Chichester Local Plan 2021 - 2039: Proposed Submission

Search representations

Results for National Highways search

New search New search

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

2.12

Representation ID: 5276

Received: 16/03/2023

Respondent: National Highways

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment.] We note that households who did not have access to a car or van; are lower than county, regional and national averages (para 2.12)

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Noted.

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

2.18

Representation ID: 5277

Received: 16/03/2023

Respondent: National Highways

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment.] We note that the majority of existing employment and business space are focused around Chichester city and the A27 corridor (para 2.18).

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Noted.

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

2.29

Representation ID: 5278

Received: 16/03/2023

Respondent: National Highways

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Support.] The A27 is a key corridor although the area is severely congested. The bypass continues to suffer from high accident rates, daily congestion, and extensive queuing at most of the junctions along this 5km stretch of road. With traffic due to increase by 24% by 2035 this situation will consistently worsen if there is no intervention.

We therefore support (para 2.29) the need:
- to reduce the need to travel, particularly by private car, supported by direct walking and cycling routes - for the Local Plan to provide local infrastructure to support new development and seek opportunities to address existing infrastructure problems, such as those relating to the A27

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Support noted

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

2.37

Representation ID: 5279

Received: 16/03/2023

Respondent: National Highways

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Support.] We support the vision (para 2.37) that by 2039, the Chichester plan area will be a place where people can: - get about easily, safely, and conveniently with less reliance on private cars –making use of the rail and bus network, and with more opportunities for active travel including walking and cycling.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Support Noted

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

2.54

Representation ID: 5280

Received: 16/03/2023

Respondent: National Highways

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Support.] We support:
- Objective 1 (Climate change) (para 2.54). This objective helps to support National Highways Net Zero objectives.
- Objective 4: (Employment and economy). This objective may help to reduce the need to travel long distances, increase community self-containment and support short walking and cycling trips
- Objective 7: (Strategic Infrastructure). This objective will help to reduce demand and reliance on the A27 especially in peak periods.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Support noted

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Policy S1 Spatial Development Strategy

Representation ID: 5281

Received: 16/03/2023

Respondent: National Highways

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment.] We acknowledge that the quantum and locations of development presented in the planning policies of the document are clear and understandable.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Noted

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

3.20

Representation ID: 5282

Received: 16/03/2023

Respondent: National Highways

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Support.] We support that the Plan does not include any strategic allocations on the Manhood because all traffic from the peninsular ultimately joins or crosses the A27. The A27 is also the main route for tourism traffic to Bognor Regis. We will continue to work with WSCC on this highway matter.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Noted.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

3.25

Representation ID: 5283

Received: 16/03/2023

Respondent: National Highways

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Seeking to understand impacts.] We acknowledge that the Plan has ruled out high growth in Kirdford, Wisborough Green and Plaistow and Ifold, but seek to understand the impacts and mitigation measures associated with the A27.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

A transport assessment was undertaken to understand the impact of alternative growth options on the local highway network in the north east plan area and the network further afield, including the A27.

Based on assessing the growth option proposing the highest level of growth (1,477 dwellings), the assessment found that trip increases on roads in Chichester, including the A27, were predicted to be minimal and would not materially impact the A27.

A further transport assessment of the distribution of housing in the northern plan area (2024) reinforced the findings of the earlier transport assessment. The most recent assessment indicated that because of the relatively small numbers and the dispersed nature of the development, the additional trip numbers were unlikely to have a material impact.

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Policy NE15 Flood Risk and Water Management

Representation ID: 5284

Received: 16/03/2023

Respondent: National Highways

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Requesting reference to SRN/NH made.] We request that reference is made to the SRN or National Highways within the Flood Risk policies.

Development must not lead to any surface water flooding on the SRN carriageway. These points apply to the site operation and construction phases. National Highways should be contacted to discuss these points in detail as part of, or in advance of a planning application submission.

Change suggested by respondent:

We request that reference is made to the SRN or National Highways within the Flood Risk policies.

Development must not lead to any surface water flooding on the SRN carriageway. These points apply to the site operation and construction phases. National Highways should be contacted to discuss these points in detail as part of, or in advance of a planning application submission.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

While the Council fully acknowledges the importance of preventing flooding of the strategic road network, it is considered that this amendment is not necessary in order to render the plan sound. The policy already includes a catch-all style clause concerning not increasing flood risk elsewhere which addresses the sort of issue envisaged in the comment

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Policy NE23 Noise

Representation ID: 5285

Received: 16/03/2023

Respondent: National Highways

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Considerations in line with NH policy.] For sites positioned close to the SRN carriageway and junctions, it will be necessary to ensure that the development proposals mitigate appropriately the potential for lighting, noise, and vibration impacts.

In terms of noise, we would expect development masterplans to be designed to minimise the exposure to strategic traffic, for example a landscape buffer or sensitive screening to shield the environment and dwellings from A27 noise.

In addition to noise impacts and in accordance with our policies which support that all noise fences, screening and other structures must be erected on the development land, and far enough within the developer’s land to enable maintenance to take place without encroachment onto highway land. We would expect that these issues are considered as part of planning proposals.

Impacts arising from any disruptions during construction, noise, vibration, traffic volume, composition or routing and transport infrastructure modification should be fully assessed and reported.

Change suggested by respondent:

Amend the policy to ensure that for sites close to the SRN:
- development proposals appropriately mitigate the potential for lighting, noise, and vibration impacts;
- development masterplans are designed to minimise the exposure to strategic traffic;
- all noise fences, screening and other structures must be erected on the development land, and far enough within the developer’s land to enable maintenance to take place without encroachment onto highway land;
- impacts arising from any disruptions during construction, noise, vibration, traffic volume, composition or routing and transport infrastructure modification are fully assessed and reported.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:


Our response:

Paragraph 4.134 recognises that noise sensitive development proposals may be located in close proximity to transport and references noise impact assessments and good acoustic design informed by relevant guidance. Such matters will be determined on a case-by -case basis at planning application stage

For instructions on how to use the system and make comments, please see our help guide.