Chichester Local Plan 2021 - 2039: Proposed Submission
Search representations
Results for Donnington Parish Council search
New searchObject
Chichester Local Plan 2021 - 2039: Proposed Submission
8.10
Representation ID: 4049
Received: 14/03/2023
Respondent: Donnington Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
CATM model calibrated and validated using 2014 data not taking account of developments such as Chichester Free School adjacent to A27 Whyke roundabout. Transport assessment states "all junctions on the A27 Bypass are over capacity in one or both modelled peak hours". Only 28% of traffic growth due to Local Plan development. Improvements only to Fishbourne and Bognor Roundabouts so over capacity issues still remain at other roundabouts. Plan does not effectively mitigate the impact of additional growth and is adding further demand.
Housing number should be further challenged on this basis.
CATM model calibrated and validated using 2014 data not taking account of developments such as Chichester Free School adjacent to A27 Whyke roundabout. Transport assessment states "all junctions on the A27 Bypass are over capacity in one or both modelled peak hours". Only 28% of traffic growth due to Local Plan development. Improvements only to Fishbourne and Bognor Roundabouts so over capacity issues still remain at other roundabouts. Plan does not effectively mitigate the impact of additional growth and is adding further demand.
The Local Plan Transport Study (2024) explains that the Chichester Area Transport Model (CATM) has been updated by Stantec to investigate travel patterns in and around the Chichester area. This included taking account of changes in response to the policies and strategy of the emerging Chichester Local Plan
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
8.13
Representation ID: 4056
Received: 14/03/2023
Respondent: Donnington Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Improvements to the A27 contentious locally. RIS 1 consultation in 2016 resulted in no consensus . Local Plan consultation 2018, generated significant feedback particularly regarding restricting local movements at key junctions and the Stockbridge Link Road, where the proposals were similar to those options robustly rejected in the RIS 1 consultation. No details provided on representative selection for TIMG, nor how local residents will be consulted on the delivery of any changes as part of the monitor and manage process. Could present an opportunity for circumventing legitimate local concerns and feedback on any proposals to be delivered under this group.
Better explanation of the setup and selection of group members and clear detail around the accountability of the group to members of District and County Council and members of the public should be included in the Local Plan.
Improvements to the A27 contentious locally. RIS 1 consultation in 2016 resulted in no consensus . Local Plan consultation 2018, generated significant feedback particularly regarding restricting local movements at key junctions and the Stockbridge Link Road, where the proposals were similar to those options robustly rejected in the RIS 1 consultation. No details provided on representative selection for TIMG, nor how local residents will be consulted on the delivery of any changes as part of the monitor and manage process. Could present an opportunity for circumventing legitimate local concerns and feedback on any proposals to be delivered under this group.
i) The strategy set out in Policy T1 involves a strategy of potential A27 junction improvements and modal shift measures.
ii) The Transport Infrastructure Management Group (TIMG) has been set up and membership of this group includes representatives from Chichester District Council, West Sussex County Council and National Highways
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
8.14
Representation ID: 4058
Received: 14/03/2023
Respondent: Donnington Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Significant issues with delivery of the Stockbridge Link Road including:
*Building next to an AONB, SSSI, Ramsar site
*Link road would be intrusive/out of keeping with the area as it would need to be over 3m high to cross a flood plain
*Insufficient impact studies on consequences of building on the flood plain
*Impact on noise/air pollution considering prevailing south westerly winds
*Impact of road on biodiversity net gain target in local plan - removal of fertile farmland
Removal of plans for Stockbridge Link Road or much better assessment of the impact of the road before it is included in the Local Plan
Significant issues with delivery of the Stockbridge Link Road including:
*Building next to an AONB, SSSI, Ramsar site
*Link road would be intrusive/out of keeping with the area as it would need to be over 3m high to cross a flood plain
*Insufficient impact studies on consequences of building on the flood plain
*Impact on noise/air pollution considering prevailing south westerly winds
*Impact of road on biodiversity net gain target in local plan - removal of fertile farmland
The strategy set out in Policy T1 involves a strategy of sustainable transport and active travel interventions, as well as the potential for works to junctions on the Strategic Road Network. Any junction improvements or new roads could only come forward following detailed assessment and design work
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
8.11
Representation ID: 4060
Received: 14/03/2023
Respondent: Donnington Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Figure 7.4 Bognor Road and Vinnetrow Road Combined Concept scheme - insufficient detail.
Figure 7.7 A250 Cathedral Way/Fishbourne Road/Terminus Road proposed mitigation "Removal of existing traffic islands to facilitate all movement crossroad junction" compromises safe access to eg supermarket
Figure 7.3 No detailed figure of the Fishbourne roundabout mitigation itself. Figure includes Stockbridge Link Road which is NOT part of the submission as it is not funded.
If the transport assessment does not have correct diagrams, does this reflect a wider issue with the document not supporting the content of the Local Plan submission?
7.4 does not show or explain the impact to Chichester/Bognor Cycle Path. Has the impact of sustainable travel been considered as part of the mitigation?
7.7 Impact on pedestrian safety should be considered and explained
7.3 Correct the figure and remove the SLR.
Revisit the Assessment for consistency with the plan
Figure 7.4 Bognor Road and Vinnetrow Road Combined Concept scheme - insufficient detail.
Figure 7.7 A250 Cathedral Way/Fishbourne Road/Terminus Road proposed mitigation "Removal of existing traffic islands to facilitate all movement crossroad junction" compromises safe access to eg supermarket
Figure 7.3 No detailed figure of the Fishbourne roundabout mitigation itself. Figure includes Stockbridge Link Road which is NOT part of the submission as it is not funded.
If the transport assessment does not have correct diagrams, does this reflect a wider issue with the document not supporting the content of the Local Plan submission?
The description of the junction improvement work and the diagrams provided within Local Plan Transport Study (2024) have been undertaken at a high-level as proportionate evidence to support the preparation of the Local Plan. Further detailed technical and design work would be required prior to the implementation of any of the works identified.
The Transport Study 2024 sets out the options for proposed mitigation, which will be taken forward and developed further by the TIMG, through a monitor and manage process
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
Policy NE16 Water Management and Water Quality
Representation ID: 4072
Received: 14/03/2023
Respondent: Donnington Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Apuldram WwTW is already currently inadequate per CDC's own admission. Southern Gateway Strategic Allocation AL5 drains to Apuldram WwTW. There are environmental constraints which restrict its capacity to accommodate any further development. Concern about permitting more homes before upgrades to infrastructure are complete. Clear these are necessary for housing growth whilst maintaining and improving water quality of receiving waters. Recent flooding illustrates urgency of upgrades. Southern Water's plans are optimistic and we have concerns this will actually be delivered within 10 years. Across the district the lack of sewage provision is set to worsen until the substantial improvements are delivered.
No further development until the necessary infrastructure improvements are delivered.
Apuldram WwTW is already currently inadequate per CDC's own admission. Southern Gateway Strategic Allocation AL5 drains to Apuldram WwTW. There are environmental constraints which restrict its capacity to accommodate any further development. Concern about permitting more homes before upgrades to infrastructure are complete. Clear these are necessary for housing growth whilst maintaining and improving water quality of receiving waters. Recent flooding illustrates urgency of upgrades. Southern Water's plans are optimistic and we have concerns this will actually be delivered within 10 years. Across the district the lack of sewage provision is set to worsen until the substantial improvements are delivered.
The policy as drafted requires that development is phased to align with delivery of wastewater treatment infrastructure where this is needed, and that water quality is protected.
In relation to Apuldram, this policy requires development at Southern Gateway to demonstrate no net increase in flows to Apuldram
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
Policy H1 Meeting Housing Needs
Representation ID: 4134
Received: 14/03/2023
Respondent: Donnington Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
CATM model calibrated and validated using 2014 data not taking account of developments such as Chichester Free School adjacent to A27 Whyke roundabout. Transport assessment states "all junctions on the A27 Bypass are over capacity in one or both modelled peak hours". Only 28% of traffic growth due to Local Plan development. Improvements only to Fishbourne and Bognor Roundabouts so over capacity issues still remain at other roundabouts. Plan does not effectively mitigate the impact of additional growth and is adding further demand.
Housing number should be further challenged on this basis.
CATM model calibrated and validated using 2014 data not taking account of developments such as Chichester Free School adjacent to A27 Whyke roundabout. Transport assessment states "all junctions on the A27 Bypass are over capacity in one or both modelled peak hours". Only 28% of traffic growth due to Local Plan development. Improvements only to Fishbourne and Bognor Roundabouts so over capacity issues still remain at other roundabouts. Plan does not effectively mitigate the impact of additional growth and is adding further demand.
The proposed modifications to Policy T1 Transport Infrastructure set out the council’s approach to securing transport mitigation to support the planned growth.
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
Policy A5 Southern Gateway – Police Field, Kingsham Road
Representation ID: 6097
Received: 14/03/2023
Respondent: Donnington Parish Council
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Apuldram WwTW is already currently inadequate per CDC's own admission. Southern Gateway Strategic Allocation AL5 drains to Apuldram WwTW. There are environmental constraints which restrict its capacity to accommodate any further development. Concern about permitting more homes before upgrades to infrastructure are complete. Clear these are necessary for housing growth whilst maintaining and improving water quality of receiving waters. Recent flooding illustrates urgency of upgrades. Southern Water's plans are optimistic and we have concerns this will actually be delivered within 10 years. Across the district the lack of sewage provision is set to worsen until the substantial improvements are delivered.
No further development until the necessary infrastructure improvements are delivered
Apuldram WwTW is already currently inadequate per CDC's own admission. Southern Gateway Strategic Allocation AL5 drains to Apuldram WwTW. There are environmental constraints which restrict its capacity to accommodate any further development. Concern about permitting more homes before upgrades to infrastructure are complete. Clear these are necessary for housing growth whilst maintaining and improving water quality of receiving waters. Recent flooding illustrates urgency of upgrades. Southern Water's plans are optimistic and we have concerns this will actually be delivered within 10 years. Across the district the lack of sewage provision is set to worsen until the substantial improvements are delivered.
Point 14 of the policy sets out that development may need to be phased to ensure adequate wastewater capacity is available. Policy NE16 sets out that development in the Apuldram catchment must comply with the Apuldram Position Statement and must result in no net increase in flows to the sewer network of the Apuldram WwTW.