Object
Chichester Local Plan 2021 - 2039: Proposed Submission
Representation ID: 4695
Received: 17/03/2023
Respondent: Mrs Maureen Chaffe
Legally compliant? No
Sound? No
Duty to co-operate? Yes
There has been no consultation with parishes over the revised Parish Housing Requirements. Whilst the situation on the Manhood Peninsula is accepted there are equal issues in Boxgrove with over capacity on the A27, flooding and drainage issues , capacity at the local school and general lack of facilities.
Most of the sites in the 2021 HELAA were previously considered by CDC to be not suitable for development yet they are now considered to be so. There is no rationale for this decision. The Boxgrove NP is undergoing review and should be allowed to determine what is deliverable in the Parish not given an arbitrary housing number with no evidence to support its delivery.
There has been no consultation with parishes over the revised Parish Housing Requirements. Whilst the situation on the Manhood Peninsula is accepted there are equal issues in Boxgrove with over capacity on the A27, flooding and drainage issues , capacity at the local school and general lack of facilities.