The wastewater and sewage system is already groaning. Many, many times in the summer months huge MTS 30,000 litre tankers - sometimes two at a time - are pumping sewage out of the mains in East Wittering to relieve the already overloaded system - and still you want to build more houses. This makes no sense.
Full text:
The wastewater and sewage system is already groaning. Many, many times in the summer months huge MTS 30,000 litre tankers - sometimes two at a time - are pumping sewage out of the mains in East Wittering to relieve the already overloaded system - and still you want to build more houses. This makes no sense.