Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4060

Received: 14/03/2023

Respondent: Donnington Parish Council

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Figure 7.4 Bognor Road and Vinnetrow Road Combined Concept scheme - insufficient detail.
Figure 7.7 A250 Cathedral Way/Fishbourne Road/Terminus Road proposed mitigation "Removal of existing traffic islands to facilitate all movement crossroad junction" compromises safe access to eg supermarket
Figure 7.3 No detailed figure of the Fishbourne roundabout mitigation itself. Figure includes Stockbridge Link Road which is NOT part of the submission as it is not funded.
If the transport assessment does not have correct diagrams, does this reflect a wider issue with the document not supporting the content of the Local Plan submission?

Change suggested by respondent:

7.4 does not show or explain the impact to Chichester/Bognor Cycle Path. Has the impact of sustainable travel been considered as part of the mitigation?
7.7 Impact on pedestrian safety should be considered and explained
7.3 Correct the figure and remove the SLR.

Revisit the Assessment for consistency with the plan

Full text:

Figure 7.4 Bognor Road and Vinnetrow Road Combined Concept scheme - insufficient detail.
Figure 7.7 A250 Cathedral Way/Fishbourne Road/Terminus Road proposed mitigation "Removal of existing traffic islands to facilitate all movement crossroad junction" compromises safe access to eg supermarket
Figure 7.3 No detailed figure of the Fishbourne roundabout mitigation itself. Figure includes Stockbridge Link Road which is NOT part of the submission as it is not funded.
If the transport assessment does not have correct diagrams, does this reflect a wider issue with the document not supporting the content of the Local Plan submission?