Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 3848

Received: 25/02/2023

Respondent: Mrs Deborah Speirs

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

The council is assuming the current capacity of the A27 is a permanent constraint which is not sound rationale. The M27 was originally designed to run from Cadnam through to West Sussex but currently stops at Portsmouth. If the A27 was enlarged and capacity increased then the council could accommodate any unmet need within the south of the district rather than the north. I presume this is a question of money rather than sound logic. It must be preferable to build houses in more urban areas around the existing A27 than green field sites around northern villages.

Change suggested by respondent:

To include reference to housing projections in the south of the district if A27 was enlarged.

Full text:

The council is assuming the current capacity of the A27 is a permanent constraint which is not sound rationale. The M27 was originally designed to run from Cadnam through to West Sussex but currently stops at Portsmouth. If the A27 was enlarged and capacity increased then the council could accommodate any unmet need within the south of the district rather than the north. I presume this is a question of money rather than sound logic. It must be preferable to build houses in more urban areas around the existing A27 than green field sites around northern villages.