Chichester Local Plan 2021 - 2039: Proposed Submission
Search representations
Results for Teren Project Management Ltd search
New searchObject
Chichester Local Plan 2021 - 2039: Proposed Submission
Policy A10 Land at Maudlin Farm
Representation ID: 5689
Received: 17/04/2023
Respondent: Teren Project Management Ltd
Agent: Henry Adams LLP
Legally compliant? Yes
Sound? Yes
Duty to co-operate? Not specified
Request minor amendments be made to allow for level of flexibility so that future development can be aligned with local needs at time of development.
Recognise that specialist accommodation for the elderly is important given the ageing population, flexibility should be included to ensure provision is akin to local need.
Clear that gypsy and traveller plots currently available in other areas of District have not been taken up by Council for allocation (HBI0028). Clear absence of information regarding requirements for pitch provision in localities and site specific needs required to be met. No evidence in respect of engagement with gypsy traveller community in respect of desire to be located on suburban residential sites. Difficult to design suitable means of access within residentail housing estate, no consideration given to how this can be accommodated within such a site. Not appropriate to include gypsy and traveller site provision until further evidence provided on suitability of approach, need in this specific location and suitability as part of housing allocation of this scale, with single point of access. Object to inclusion of allocation for 3 gypsy and traveller plots.
Criterion 5 - Secondary vehicular access unsuitable, although a pedestrian access would connect into existing footpath network to the west.
Allocation references 13.4 hectares but the land available comprises 14.7ha, as detailed in attachment.
request wording at 2nd bullet point be amended to read as follows; ‘Specialist accommodation for older persons, to include a component of care or support, of a form which is appropriate to an evidenced need of the local area.’
Criterion 5 - Request that requirement for secondary access be removed. Whilst vehicular access would not be suitable, a pedestrian access would be and would connect into existing footpath network to the west.
See attached representation.
Support
Chichester Local Plan 2021 - 2039: Proposed Submission
Policy A10 Land at Maudlin Farm
Representation ID: 6254
Received: 17/04/2023
Respondent: Teren Project Management Ltd
Agent: Henry Adams LLP
Support allocation of Land at Maudlin Farm for residential development. The technical work and accompanying Vision Document demonstrate that the site is capable of delivering circa 265 dwellings during the course of the plan period.
See attached representation.