3 Provision of sui....and securing necessary off-site improvements (including highways) to promote sustainable transport options;

The current transport system cannot cope.
The A27 is a disgrace to the city of Chichester; access from the B2145, the 4th busiest B road in the country, and the B2166 is impossible during rush hours. The situation is exacerbated by the Free School leading to long queues back into Husnton on the B2145 and along the B2166 beyond Runcton. The traffic queues, of course, get even worse in the summer. The A27 will be more at a standstill with additional cars and lorries.

Full text:

3 Provision of sui....and securing necessary off-site improvements (including highways) to promote sustainable transport options;

The current transport system cannot cope.
The A27 is a disgrace to the city of Chichester; access from the B2145, the 4th busiest B road in the country, and the B2166 is impossible during rush hours. The situation is exacerbated by the Free School leading to long queues back into Husnton on the B2145 and along the B2166 beyond Runcton. The traffic queues, of course, get even worse in the summer. The A27 will be more at a standstill with additional cars and lorries.