Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1554

Received: 07/02/2019

Respondent: Mr John Davies

Representation Summary:

It is ridiculous to be planning in detail for settlements when the major problem in the area ( the elephant in the room the A27 upgrade) has not been agreed in any way and has not been funded. This must be resolved before progressing to the sort of detail included - for example -in the Transport Study of Strategic Development incorporated here as part of the Local Plan. It is also a nonsense that the Transport Study includes a road (the Fishbourne-Birdham road that was never included in any previous study of the A27 junctions. Remove it!

Full text:

It is ridiculous to be planning in detail for settlements when the major problem in the area ( the elephant in the room the A27 upgrade) has not been agreed in any way and has not been funded. This must be resolved before progressing to the sort of detail included - for example -in the Transport Study of Strategic Development incorporated here as part of the Local Plan. It is also a nonsense that the Transport Study includes a road (the Fishbourne-Birdham road that was never included in any previous study of the A27 junctions. Remove it!