend that this will do nothing for the quality of life of Chichester District residents and it will create a vacuum whereby few if indeed any can be held accountable or indeed found liable for shortcomings in the future.

3. The Local Plan as written does not state how it will go about addressing the need to create affordable homes. The District Council’s record on this matter since the last made plan has been inadequate and now the creation of affordable homes has become urgent as political/economic/social factors drive an ever increasing rate of change within the District.

4. Flood risks assessments used in forming the Plan are out of date (last completed in 2018) and any decision to allocate sites is contrary to Environment Agency policy. Additionally, since March 2021 Natural England established a position in relationship to ‘Hold the Line’ vs. ‘Managed Retreat’ in environmentally sensitive areas, of which the Chichester Harbour AONB is a significant example. CDC have failed to set out an appropriate policy within the proposed Local Plan that addresses this requirement.

5. The A27 needs significant investment in order to yield significant benefits for those travelling through the East-West corridor; this is unfunded. Essential improvements to the A27 are key to the success of any Local Plan particularly as the city’s ambitions are to expand significantly in the next two decades. But any ambitions will fall flat if the A27 is not improved before such plans are implemented.. The A259 is an increasingly dangerous so-called ‘resilient road’ with a significant increase in accidents and fatalities in recent years. In 2011, the BBC named the road as the “most crash prone A road” in the UK. There is nothing in the Local Plan that addresses this issue. There is no capacity within the strategic road network serving our district to accommodate the increase in housing planned, and the Local Plan does not guarantee it.

6. There is insufficient wastewater treatment capacity in the District to support the current houses let alone more. The tankering of wastewater from recent developments that Southern Water has not been able to connect to their network and in recent months the required emergency use of tankers to pump out overflowing sewers within our City/District reflects the gross weakness of short-termism dominated thinking at its worst and is an indictment of how broken our water system is. The provision of wastewater treatment is absolutely critical and essential to the well-being of all our residents and the long-term safety of our built environment. The abdication by those in authority, whether that be nationally, regionally or locally, is causing serious harm to the people to whom those in power owe a duty of care and their lack of urgency in dealing properly with this issue is seriously jeopardizing the environment in which we and all wildlife co-exist.

7. Settlement Boundaries should be left to the determination of Parish Councils to make and nobody else. The proposed policy outlined in the Local Plan to allow development on plots of land adjacent to existing settlement boundaries is ill-conceived and will lead to coalescence which is in contradiction of Policy NE3.

8. All the sites allocated in the Strategic Area Based Policies appear to be in the majority of cases Greenfield Sites. The plan makes little, if any reference to the development of Brownfield sites. In fact, there is not a Policy that relates to this source of land within the Local Plan as proposed. Whilst in the 2021 HELAA Report sites identified as being suitable for development in the District as being Brownfield sites were predicted to yield over 4000 new dwellings. Why would our Local Plan not seek to develop these sites ahead of Greenfield sites?

9. The Local Plan does not define the minimum size that a wildlife corridor should be in width. What does close proximity to a wildlife corridor mean? How can you have a policy (NE 4) that suggests you can have development within a wildlife corridor? These exceptions need to have clear measures and accountability for providing evidence of no adverse impact on the wildlife corridor where a development is proposed. Our view is quite clear. Wildlife and indeed nature in the UK is under serious and in the case of far too many species, potentially terminal threat. Natural England has suggested that a Wildlife Corridor should not be less than 100metres wide. The proposed Wildlife Corridors agreed to by CDC must be enlarged and fully protected from any development. This is essential and urgent for those Wildlife Corridors which allow wildlife to achieve essential connectivity between the Chichester Harbour AONB and the South Downs National Park.

10. Biodiversity Policy NE5 - This is an absolute nonsense. If biodiversity is going to be harmed there should be no ability to mitigate or for developers to be able to buy their way out of this situation. This mindset is exactly why we are seeing a significant decline in biodiversity in the District which should be a rich in biodiversity area and why the World Economic Forum Report (2023) cites the UK as one of the worst countries in the world for destroying its biodiversity.

11. In many cases as set out in the Policies the strategic requirements lack being SMART in nature – particularly the M Measurable. These need to be explicit and clear: “you get what you measure”.

12. 65% of the perimeter of the District of Chichester south of the SDNP is coastal in nature. The remainder being land-facing. Policy NE11 does not sufficiently address the impact of building property in close proximity to the area surrounding the harbour, something acknowledged by the Harbour Conservancy in a published report in 2018 reflecting upon how surrounding the harbour with housing was detrimental to it long-term health. And here we are 5 years on and all of the organizations that CDC are saying that they are working in collaboration with, to remedy the decline in the harbour’s condition, are failing to implement the actions necessary in a reasonable timescale. CDC are following when they should be actually taking the lead on the issue. Being followers rather than leaders makes it easy to abdicate responsibility. There must be full and transparent accountability.

13. The very significant space constraints for the plan area must be taken into account. The standard methodology need no longer apply where there are exceptional circumstances and we are certain that our District should be treated as a special case because of the developable land area is severely reduced by the South Downs National Park (SDNP) to the north and the unique marine AONB of Chichester Harbour to the south. A target of 535dpa is way too high. This number should be reduced to reflect the fact that only 30% of the area can be developed and much of that is rural/semi-rural land which provides essential connectivity for wildlife via a number of wildlife corridors running between the SDNP and the AONB. Excessive housebuilding will do irretrievable damage to the environment and lead to a significant deterioration in quality of life for all who reside within the East / West corridor.

14. Many of the sites identified in the Strategic & Area Based Policies could result in Grade 1 ^ 2 farmland being built upon. The UK is not self-sufficient in our food security. It is short-sighted to expect the world to return to what we have come to expect. Our good quality agricultural land should not all be covered with non-environmentally friendly designed homes.

Attachments:

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5912

Received: 17/03/2023

Respondent: GoVia Thameslink Railway

Representation Summary:

8.17 Very welcome, and the standard required of the proposed accessibility to railway stations is outlined elsewhere within this consultation response.

Full text:

See attached.