Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 770

Received: 01/02/2019

Respondent: Mr. Donald Hagell

Representation Summary:

1. With the available infrastructure there are too many houses being proposed for this land.
2. The pollution is already high at Stockbridge and the proposed building work will increase the pollution and noise and do environmental damage, as well as being built on an existing flood plain.
3.The proposed link road will cut across a wildlife corridor and damage the tranquility of the harbour and subsequently the tourist trade on the whole peninsula.
4. There will be huge disruption for years while the building work is done, without there being any viable detours for the high volume of traffic.

Full text:

1. With the available infrastructure there are too many houses being proposed for this land.
2. The pollution is already high at Stockbridge and the proposed building work will increase the pollution and noise and do environmental damage, as well as being built on an existing flood plain.
3.The proposed link road will cut across a wildlife corridor and damage the tranquility of the harbour and subsequently the tourist trade on the whole peninsula.
4. There will be huge disruption for years while the building work is done, without there being any viable detours for the high volume of traffic.