Object
Local Plan Review: Preferred Approach 2016-2035
Representation ID: 3447
Received: 06/02/2019
Respondent: Jennifer Berriman
Representation Summary:
200 extra house being built in our rural village will mean an increase in traffic using the already very busy B2145. Medical and front line services will take longer to reach those in need.
Full text:
200 extra house being built in our rural village will mean an increase in traffic using the already very busy B2145. Medical and front line services will take longer to reach those in need.