Local Plan Review: Preferred Approach 2016-2035

Representation ID: 3053

Received: 04/02/2019

Respondent: Mr and Mrs L.G. Cooper

Number of people: 2

Representation Summary:

Present infrastructure is already at saturation point; the most obvious problems being traffic and sewage disposal. Due to the geography of the area (i) the current roads can neither be added to or widened, and (ii) the existing sewerage is mostly inadequate.

We are realists, and accept the inevitable development to come (a total of 300 dwellings) BUT this must be the limit, not just in the short term but for the foreseeable future since, as pointed out above, Bosham's infrastructure is already at saturation as things currently stand.

Full text:

See attachment