Chichester Local Plan 2021 - 2039: Proposed Submission
Policy S1 Spatial Development Strategy
Representation ID: 5156
Received: 17/03/2023
Respondent: Spiby Partners Ltd
Agent: Henry Adams LLP
Legally compliant? Not specified
Sound? No
Duty to co-operate? No
Understand approach Council has taken in selection of sites to meet 535 dpa but significantly lower than standard method figure of 638 and previously consulted figure of 650 dpa. Paragraphs 5.6.5 and 11.2.3 of Transport Study indicate 700 dpa could be accommodated (in southern plan area) by mitigation proposed for 535 dpa scenario plus additional mitigation at Portfield roundabout. Council do not appear to have considered increased housing requirement could assist with funding necessary highway improvements and this should be further reviewed in order to aim to meet minimum of 638 dpa. Council have failed to provide sufficient justification for not meeting housing need in full and have not suitably considered unmet need from adjoining authorities.
Increase housing number per annum; site proposed as new allocation - see attachment
1 Introduction
1.1 This representation provides a response to the Regulation 19: Local Plan Consultation on
behalf of our client Spiby Partners. The submission covers the general principles of the
Local Plan but has a focus on Land east of Foxbridge Drive and south of the B2145,
Hunston. The land is shown on the attached plan HA Appendix 1: Site Location Plan, and
hereafter referred to as ‘the site’.
1.2 This representation will provide a written responses in relation to the Regulation 19 Local
Plan Consultation which directly relate to the promotion of our client’s land for future
development.
2 Comments on Specific Questions/Tests
2.1 In response to the national planning legislation, this Regulation 19 Local Plan
Consultation invites comments on three specific questions, and is the final consultation
phase, before the Regulation 19 version of the Local Plan is submitted for Examination.
2.2 This representation will respond on these specific questions, and then highlight how our
client’s site could help fulfil the full housing requirement for the District. This could be
through an allocation within the Local Plan or at least through the allocation of numbers
to the Parish, who in turn would select sites through a Neighbourhood Plan allocation.
Is the plan ‘sound’?
2.3 Paragraph 35 of the National Planning Policy Framework defines the tests for soundness
which requires the plan to be positively prepared, justified, effective and consistent with
National Policy. These matters will now be considered in further detail in relation to the
current consultation on the Regulation 19 version of the Local Plan.
Is the plan positively prepared and justified?
2.4 Policy S1: Spatial Strategy, sets out the spatial development strategy for the District and
how the Council will achieve sustainable growth over the plan period. Policy H1: Meeting
Housing Needs sets out the housing target in response to the strategy. Both policies have
been informed by the Sustainability Appraisal (SA) dated January 2023 and the Plan
objectives, which are set out at paragraph 2.5.2 of the SA and the Council’s HEDNA (April
2022).
5
2.5 The SA discusses the potential growth scenarios and confirms two points:
(i) Standard method housing figure for Chichester (excluding South Downs National
Park) is 638 dwellings per annum, or 11,484 in total over the Plan period; and
(ii) The above figure is capped at 40% above the baseline need and that the
uncapped figure is significantly higher than this at 884 dwellings per annum (dpa).
2.6 Of particular note is that point ii. seeks to cap the overall housing increase by no more
than 40% above the previously adopted LP housing figure of 435 dpa. It should be noted
here that the 435 dpa figure within the 2015 Local Plan was below the identified need of
505 dpa. This reduced housing figure was accepted on the basis of an early review, but
this early review did not take place.
2.7 Policy H1 identifies the need for the Plan to make provision for at least 10,350 dwellings
within the plan figure, amounting to 575 dpa. This is lower than both the standard method
figure of 638 dpa and the previously consulted Preferred Approach figure of 650 dpa which
accommodated some unmet need from the South Downs National Park Authority.
2.8 This draft Local Plan seeks to constrain housing numbers due to an alleged capacity
concern along the A27 strategic road network and constraints on Waste Water Treatment
Works. The Council therefore arrive at a constrained housing figure by virtue of the
standard method ‘steps’ and also due to infrastructure capacity.
2.9 The Transport Study (January 2023) is the key document on which the Council rely to
constrain their housing figure to 535 dpa. On review of this document, it is clear that the
Council’s consultants undertook a sensitivity analysis as to whether the core scenario that
supports the 535 dpa position in the local plan could accommodate a higher level of
growth. The conclusion in paragraph 5.6.5 and 11.2.3 of the Transport Study notes that
700 dpa could be accommodated (in the southern plan area) by the mitigation proposed
for the 535 dpa, with some additional (as yet undesigned and not costed), mitigation
works.
2.10 Accordingly, the Council’s own evidence base has undertaken the assessment and
concluded that a higher growth figure could be accommodated on the A27, subject to
appropriate improvement works. Given the testing of the higher growth figure in the
Transport Study, the exceptional circumstances to constrain growth, as set out at
paragraph 60 on the NPPF, do not appear to exist and the Plan could be considered
unsound on this point alone.
2.11 As a result of the above, the SA does not consider a scenario where the Council would
meet its local housing need, nor a scenario where it exceeds its local housing need. This is
6
of relevance given that the previous Local Plan underprovided against the OAN, and when
considering the scale of development expected for adjoining authorities, including the
highly constrained SDNP.
Given that it is not accepted that the A27 capacity matters present a ceiling in terms of
housing delivery, it is not accepted that the Plan and associated SA demonstrate that
reasonable alternatives have been considered. The plan is not therefore positively
prepared, nor is the approach to housing figures justified.
Effective?
2.12 On the basis of the 535 dpa figure, it is considered that the selected areas for growth and
figures are deliverable over the Plan period, however, as set out above, the plan area could
accommodate a greater level of growth.
2.13 It should also be noted that the Plan does rely on the delivery of Neighbourhood Plan
and/or Small Site Allocations DPD. This is set out under Policy H3 in the draft document.
This states the following in terms of delivery:
If draft neighbourhood plans making provision for at least the minimum housing numbers of
the relevant area have not made demonstrable progress the council will allocate sites for
development within a development plan document in order to meet the requirements of this
Local Plan.
2.14 The above is not precise and does not provide any clear timetable for delivery within the
Plan period. Whilst the comments are noted above that the Plan could be effective, the
Local Plan needs to give a clear timescale for completion of the Supplementary
Development Plan Documents in order to help ensure it is completed.
Is the plan consistent with National Policy?
2.15 On the basis of the comments above, the approach to selected sites for allocation based
on the 535 dpa figure is considered to be consistent, however, due to the lack of evidence
to demonstrate that the 535 dpa figure should be capped due to the A27 capacity points
raised, the draft Plan does not appear to meet the exceptional circumstances allowed for
at paragraph 61 of the NPPF to justify the alternative approach. The Plan as proposed is
therefore inconsistent with NPPF when read as a whole.
3 Duty to Cooperate
3.1 Paragraph 24 of the NPPF outlines the need for co-operation between local planning
authorities on strategic matters that cross administrative boundaries.
7
3.2 The draft Plan does not address any need requirements in relation to unmet housing need
of neighbouring authorities. Nor does it contain evidence to suggest that these matters
have been discussed with the adjoining Authorities.
3.3 The housing figures presented do not account for unmet need from the South Downs
National Park Authority. Whilst a Statement of Common Ground has been referred to, it
has not been published and therefore it is not possible to determine whether the decision
not to make any provision for the National Park is sound.
3.4 Further, Arun District Council has confirmed that it will be objecting to the Plan as currently
proposed on the basis that it has a significant housing need. This is likely to be further
influenced by Chichester not meeting its own needs, a repeat of the 2015 situation which
resulted in Arun having to address some of this within its 2018 Local Plan.
3.5 If the Plan is to proceed on the basis of providing 575dpa as per Policy H1, this will amount
to a shortfall of 1,100 dwellings over the plan period. Without any Statements of Common
Ground, it is unclear as to how this shortfall will be addressed.
4 The Site and its suitability
4.1 The Site comprises approximately 4.25 hectares of agricultural land located to the south
of the B2145 and east of Foxbridge Drive. Agricultural access is taken from the B2145
which abuts the entirety of the northern boundary. The western boundary adjoins
residential property Oakdene and properties at Foxbridge Drive and Farm Close. The Site
is not located within or in close proximity to any land at risk of flooding, nor is it in
proximity to any heritage assets.
4.2 In policy terms, the Site is located outside but adjoining the settlement boundary to the
west and is otherwise unconstrained. The latest Housing Economic Land Availability
Assessment (HELAA) (2021) assessed the Site positively, with potential to deliver
approximately 80 dwellings in the medium term.
4.3 In terms of accessibility, the Site is sustainably located and well connected with the local
footpath and cycle network. There is a surfaced path that runs along the northern
boundary of the site, largely separated from the road behind a hedge. This is not a
designated footpath as it forms part of the National Cycle Network Route 2 however, it is
used as such as it connects into the tow path that runs along the Chichester Canal which
travels north into Chichester or south towards the sea. A footpath is also located along
the B2145, providing access to services within the village.
8
4.4 The Tow Path travelling into Chichester is also part of National Cycle Network Route 2
which connects directly into the heart of the city. This then connects into other cycle
networks north into Kent and west towards Portsmouth and beyond.
4.5 Initial feasibility studies determine that approximately 3 hectares of the site could be
suitable for residential development. The area for development would be focused
around the western boundary whilst the remaining area would comprise formal and
informal open space alongside additional planting and a robust landscaping strategy that
will respect the Ancient Woodland at Hunston Copse whilst ensuring net biodiversity gain
and green infrastructure connectivity with the biodiversity corridors that have been
identified to the north and east. Creating a landscape buffer to the east will also create a
clear, defensible boundary to the village.
4.6 The allocation and development of this land would provide a number of benefits to the
local community;
➢ The Site is well-connected to local services and facilities, within walking distance
of the village facilities such as the Hunston Store and Post Office, pub, village hall,
playing fields and canoe club;
➢ Para GA4.1 specifically states that traffic issues continue to cause major concerns
within the parish. Being located north of the village with direct access onto the
B2145 means the site would minimise additional traffic through the village;
➢ Proposals would include additional footpaths north-south to ensure connectivity
away from the main road whilst linking with existing footpath 188 which runs
east-west around the site;
➢ The Site is not subject to any environmental designations or constraints and is
not liable to flooding;
➢ A suitable landscaping strategy would ensure net biodiversity gain and green
infrastructure connectivity with existing biodiversity corridors to the north and
east;
➢ A landscape buffer to the east would create a clear, defensible boundary to the
north-eastern edge of the village;
➢ Provision of formal and informal open space would be of benefit to residents
throughout the community and to the north of the village especially;
➢ The Site is not constrained and does not rely upon significant infrastructure
improvements in respect of delivery;
➢ Development proposals would include a mix of high-quality homes, with the
potential to include starter homes, bungalows suitable for the elderly and
affordable housing to meet the varying needs of the community; and
9
➢ Any future development would make contributions to local facilities and
infrastructure.
5 Conclusion
5.1 Whilst we understand the approach the Council has taken in terms of the selection of
sites to meet the 535 dpa figures, this is significantly lower than the standard method
figure of 638 and previously consulted figure of 650 dpa. The conclusion in paragraph
5.6.5 and 11.2.3 of the Transport Study appears to be that 700 dpa could be
accommodated (in the southern plan area) by the mitigation proposed for the 535 dpa
scenario plus some additional mitigation at the Portfield roundabout.
5.2 The Council do not appear to have considered that the increased housing requirement
could assist with funding the necessary highway improvements and thus this should be
further reviewed by the Council in order to aim to meet the minimum of 638 dpa.
5.3 The Council have failed to provide sufficient justification for not meeting its housing need
in full and have not suitably considered unmet need from adjoining authorities. The latter
is particularly relevant given constraints of the National Park.
The justification for not meeting the housing needs in full is set out in the Housing Need and Transport Background Papers (July 2024).
As the council is currently unable to meet its own housing need it would be illogical to seek to accommodate the needs of another local authority.
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
Policy H1 Meeting Housing Needs
Representation ID: 5157
Received: 17/03/2023
Respondent: Spiby Partners Ltd
Agent: Henry Adams LLP
Legally compliant? Not specified
Sound? No
Duty to co-operate? No
Understand approach taken in selection of sites to meet 535 dpa figures but significantly lower than standard method figure of 638 and previously consulted figure of 650 dpa. Paragraphs 5.6.5 and 11.2.3 of Transport Study indicate 700 dpa could be accommodated (in southern plan area) by mitigation proposed for 535 dpa scenario plus additional mitigation at the Portfield roundabout. Council do not appear to have considered that increased housing requirement could assist with funding necessary highway improvements and this should be further reviewed in order to aim to meet minimum of 638 dpa. Council have failed to provide sufficient justification for not meeting its housing need in full and have not suitably considered unmet need from adjoining authorities.
Increase housing number per annum, site proposed for allocation (see attachment).
1 Introduction
1.1 This representation provides a response to the Regulation 19: Local Plan Consultation on
behalf of our client Spiby Partners. The submission covers the general principles of the
Local Plan but has a focus on Land east of Foxbridge Drive and south of the B2145,
Hunston. The land is shown on the attached plan HA Appendix 1: Site Location Plan, and
hereafter referred to as ‘the site’.
1.2 This representation will provide a written responses in relation to the Regulation 19 Local
Plan Consultation which directly relate to the promotion of our client’s land for future
development.
2 Comments on Specific Questions/Tests
2.1 In response to the national planning legislation, this Regulation 19 Local Plan
Consultation invites comments on three specific questions, and is the final consultation
phase, before the Regulation 19 version of the Local Plan is submitted for Examination.
2.2 This representation will respond on these specific questions, and then highlight how our
client’s site could help fulfil the full housing requirement for the District. This could be
through an allocation within the Local Plan or at least through the allocation of numbers
to the Parish, who in turn would select sites through a Neighbourhood Plan allocation.
Is the plan ‘sound’?
2.3 Paragraph 35 of the National Planning Policy Framework defines the tests for soundness
which requires the plan to be positively prepared, justified, effective and consistent with
National Policy. These matters will now be considered in further detail in relation to the
current consultation on the Regulation 19 version of the Local Plan.
Is the plan positively prepared and justified?
2.4 Policy S1: Spatial Strategy, sets out the spatial development strategy for the District and
how the Council will achieve sustainable growth over the plan period. Policy H1: Meeting
Housing Needs sets out the housing target in response to the strategy. Both policies have
been informed by the Sustainability Appraisal (SA) dated January 2023 and the Plan
objectives, which are set out at paragraph 2.5.2 of the SA and the Council’s HEDNA (April
2022).
5
2.5 The SA discusses the potential growth scenarios and confirms two points:
(i) Standard method housing figure for Chichester (excluding South Downs National
Park) is 638 dwellings per annum, or 11,484 in total over the Plan period; and
(ii) The above figure is capped at 40% above the baseline need and that the
uncapped figure is significantly higher than this at 884 dwellings per annum (dpa).
2.6 Of particular note is that point ii. seeks to cap the overall housing increase by no more
than 40% above the previously adopted LP housing figure of 435 dpa. It should be noted
here that the 435 dpa figure within the 2015 Local Plan was below the identified need of
505 dpa. This reduced housing figure was accepted on the basis of an early review, but
this early review did not take place.
2.7 Policy H1 identifies the need for the Plan to make provision for at least 10,350 dwellings
within the plan figure, amounting to 575 dpa. This is lower than both the standard method
figure of 638 dpa and the previously consulted Preferred Approach figure of 650 dpa which
accommodated some unmet need from the South Downs National Park Authority.
2.8 This draft Local Plan seeks to constrain housing numbers due to an alleged capacity
concern along the A27 strategic road network and constraints on Waste Water Treatment
Works. The Council therefore arrive at a constrained housing figure by virtue of the
standard method ‘steps’ and also due to infrastructure capacity.
2.9 The Transport Study (January 2023) is the key document on which the Council rely to
constrain their housing figure to 535 dpa. On review of this document, it is clear that the
Council’s consultants undertook a sensitivity analysis as to whether the core scenario that
supports the 535 dpa position in the local plan could accommodate a higher level of
growth. The conclusion in paragraph 5.6.5 and 11.2.3 of the Transport Study notes that
700 dpa could be accommodated (in the southern plan area) by the mitigation proposed
for the 535 dpa, with some additional (as yet undesigned and not costed), mitigation
works.
2.10 Accordingly, the Council’s own evidence base has undertaken the assessment and
concluded that a higher growth figure could be accommodated on the A27, subject to
appropriate improvement works. Given the testing of the higher growth figure in the
Transport Study, the exceptional circumstances to constrain growth, as set out at
paragraph 60 on the NPPF, do not appear to exist and the Plan could be considered
unsound on this point alone.
2.11 As a result of the above, the SA does not consider a scenario where the Council would
meet its local housing need, nor a scenario where it exceeds its local housing need. This is
6
of relevance given that the previous Local Plan underprovided against the OAN, and when
considering the scale of development expected for adjoining authorities, including the
highly constrained SDNP.
Given that it is not accepted that the A27 capacity matters present a ceiling in terms of
housing delivery, it is not accepted that the Plan and associated SA demonstrate that
reasonable alternatives have been considered. The plan is not therefore positively
prepared, nor is the approach to housing figures justified.
Effective?
2.12 On the basis of the 535 dpa figure, it is considered that the selected areas for growth and
figures are deliverable over the Plan period, however, as set out above, the plan area could
accommodate a greater level of growth.
2.13 It should also be noted that the Plan does rely on the delivery of Neighbourhood Plan
and/or Small Site Allocations DPD. This is set out under Policy H3 in the draft document.
This states the following in terms of delivery:
If draft neighbourhood plans making provision for at least the minimum housing numbers of
the relevant area have not made demonstrable progress the council will allocate sites for
development within a development plan document in order to meet the requirements of this
Local Plan.
2.14 The above is not precise and does not provide any clear timetable for delivery within the
Plan period. Whilst the comments are noted above that the Plan could be effective, the
Local Plan needs to give a clear timescale for completion of the Supplementary
Development Plan Documents in order to help ensure it is completed.
Is the plan consistent with National Policy?
2.15 On the basis of the comments above, the approach to selected sites for allocation based
on the 535 dpa figure is considered to be consistent, however, due to the lack of evidence
to demonstrate that the 535 dpa figure should be capped due to the A27 capacity points
raised, the draft Plan does not appear to meet the exceptional circumstances allowed for
at paragraph 61 of the NPPF to justify the alternative approach. The Plan as proposed is
therefore inconsistent with NPPF when read as a whole.
3 Duty to Cooperate
3.1 Paragraph 24 of the NPPF outlines the need for co-operation between local planning
authorities on strategic matters that cross administrative boundaries.
7
3.2 The draft Plan does not address any need requirements in relation to unmet housing need
of neighbouring authorities. Nor does it contain evidence to suggest that these matters
have been discussed with the adjoining Authorities.
3.3 The housing figures presented do not account for unmet need from the South Downs
National Park Authority. Whilst a Statement of Common Ground has been referred to, it
has not been published and therefore it is not possible to determine whether the decision
not to make any provision for the National Park is sound.
3.4 Further, Arun District Council has confirmed that it will be objecting to the Plan as currently
proposed on the basis that it has a significant housing need. This is likely to be further
influenced by Chichester not meeting its own needs, a repeat of the 2015 situation which
resulted in Arun having to address some of this within its 2018 Local Plan.
3.5 If the Plan is to proceed on the basis of providing 575dpa as per Policy H1, this will amount
to a shortfall of 1,100 dwellings over the plan period. Without any Statements of Common
Ground, it is unclear as to how this shortfall will be addressed.
4 The Site and its suitability
4.1 The Site comprises approximately 4.25 hectares of agricultural land located to the south
of the B2145 and east of Foxbridge Drive. Agricultural access is taken from the B2145
which abuts the entirety of the northern boundary. The western boundary adjoins
residential property Oakdene and properties at Foxbridge Drive and Farm Close. The Site
is not located within or in close proximity to any land at risk of flooding, nor is it in
proximity to any heritage assets.
4.2 In policy terms, the Site is located outside but adjoining the settlement boundary to the
west and is otherwise unconstrained. The latest Housing Economic Land Availability
Assessment (HELAA) (2021) assessed the Site positively, with potential to deliver
approximately 80 dwellings in the medium term.
4.3 In terms of accessibility, the Site is sustainably located and well connected with the local
footpath and cycle network. There is a surfaced path that runs along the northern
boundary of the site, largely separated from the road behind a hedge. This is not a
designated footpath as it forms part of the National Cycle Network Route 2 however, it is
used as such as it connects into the tow path that runs along the Chichester Canal which
travels north into Chichester or south towards the sea. A footpath is also located along
the B2145, providing access to services within the village.
8
4.4 The Tow Path travelling into Chichester is also part of National Cycle Network Route 2
which connects directly into the heart of the city. This then connects into other cycle
networks north into Kent and west towards Portsmouth and beyond.
4.5 Initial feasibility studies determine that approximately 3 hectares of the site could be
suitable for residential development. The area for development would be focused
around the western boundary whilst the remaining area would comprise formal and
informal open space alongside additional planting and a robust landscaping strategy that
will respect the Ancient Woodland at Hunston Copse whilst ensuring net biodiversity gain
and green infrastructure connectivity with the biodiversity corridors that have been
identified to the north and east. Creating a landscape buffer to the east will also create a
clear, defensible boundary to the village.
4.6 The allocation and development of this land would provide a number of benefits to the
local community;
➢ The Site is well-connected to local services and facilities, within walking distance
of the village facilities such as the Hunston Store and Post Office, pub, village hall,
playing fields and canoe club;
➢ Para GA4.1 specifically states that traffic issues continue to cause major concerns
within the parish. Being located north of the village with direct access onto the
B2145 means the site would minimise additional traffic through the village;
➢ Proposals would include additional footpaths north-south to ensure connectivity
away from the main road whilst linking with existing footpath 188 which runs
east-west around the site;
➢ The Site is not subject to any environmental designations or constraints and is
not liable to flooding;
➢ A suitable landscaping strategy would ensure net biodiversity gain and green
infrastructure connectivity with existing biodiversity corridors to the north and
east;
➢ A landscape buffer to the east would create a clear, defensible boundary to the
north-eastern edge of the village;
➢ Provision of formal and informal open space would be of benefit to residents
throughout the community and to the north of the village especially;
➢ The Site is not constrained and does not rely upon significant infrastructure
improvements in respect of delivery;
➢ Development proposals would include a mix of high-quality homes, with the
potential to include starter homes, bungalows suitable for the elderly and
affordable housing to meet the varying needs of the community; and
9
➢ Any future development would make contributions to local facilities and
infrastructure.
5 Conclusion
5.1 Whilst we understand the approach the Council has taken in terms of the selection of
sites to meet the 535 dpa figures, this is significantly lower than the standard method
figure of 638 and previously consulted figure of 650 dpa. The conclusion in paragraph
5.6.5 and 11.2.3 of the Transport Study appears to be that 700 dpa could be
accommodated (in the southern plan area) by the mitigation proposed for the 535 dpa
scenario plus some additional mitigation at the Portfield roundabout.
5.2 The Council do not appear to have considered that the increased housing requirement
could assist with funding the necessary highway improvements and thus this should be
further reviewed by the Council in order to aim to meet the minimum of 638 dpa.
5.3 The Council have failed to provide sufficient justification for not meeting its housing need
in full and have not suitably considered unmet need from adjoining authorities. The latter
is particularly relevant given constraints of the National Park.
The justification for not meeting the housing needs in full is set out in the Housing Need and Transport Background Papers. The latest Duty to Cooperate evidence is set out in the updated Statement of Compliance.
Promotion of site noted.
Object
Chichester Local Plan 2021 - 2039: Proposed Submission
10.1
Representation ID: 5158
Received: 17/03/2023
Respondent: Spiby Partners Ltd
Agent: Henry Adams LLP
Legally compliant? Not specified
Sound? No
Duty to co-operate? No
Understand approach taken in terms of selection of sites to meet 535 dpa but significantly lower than standard method figure of 638 and previously consulted figure of 650 dpa. Paragraphs 5.6.5 and 11.2.3 of Transport Study indicate 700 dpa could be accommodated (in southern plan area) by mitigation proposed for the 535 dpa scenario plus additional mitigation at the Portfield roundabout. Council have not considered increased housing requirement could assist with funding necessary highway improvements and this should be further reviewed in order to aim to meet minimum of 638 dpa. Council have failed to provide sufficient justification for not meeting its housing need in full and have not suitably considered unmet need from adjoining authorities.
Site proposed for additional allocation - see attachment.
1 Introduction
1.1 This representation provides a response to the Regulation 19: Local Plan Consultation on
behalf of our client Spiby Partners. The submission covers the general principles of the
Local Plan but has a focus on Land east of Foxbridge Drive and south of the B2145,
Hunston. The land is shown on the attached plan HA Appendix 1: Site Location Plan, and
hereafter referred to as ‘the site’.
1.2 This representation will provide a written responses in relation to the Regulation 19 Local
Plan Consultation which directly relate to the promotion of our client’s land for future
development.
2 Comments on Specific Questions/Tests
2.1 In response to the national planning legislation, this Regulation 19 Local Plan
Consultation invites comments on three specific questions, and is the final consultation
phase, before the Regulation 19 version of the Local Plan is submitted for Examination.
2.2 This representation will respond on these specific questions, and then highlight how our
client’s site could help fulfil the full housing requirement for the District. This could be
through an allocation within the Local Plan or at least through the allocation of numbers
to the Parish, who in turn would select sites through a Neighbourhood Plan allocation.
Is the plan ‘sound’?
2.3 Paragraph 35 of the National Planning Policy Framework defines the tests for soundness
which requires the plan to be positively prepared, justified, effective and consistent with
National Policy. These matters will now be considered in further detail in relation to the
current consultation on the Regulation 19 version of the Local Plan.
Is the plan positively prepared and justified?
2.4 Policy S1: Spatial Strategy, sets out the spatial development strategy for the District and
how the Council will achieve sustainable growth over the plan period. Policy H1: Meeting
Housing Needs sets out the housing target in response to the strategy. Both policies have
been informed by the Sustainability Appraisal (SA) dated January 2023 and the Plan
objectives, which are set out at paragraph 2.5.2 of the SA and the Council’s HEDNA (April
2022).
5
2.5 The SA discusses the potential growth scenarios and confirms two points:
(i) Standard method housing figure for Chichester (excluding South Downs National
Park) is 638 dwellings per annum, or 11,484 in total over the Plan period; and
(ii) The above figure is capped at 40% above the baseline need and that the
uncapped figure is significantly higher than this at 884 dwellings per annum (dpa).
2.6 Of particular note is that point ii. seeks to cap the overall housing increase by no more
than 40% above the previously adopted LP housing figure of 435 dpa. It should be noted
here that the 435 dpa figure within the 2015 Local Plan was below the identified need of
505 dpa. This reduced housing figure was accepted on the basis of an early review, but
this early review did not take place.
2.7 Policy H1 identifies the need for the Plan to make provision for at least 10,350 dwellings
within the plan figure, amounting to 575 dpa. This is lower than both the standard method
figure of 638 dpa and the previously consulted Preferred Approach figure of 650 dpa which
accommodated some unmet need from the South Downs National Park Authority.
2.8 This draft Local Plan seeks to constrain housing numbers due to an alleged capacity
concern along the A27 strategic road network and constraints on Waste Water Treatment
Works. The Council therefore arrive at a constrained housing figure by virtue of the
standard method ‘steps’ and also due to infrastructure capacity.
2.9 The Transport Study (January 2023) is the key document on which the Council rely to
constrain their housing figure to 535 dpa. On review of this document, it is clear that the
Council’s consultants undertook a sensitivity analysis as to whether the core scenario that
supports the 535 dpa position in the local plan could accommodate a higher level of
growth. The conclusion in paragraph 5.6.5 and 11.2.3 of the Transport Study notes that
700 dpa could be accommodated (in the southern plan area) by the mitigation proposed
for the 535 dpa, with some additional (as yet undesigned and not costed), mitigation
works.
2.10 Accordingly, the Council’s own evidence base has undertaken the assessment and
concluded that a higher growth figure could be accommodated on the A27, subject to
appropriate improvement works. Given the testing of the higher growth figure in the
Transport Study, the exceptional circumstances to constrain growth, as set out at
paragraph 60 on the NPPF, do not appear to exist and the Plan could be considered
unsound on this point alone.
2.11 As a result of the above, the SA does not consider a scenario where the Council would
meet its local housing need, nor a scenario where it exceeds its local housing need. This is
6
of relevance given that the previous Local Plan underprovided against the OAN, and when
considering the scale of development expected for adjoining authorities, including the
highly constrained SDNP.
Given that it is not accepted that the A27 capacity matters present a ceiling in terms of
housing delivery, it is not accepted that the Plan and associated SA demonstrate that
reasonable alternatives have been considered. The plan is not therefore positively
prepared, nor is the approach to housing figures justified.
Effective?
2.12 On the basis of the 535 dpa figure, it is considered that the selected areas for growth and
figures are deliverable over the Plan period, however, as set out above, the plan area could
accommodate a greater level of growth.
2.13 It should also be noted that the Plan does rely on the delivery of Neighbourhood Plan
and/or Small Site Allocations DPD. This is set out under Policy H3 in the draft document.
This states the following in terms of delivery:
If draft neighbourhood plans making provision for at least the minimum housing numbers of
the relevant area have not made demonstrable progress the council will allocate sites for
development within a development plan document in order to meet the requirements of this
Local Plan.
2.14 The above is not precise and does not provide any clear timetable for delivery within the
Plan period. Whilst the comments are noted above that the Plan could be effective, the
Local Plan needs to give a clear timescale for completion of the Supplementary
Development Plan Documents in order to help ensure it is completed.
Is the plan consistent with National Policy?
2.15 On the basis of the comments above, the approach to selected sites for allocation based
on the 535 dpa figure is considered to be consistent, however, due to the lack of evidence
to demonstrate that the 535 dpa figure should be capped due to the A27 capacity points
raised, the draft Plan does not appear to meet the exceptional circumstances allowed for
at paragraph 61 of the NPPF to justify the alternative approach. The Plan as proposed is
therefore inconsistent with NPPF when read as a whole.
3 Duty to Cooperate
3.1 Paragraph 24 of the NPPF outlines the need for co-operation between local planning
authorities on strategic matters that cross administrative boundaries.
7
3.2 The draft Plan does not address any need requirements in relation to unmet housing need
of neighbouring authorities. Nor does it contain evidence to suggest that these matters
have been discussed with the adjoining Authorities.
3.3 The housing figures presented do not account for unmet need from the South Downs
National Park Authority. Whilst a Statement of Common Ground has been referred to, it
has not been published and therefore it is not possible to determine whether the decision
not to make any provision for the National Park is sound.
3.4 Further, Arun District Council has confirmed that it will be objecting to the Plan as currently
proposed on the basis that it has a significant housing need. This is likely to be further
influenced by Chichester not meeting its own needs, a repeat of the 2015 situation which
resulted in Arun having to address some of this within its 2018 Local Plan.
3.5 If the Plan is to proceed on the basis of providing 575dpa as per Policy H1, this will amount
to a shortfall of 1,100 dwellings over the plan period. Without any Statements of Common
Ground, it is unclear as to how this shortfall will be addressed.
4 The Site and its suitability
4.1 The Site comprises approximately 4.25 hectares of agricultural land located to the south
of the B2145 and east of Foxbridge Drive. Agricultural access is taken from the B2145
which abuts the entirety of the northern boundary. The western boundary adjoins
residential property Oakdene and properties at Foxbridge Drive and Farm Close. The Site
is not located within or in close proximity to any land at risk of flooding, nor is it in
proximity to any heritage assets.
4.2 In policy terms, the Site is located outside but adjoining the settlement boundary to the
west and is otherwise unconstrained. The latest Housing Economic Land Availability
Assessment (HELAA) (2021) assessed the Site positively, with potential to deliver
approximately 80 dwellings in the medium term.
4.3 In terms of accessibility, the Site is sustainably located and well connected with the local
footpath and cycle network. There is a surfaced path that runs along the northern
boundary of the site, largely separated from the road behind a hedge. This is not a
designated footpath as it forms part of the National Cycle Network Route 2 however, it is
used as such as it connects into the tow path that runs along the Chichester Canal which
travels north into Chichester or south towards the sea. A footpath is also located along
the B2145, providing access to services within the village.
8
4.4 The Tow Path travelling into Chichester is also part of National Cycle Network Route 2
which connects directly into the heart of the city. This then connects into other cycle
networks north into Kent and west towards Portsmouth and beyond.
4.5 Initial feasibility studies determine that approximately 3 hectares of the site could be
suitable for residential development. The area for development would be focused
around the western boundary whilst the remaining area would comprise formal and
informal open space alongside additional planting and a robust landscaping strategy that
will respect the Ancient Woodland at Hunston Copse whilst ensuring net biodiversity gain
and green infrastructure connectivity with the biodiversity corridors that have been
identified to the north and east. Creating a landscape buffer to the east will also create a
clear, defensible boundary to the village.
4.6 The allocation and development of this land would provide a number of benefits to the
local community;
➢ The Site is well-connected to local services and facilities, within walking distance
of the village facilities such as the Hunston Store and Post Office, pub, village hall,
playing fields and canoe club;
➢ Para GA4.1 specifically states that traffic issues continue to cause major concerns
within the parish. Being located north of the village with direct access onto the
B2145 means the site would minimise additional traffic through the village;
➢ Proposals would include additional footpaths north-south to ensure connectivity
away from the main road whilst linking with existing footpath 188 which runs
east-west around the site;
➢ The Site is not subject to any environmental designations or constraints and is
not liable to flooding;
➢ A suitable landscaping strategy would ensure net biodiversity gain and green
infrastructure connectivity with existing biodiversity corridors to the north and
east;
➢ A landscape buffer to the east would create a clear, defensible boundary to the
north-eastern edge of the village;
➢ Provision of formal and informal open space would be of benefit to residents
throughout the community and to the north of the village especially;
➢ The Site is not constrained and does not rely upon significant infrastructure
improvements in respect of delivery;
➢ Development proposals would include a mix of high-quality homes, with the
potential to include starter homes, bungalows suitable for the elderly and
affordable housing to meet the varying needs of the community; and
9
➢ Any future development would make contributions to local facilities and
infrastructure.
5 Conclusion
5.1 Whilst we understand the approach the Council has taken in terms of the selection of
sites to meet the 535 dpa figures, this is significantly lower than the standard method
figure of 638 and previously consulted figure of 650 dpa. The conclusion in paragraph
5.6.5 and 11.2.3 of the Transport Study appears to be that 700 dpa could be
accommodated (in the southern plan area) by the mitigation proposed for the 535 dpa
scenario plus some additional mitigation at the Portfield roundabout.
5.2 The Council do not appear to have considered that the increased housing requirement
could assist with funding the necessary highway improvements and thus this should be
further reviewed by the Council in order to aim to meet the minimum of 638 dpa.
5.3 The Council have failed to provide sufficient justification for not meeting its housing need
in full and have not suitably considered unmet need from adjoining authorities. The latter
is particularly relevant given constraints of the National Park.
The justification for not meeting the full housing need is set out in the Housing Requirement and Transport Background Papers. As the Council is currently unable to meet is own housing need, it is unable to accommodate the needs of other local authorities. Promotion of alternative site noted