Southbourne Allocation Development Plan Document - Regulation 19 Consultation

Search representations

Results for Chichester Harbour Conservancy search

New search New search

Comment

Southbourne Allocation Development Plan Document - Regulation 19 Consultation

Figure 1 - DPD Boundary

Representation ID: 7571

Received: 15/07/2026

Respondent: Chichester Harbour Conservancy

Representation Summary:

Support is expressed for defining a precise landscape gap east of Southbourne and extending it westwards to include land between the railway line and A259. The vulnerability of this gap is demonstrated in a refused planning application, the Chidham and Hambrook Neighbourhood Plan, landscape studies, and a recent gap assessment. Concerns are raised that recent A259 corridor developments have already reduced important gaps and harmed the setting of Chichester Harbour National Landscape. Defining clear gap boundaries through the DPD is considered necessary to ensure effective protection and compliance with tests of soundness.

Comment

Southbourne Allocation Development Plan Document - Regulation 19 Consultation

Policy SA1 - East of Southbourne

Representation ID: 7572

Received: 15/07/2026

Respondent: Chichester Harbour Conservancy

Representation Summary:

The proposed development location for approximately 800 dwellings and associated facilities is considered the least harmful option to the setting of Chichester Harbour National Landscape, with no objection raised in principle, provided careful design is implemented as per Local Plan Policy A13.

There is concern regarding the lack of a proposed road bridge over the railway line, which is viewed as short-sighted and likely to lead to traffic congestion, noise, and air pollution, adversely affecting both future residents and existing residents of Southbourne.

Comment

Southbourne Allocation Development Plan Document - Regulation 19 Consultation

5.34

Representation ID: 7573

Received: 15/07/2026

Respondent: Chichester Harbour Conservancy

Representation Summary:

The respondent appreciates the Landscape Gap Assessment Update (September 2025) for confirming the relevance of landscape gaps as per Policies NE3 and A13 of the Local Plan.

Concerns are raised regarding the limited incorporation of the Landscape gap assessment findings into the draft DPD, particularly the exclusion of the landscape gap west of Southbourne.

The respondent recommends that the width of the landscape gap to the east should be increased between the A259 and the railway line.

Comment

Southbourne Allocation Development Plan Document - Regulation 19 Consultation

5.50

Representation ID: 7574

Received: 15/07/2026

Respondent: Chichester Harbour Conservancy

Representation Summary:

Development should not be allowed to proceed until the necessary upgrades to the capacity of Thornham Wastewater Treatment Works has been completed.

For instructions on how to use the system and make comments, please see our help guide.