Comment
Local Plan Review: Preferred Approach 2016-2035
Representation ID: 308
Received: 22/01/2019
Respondent: Mr Robert Styles-Forsyth
You do realise the River Lavant runs through the area as two rivers joining as one.
A drainage ditch runs under the Fishbourne Roundabout.
There is no easy way to get across the A27 by foot to reach the train station.
That a link road would deliver more traffic from the peninsular directly to Fishbourne Roundabout and block the Fishbourne, Portsmouth and Chichester exits.
You do realise the River Lavant runs through the area as two rivers joining as one.
A drainage ditch runs under the Fishbourne Roundabout.
There is no easy way to get across the A27 by foot to reach the train station.
That a link road would deliver more traffic from the peninsular directly to Fishbourne Roundabout and block the Fishbourne, Portsmouth and Chichester exits.