Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5932

Received: 17/03/2023

Respondent: GoVia Thameslink Railway

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

1. Has not happened. What has been built is car based and not sustainable urban extension of Chichester City which urgently needs to be addressed.
4. has already been delivered
5. not strong enough “Make provision” does not mean it will be built, this is critical
“Foot//cycle bridge will be built following the desire line across the A27 south of Portfield roundabout, and near or at the Oving Road junction and foot cycle bridge will be built following the desire line across the A27 to Coach Road. These should have been built before first occupation and it is critical and urgent that they are built quickly”.
6. New and improved walking and cycle routes that are continuous, direct, safe, attractive, comfortable walking and cycle route will be provided linking the site with Chichester City Centre and Railway station. These should have been built before first occupation and it is critical and urgent that they are built quickly, and linking the site with Westhampnett, Oving, Tangmere, and the South Downs National Park”

Full text:

See attached.