Local Plan Review: Preferred Approach 2016-2035

Representation ID: 333

Received: 23/01/2019

Respondent: Mr Paul Sansby

Representation Summary:

Why was the housing allowed to be completed before the new footbridge is provided? I thought this was a condition of development along with closing the Oving lights junction and improvements to the A27. In the latest plans the footbridge appears to have moved to Coach Road and the Portfield crossing is at road level. These do not provide safe routes to the new secondary school or the existing primary schools.

Full text:

Why was the housing allowed to be completed before the new footbridge is provided? I thought this was a condition of development along with closing the Oving lights junction and improvements to the A27. In the latest plans the footbridge appears to have moved to Coach Road and the Portfield crossing is at road level. These do not provide safe routes to the new secondary school or the existing primary schools.