5.41

Showing comments and forms 1 to 5 of 5

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4724

Received: 17/03/2023

Respondent: Mr Cliff Archer

Representation Summary:

Support

Full text:

Support

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4963

Received: 17/03/2023

Respondent: The Planning Bureau on behalf of McCarthy Stone

Agent: Miss Natasha Styles

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

To be consistent with national policy and the plan's own evidence the definitions used in para 5.41 should be amended to ensure consistency with national policy and to not eliminate an important element of older persons housing that being retirement living or sheltered accommodation.

To be consistent with national policy, positively prepared, effective and justified para 5.41 should be amended in line with our recommendations.

Change suggested by respondent:

Recommendation
To be consistent with national policy, positively prepared, effective and justified para 5.41 should be amended as follows:

Amend para so it reads 5.41 as follows:

5.41. The Housing and Economic Development Needs Assessment (HEDNA) 2022 estimates the greatest population increase in the district by 2039 to be those in age groups 75 and over. To support an ageing population there should be provision around 2,369-3,317 units of specialist housing to meet the needs of older people delivered in Chichester over the plan period. This amounts to around 132-184 units per annum some 17% to 24% of all homes. Suitable housing options for the differing needs of individuals, include:
• age restricted general market housing,
• Retirement living or sheltered housing,
• extra care housing or housing with care,
• residential care homes and nursing homes

Full text:

Para 5.41 - Housing for older people
Thank you for the opportunity to comment on the Chichester Local Plan 2021-2039 Proposed Submission Draft (Regulation 19) consultation. McCarthy Stone is the leading provider of specialist housing for older people.
Para 5.41 identifies that the Chichester Housing and Economic Development Needs Assessment, 2022, Iceni (HEDNA) ‘estimates the greatest population increase in the district by 2039 to be those in age groups 75 and over’. The paragraph then continues to confirm the kind of housing that may be suitable and this includes ‘Sufficient adaptable and/or accessible market housing stock so that those wishing, to remain in their own homes can do so as their needs change, Smaller homes, for those wishing to downsize, and bungalows, Extra care housing, for those able to live relatively independently but requiring onsite support, Care homes, for those needing additional support’.
Government’s policy, as set out in the revised NPPF, is to boost significantly, the supply of housing. Paragraph 60 reads:

“To support the Government’s objective of significantly boosting the supply of homes, it is important that a sufficient amount and variety of land can come forward where it is needed, that the needs of groups with specific housing requirements are addressed and that land with permission is developed without unnecessary delay.”
The revised NPPF looks at delivering a sufficient supply of homes, Paragraph 62 identifies within this context, the size, and type and tenure of housing needed for different groups in the community should be assessed and reflected in planning policies including older people.

In June 2019 the PPG was updated to include a section on Housing for Older and Disabled People, recognising the need to provide housing for older people. Paragraph 001 Reference ID: 63-001-20190626 states:

“The need to provide housing for older people is critical. People are living longer lives and the proportion of older people in the population is increasing. In mid-2016 there were 1.6 million people aged 85 and over; by mid-2041 this is projected to double to 3.2 million. Offering older people a better choice of accommodation to suit their changing needs can help them live independently for longer, feel more connected to their communities and help reduce costs to the social care and health systems. Therefore, an understanding of how the ageing population affects housing needs is something to be considered from the early stages of plan-making through to decision-taking” (emphasis added)

Paragraph 003 Reference ID: 63-003-20190626 recognises that:

“the health and lifestyles of older people will differ greatly, as will their housing needs, which can range from accessible and adaptable general needs housing to specialist housing with high levels of care and support. For plan-making purposes, strategic policy-making authorities will need to determine the needs of people who will be approaching or reaching retirement over the plan period, as well as the existing population of older people.”

Thus, a range of provision needs to be planned for. Paragraph 006 Reference ID: 63-006-20190626 sets out:

“plan-making authorities should set clear policies to address the housing needs of groups with particular needs such as older and disabled people. These policies can set out how the plan-making authority will consider proposals for the different types of housing that these groups are likely to require. They could also provide indicative figures or a range for the number of units of specialist housing for older people needed across the plan area throughout the plan period..”

Need for Older Persons’ Housing
It is well documented that the UK faces an ageing population. Life expectancy is greater than it used to be and as set out above by 2032 the number of people in the UK aged over 80 is set to increase from 3.2 million to 5 million (ONS mid 2018 population estimates).

It is generally recognised (for example The Homes for Later Living Report September 2019). That there is a need to deliver 30,000 retirement and extra care houses a year in the UK to keep pace with demand.

The Chichester HEDNA, 2022 update, Iceni, April 2022 at paragraph 8.43 identifies that ‘In total, the older persons analysis points towards a need for around 2,369 to 3,317 units over the 2021-39 period (132-184 per annum) – the older person need equates to some 17-24% of all homes needing to be some form of specialist accommodation for older people’.

It is therefore clear there will be a significant amount of specialist housing required to meet the needs of older people over the plan period and the provision of suitable housing and care to meet the needs of this demographic should be more of a priority of the emerging Local Plan in order for it to be positively prepared, effective and consistent with national policy. Para 5.41 should therefore be amended to identify this need.

Para 5.41 also identifies the kinds of housing that may be suitable to meet the housing needs of older people. However, these differ to the PPG on ‘housing for older and disabled people’ that at Paragraph: 010 Reference ID: 63-010-20190626 defines the different types of specialist housing for older people as being ‘age restricted general market housing, Retirement living or sheltered housing, extra care housing or housing with care, residential care homes and nursing homes’. Para 8.23 of the Chichester HEDNA also uses the definitions within the PPG. Therefore, to be consistent with national policy and the plans own evidence the definitions used in para 5.41 should also be amended to ensure consistency with national policy and to not eliminate an important element of older persons housing that being retirement living or sheltered accommodation.

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5190

Received: 17/03/2023

Respondent: John Newman

Representation Summary:

I am very pleased to see this section.

It should also be borne in mind that there is an ever-expanding number of senior citizens who opt for the gentle climate south of the Downs. In this context it is surely predictable, for instance, that more rather than fewer care homes will be needed in the next decade as my baby-boomer generation ages even more!

I also think it very noticeable how few bungalows there are in Chichester and would add that, if you would to persuade people like me to leave my long-time family home, there is not the supply of bungalows, which would be my obvious next step, all the more so as I do not fancy living in a flat (and have no idea how typical I am in that).

I am one of the baby-boomer generation, and there are a lot of us - an extra form had to be put on to my grammar school when I arrived there in 1957. We are now in our early or mid 70s, and the potential impact of our hitting first retirement and then moving further into retirement has been so predictable. The planners need to prepare now for the impact of most of us attaining our 80s!

Full text:

See attachment.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5292

Received: 16/03/2023

Respondent: National Highways

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment - Seeking to understand Council's approach.] Those age groups 75 and over (Para 5.41) or with specialised mobility needs (Para 5.42) are less likely to use walking / cycling routes than younger persons.

Department for Transport data suggests that there has been a 20-40% change (decrease) in bus vehicle miles across West Sussex since the pandemic. Bus networks are shrinking across the UK and services are being cut or rationalised.

Considering these changes, and the typical inability of the aged to walk or cycle longer distances, we seek to understand how the Council will demonstrate that revenue funding can be secured to maintain the longterm viability of the public transport in proximity of the specialist accommodation for older people and those with specialist needs and how this may affect the viability of the overall sustainable transport package.

Impacts arising from such developments and the funding of transport infrastructure modifications should be fully assessed at the planning application stage.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 5335

Received: 16/03/2023

Respondent: National Highways

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

[National Highways letter dated 24/07/23 confirmed representation should be categorised as Comment -Seek clarity]. Local Plan evidence - Housing and Economic Development Needs Assessment (HEDNA) Final
Report – April 2022

The Executive Summary Para 13 states “The District has a notably older age structure than seen regionally or nationally, with 28% of the population estimated to be aged 65 and over in 2020 (compared to a national average of 19%). The Manhood Peninsula sub-area sees a particularly old population (33% aged 65+)”

We seek clarity on how these demographics are addressed in the Plan and their transport needs managed.

Full text:

We have reviewed the publicly available Local Plan documents and provided comments in the attached letter, in relation to the transport implications of the plan for the safety and operation of the SRN.
Our comments include issues to resolve, comments, requests for further information and recommendations. A brief summary of our main comments are:
- the reliance on the delivery of the A27 Chichester bypass improvements project.
- the requirements for new, additional, and adapted processes and assessments, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments.
- collaborative working between agencies in combination with a robust monitor and manage policy.
We hope our comments assist.
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders. We look forward to continuing to participate in future consultations and discussions.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Background

National Highways has been appointed by the Secretary of State for Transport as strategic highway company under the provisions of the Infrastructure Act 2015 and is the highway authority, traffic authority and street authority for the strategic road network (SRN).

National Highways is responsible for operating, maintaining, and improving the Strategic Road Network (SRN) i.e., the Trunk Road and Motorway Network in England, as laid down in Department for Transport (DfT) Circular 01/2022 (Strategic Road Network and the delivery of sustainable development).

The SRN is a critical national asset and as such we work to ensure that it operates and is managed in the public interest, both in respect of current activities and needs as well as in providing effective stewardship of its long-term operation and integrity.

Our responses to Local Plan consultations are guided by relevant policy and guidance including the National Planning Policy Framework (2021) (NPPF):

• Transport issues should be considered from the earliest stages of plan-making and development proposals so that the potential impact of development on transport networks can be addressed (para 104).

• The planning system should actively manage patterns of growth such that significant development is focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes. (para 105).

• Planning policies should be prepared with the active involvement of highways authorities and other transport infrastructure providers so that strategies and investments for supporting sustainable transport and development patterns are aligned. (para 106).

• In terms of identifying the necessity of transport infrastructure, NPPF confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. (para 111).

• Planning policies and decisions should support development that makes efficient use of land, taking into account the availability and capacity of infrastructure and services – both existing and proposed – as well as their potential for further improvement and the scope to promote sustainable travel modes that limit future car use. (para 124).

In relation to the tests of soundness set out at paragraph 35 of the NPPF, in the context of transport, these are interpreted as meaning:

a) Positively prepared - has the transport strategy been prepared with the active involvement of the highway authorities, other transport infrastructure providers and operators and neighbouring councils?
b) Justified – Is the transport strategy based on a robust evidence base prepared with the agreement in partnership, or with the support of the highway authorities?
c) Effective – Does the transport strategy and policy satisfy the transport needs of the plan and is it deliverable at a pace which provides for and accommodates the proposed progress and implementation of the plan?
d) Consistent with national policy – Does the transport strategy support the economic, social, and environmental objectives of the Plan and the NPPF/NPPG?

We will be concerned with proposals that have the potential to impact on the safe and efficient operation of the SRN; in this case, the A27 trunk road (Chichester Bypass and its junctions) which is the main access route in the Chichester area. We have particular interest in any allocation, policy or proposals which could have implications for the A27 and the wider SRN network. We are interested as to whether there would be any adverse road safety or operational implications for the SRN. The latter would include a material increase in queueing or delay or reduction in journey time reliability during the construction or operation of the development set out in the plan.

National Highways is a key delivery partner for sustainable development promoted through the plan-led system, and as a statutory consultee we have a duty to cooperate with local authorities to support the preparation and implementation of development plan documents.

In accordance with national planning and transport policy and our operating licence, we are entirely neutral on the principle of development as it is for the local planning authority to determine whether development should be allocated or permitted; albeit it must comply with national policy on locating development in locations that are or can be made sustainable. Therefore, while always seeking early and fulsome engagement with local plans and/or developers, we will simply be assessing the transport and related implications of plans or proposals and agreeing any necessary transport improvements and relevant development management policy.

In progressing Local Plans, we will seek to agree the following:
• Assessment tools and methodology
• Baseline Assessment i.e., to demonstrate that the assessment tool accurately reflects current transport conditions
• Comparator case assessment i.e., to forecast the transport conditions that would occur in the absence of the plan
• Forecast modelling i.e., to forecast the transport conditions that would arise with the plan in place, this will include an assessment at the end of the Plan period; and, if required, at full build out if that occurs after the end of the Plan period
• Outputs and outcomes of modelling, demonstrating, as appropriate, what transport infrastructure is necessary to support the plan o It should be noted that a suite of transport modelling tools may be required. This includes strategic modelling covering an area at least one major junction beyond the district boundary, localised network modelling where several links/junctions are close together and/or individual junction modelling
o A DMRB (Design Manual for Roads and Bridges) compliancy assessment may also be required for certain highway features, such as
Merge/Diverge assessment at Grade separated junctions, link capacity assessments, and others.
• The design of any necessary transport infrastructure, to an extent suitable for establishing deliverability during the plan period at the time that it becomes necessary for the purpose of ensuring that unacceptable road safety impacts or severe operational impacts do not arise as a result of development. This may be to at least General Arrangement design stage or preliminary design stage. Whichever degree of detail is agreed, the products must be in full compliance with the DMRB.
• Industry standard transport intervention costings.
• The delivery/funding mechanisms for necessary transport interventions. It should not be assumed that National Highways will have any responsibility to identify or deliver necessary transport interventions.
• If considered appropriate, a “Monitor & Manage” (M&M) framework, aimed at managing the pace of development in line with the pace of funding and delivery of necessary highway interventions in a manner which responds to the realworld impacts of development may be agreed for inclusion in the plan subject to the adequacy of risk control measures included therein. This can include the move from a ‘predict & provide’ style of delivery to ‘a vision & validate’ style. o Any M&M framework must be based on a “worst case scenario” whereby necessary mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. It must be translated into development management plan policy and policy relating to development allocations.

Further detail on the above can be provided by National Highways.

While ideally all the above should be agreed prior to the Submission of the Local Plan for examination, we recognise that this is not always possible. However, all parties should work towards all matters being agreed and reflected in a Statement of Common Ground (SoCG) by the start of the Local Plan Examination at the latest. Ideally the SoCG between the Council and National Highways would be prepared well in advance of plan submission in order to guide resource input and to track progress towards final agreement on all relevant matters starting from the earliest plan iterations until the final version is agreed.

It is acknowledged that Government policy places much emphasis on housing delivery as a means for ensuring economic growth and addressing the current national shortage of housing. The NPPF is very clear that:
“Strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need (and any needs that cannot be met within neighbouring areas) can be met over the plan period.”

However, new DfT C1/22 and the NPPF are equally clear that any development, including housing delivery, must be tempered by the requirement to ensure that the associated transport demand can be accommodated without unacceptable impacts on the safety of the SRN or severe impacts on the operation of the SRN including reliability and congestion. Therefore, as necessary and appropriate, any plan and/or development must be accompanied by suitable mitigation in the right places at the right time, that is to the required design standards and is deliverable in terms of land availability, constructability and funding.

We would also draw your attention to the then Highways England document ‘The Strategic Road Network, Planning for the Future: A guide to working with National
Highways on planning matters’ (September 2015). This document sets out how National Highways intends to work with local planning authorities and developers to support the preparation of sound documents which enable the delivery of sustainable development. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachmen t_data/file/461023/N150227_-_Highways_England_Planning_Document_FINAL-lo.pdf

Responses to Local Plan consultations are also guided by National Planning Policy Framework (NPPF) revised on 20 July 2021 which sets out the government’s planning policies for England and how these are expected to be applied.

Updated Circular (01/2022)
It should be noted that since the start of the Local Plan consultation process, on the 23 December 2022, the Department for Transport released a new circular on the ‘Strategic road network and the delivery of sustainable development’ (Circular 01/2022), which replaces all of the policies in Circular 02/2013 of the same name. These representations take account of the new circular and the requirements in terms of the Local Plan evidence base and process.

We request that the Local Plan is prepared in line with all aspects of the new circular. Particularly, the principles of sustainable development (paragraphs 11 to 17), new connections and capacity enhancements (paragraphs 18 to 25), and engagement with plan-making (paragraphs 26 to 38).

Regulation 18 submission
In our Regulation 18 submission we noted several matters including:
• The need to mitigate the adverse impacts of strategic development traffic to the A27 Chichester Bypass and its junctions at Portfield Roundabout, Bognor Road Roundabout, Whyke Roundabout, Stockbridge Roundabout and Fishbourne Roundabout and Oving junction.
• The need to identify a mechanism to calculate contributions towards the delivery of the previously agreed Local Plan A27 improvements
• The need to confirm the number of dwellings needed within the plan period
• The need to establish National Highways acceptance of the traffic model reference and future case scenarios
• The need to confirm costs, viability, and funding associated with mitigating the safety and congestion impacts of the development included within the plan.

Local Plan context
This Local Plan (Chichester Local Plan 2021 – 2039), prepared by the Local Planning Authority (LPA) Chichester District Council, sets out the vision for future development in the district and will be used to help decide on planning applications and other planning related decisions including shaping infrastructure investments.

The draft sets out how the district should be developed over the next 18-years to 2039 including for the full Plan period (1 April 2021 to 31 March 2039) the total supply of
- 10,359 dwellings
- 114,652 net additional sqm new floorspace
Minus the completions this is equivalent to around 530 dwellings and 6,150 sqm of floorspace a year.

National Highways Representations
To date National Highways have worked collaboratively with Chichester District Council (the Council) and West Sussex County Council (WSCC) and we will continue to work with the Council and other key stakeholders.

We have undertaken a review of the Chichester Local Plan 2021-2039 proposed submission version and accompanying evidence documents, our comments are set out in the tables below (following pages). [see table within attachment]

Summary

We have reviewed the publicly available Local Plan documents and provided comments above in relation to the transport implications of the plan for the safety and operation of the SRN. We understand that other technical information is available, but this was not presented as part of this consultation.
Chichester, and the A27, are already heavily congested, infrastructure in the existing Local Plan remains undelivered and the growth set out in the new Plan will further increase travel demand.
As presented, satisfying the transport needs of the plan is clearly reliant on the delivery of the A27 Chichester bypass improvements project. The A27 Chichester bypass improvements project is one of 32 pipeline schemes being considered for possible inclusion in National Highways third Road Investment Strategy (RIS3) covering 1 April 2025 to 31 March 2030.
On 9 March 2023 the UK Transport Secretary ensured record funding would be invested in the country’s transport network, sustainably driving growth across the country while managing the pressures of inflation. The announcement cited the A27 Arundel Bypass as being deferred from RIS2 to RIS 3 (covering 2025-2030). The transport secretary also identified a number of challenges to the delivery of the road investment strategy and cited the benefit of allowing extra time to ensure schemes are better planned and efficient schemes can be deployed more effectively.
At present, there is no commitment by DfT to carry out the A27 Chichester bypass improvements project. Until the A27 Chichester bypass improvements project is published in the RIS3, consented and a decision to invest is made it cannot be assumed to be a committed project.
We note that the Plan does not address any uncertainty of delivery of the A27 Chichester bypass improvements project and we strongly recommend that there is either no reliance placed on RIS3 to realise capacity for growth in the Plan or that contingency measures are included to cover the eventuality that RIS3 funding is not forthcoming within the plan period. It is not clear that the potential impact of development on transport networks can be addressed in the absence of the A27 Chichester bypass improvements project.
Achieving net zero, reducing emissions reduction, acting on climate, and supporting thousands of new homes and new employment developments will be problematic with existing processes. New, additional, and adapted processes and assessments will likely be required, especially in assessing Transport Assessments, mandating Travel Plans and monitoring traffic associated with new developments. We acknowledge that change is complex, expensive, and time-consuming, especially for smaller district level Councils. But the hard work will deliver benefits for the Council and residents in the longer-term.
National Highways seeks to continue working with the Council and WSCC to progress coordinated and deliverable packages of interim mitigation measures and alternative transport solutions while a long-term strategic solution is considered by government. This must however be in combination with a robust monitor and manage policy that appropriately manages the risk of unacceptable road impacts resulting from new housing
and other development over the Plan period.

We have been in discussion with Chichester District Council regarding their proposed Monitor and Manage Strategy. At present, we do not consider the current strategy to be robust and we seek further information and detail especially on who, when and when monitoring and management will be undertaken. Developments in the right places and served by the right sustainable infrastructure delivered alongside or ahead of occupancy must be a key consideration when planning for growth in all local authority areas. Any M&M framework must be based on a “worst case scenario” whereby necessary transport mitigation is understood, as well as setting out the desired alternative scenario. It must set out details of responsibility, funding and governance of the framework together with the methodology for determining the timing for any mitigation delivery while remaining clear on the fallback position where identified mitigation or desired alternatives are not ultimately achievable. The M&M framework must set out that the alternative to mitigation not being delivered is that development does not proceed where that development would give rise to unacceptable road safety risk or severe cumulative impacts on the road network in the absence of that mitigation. The M&M framework must be translated into development management plan policy and policy relating to development allocations.
As we have reiterated throughout our comments, we welcome the opportunity to work with you to address these outstanding matters and we will continue to liaise over submitted Transport Assessment, Travel Plan policy and Monitor and Manage Policy to help to work towards a viable plan.
We hope our comments assist.
We look forward to continuing to participate in future consultations and discussions. Please do continue to consult us as the Plan progresses so that we can remain aware of, and comment as required on, its contents.
Once you have had the opportunity to digest all the representations received, we would welcome a meeting to run through all the transport related matters and agree how to progress any required evidence gathering or other work.

Attachments: