Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 803

Received: 02/02/2019

Respondent: Mrs Fiona Horn

Representation Summary:

No mention of detail traffic infrastructure for southern end of development with 2nd phase. There is no from in Westgate with constraints of school, train line and existing traffic flow. There is no spare capacity to put in a satisfactory road layout for the southern end which means all traffic from the development will have to use St Pauls Rd/ Sherborne road..Unsuitable.Again potentially no school built until 2029 not acceptable. School must go in first. Unless this is adequately addressed in future iterations I will raise this with the examiner at the appropriate time.

Full text:

No mention of detail traffic infrastructure for southern end of development with 2nd phase. There is no from in Westgate with constraints of school, train line and existing traffic flow. There is no spare capacity to put in a satisfactory road layout for the southern end which means all traffic from the development will have to use St Pauls Rd/ Sherborne road..Unsuitable.Again potentially no school built until 2029 not acceptable. School must go in first. Unless this is adequately addressed in future iterations I will raise this with the examiner at the appropriate time.