Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 718

Received: 01/02/2019

Respondent: West Itchenor Parish Council

Representation Summary:

It is proposed that the following additional measures are included:
* Replacement of the level crossings in Basin Road and Stockbridge Road by an underpass or bridge.
* Safeguarding of land to enable the expansion of the Chichester railway Station, its tracks and platforms, from 2 to 4 to enable a fast train service
* Safeguarding of land close to the A27 for a future "park and ride"

Full text:

It is proposed that the following additional measures are included:
* Replacement of the level crossings in Basin Road and Stockbridge Road by an underpass or bridge.
* Safeguarding of land to enable the expansion of the Chichester railway Station, its tracks and platforms, from 2 to 4 to enable a fast train service
* Safeguarding of land close to the A27 for a future "park and ride"