Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 308

Received: 22/01/2019

Respondent: Mr Robert Styles-Forsyth

Representation Summary:

You do realise the River Lavant runs through the area as two rivers joining as one.
A drainage ditch runs under the Fishbourne Roundabout.
There is no easy way to get across the A27 by foot to reach the train station.
That a link road would deliver more traffic from the peninsular directly to Fishbourne Roundabout and block the Fishbourne, Portsmouth and Chichester exits.

Full text:

You do realise the River Lavant runs through the area as two rivers joining as one.
A drainage ditch runs under the Fishbourne Roundabout.
There is no easy way to get across the A27 by foot to reach the train station.
That a link road would deliver more traffic from the peninsular directly to Fishbourne Roundabout and block the Fishbourne, Portsmouth and Chichester exits.