Policy AL7: Highgrove Farm, Bosham

Showing comments and forms 31 to 60 of 82

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1052

Received: 07/02/2019

Respondent: Bosham Football Club

Representation Summary:

Bosham Football Club would welcome being relocated to this area and once the facilities are phased in and provided by 106 and other agencies to include with other public bodies to provide first class recreational facilities and buildings to the benefit of the community and the club. Not a single use facility but can reach out to many uses of all ages.
It will also welcome being part of a working group to identify a key site along with the Parish Council, District Council and agencies.

Full text:

The policy fails to mention there is a shortfall of recreation and open space facilities as is evidenced by the Council's own Open Space Study Report carried out to inform the review of the local plan (Chichester Open Space, Sports Facilities, Recreation Study and playing Field Strategy Part 1 of 2 - September 2018). Section 5.2 and Table 6 of Part of this study identifies the Parish of Bosham to only have 1.03 hectares of parks and recreation grounds open to the public. This is the Walton Lane recreation ground owned by the Parish Council and home to Bosham Football Club since 1901. This is the only public open space in the village.
Paragraph 7.2, Table 14. This details the supply (hectares) against the Chichester Local Plan Area quantity standards - identifying a deficit in some parishes. For Bosham (population in 2011, 2900) it is showing a deficit of -2.45 hectares of parks and recreation grounds. With also a minus for youth provision of -0.14. It is worth noting that within the district this is third largest and nearly twice the deficit of the City of Chichester.
The policy does not set out identifiable provision to make up this deficit. As this is the large allocation for development in the parish this site must provide for what has been identified in the study much needed parks, recreation ground and public open space. Paragraph 6.55 of the introduction to the policy makes only brief reference to the identification of new open space and no reference at all to the findings of the Open Space Study.
The policy AL7 itself in bullet point four requires "Provision of on-site public open space and play areas. This is extremely weak and again makes no reference to the current parish deficit in all types of open space to meet the community needs. The policy provides approx 13 hectares of land and a maximum of 250 houses. This will of course generate its open space requirements, approx 0.75 to 0.85 hectare based on 500/600 new residents. Therefore in total for open space and recreation grounds approx. 3.40 hectares (8.2 acres) should be provided as part of this development proposal. In addition 0.15 hectare is required for youth facilities.
The site itself on its northern and eastern boundaries is suitable, environmentally and safety-wise is well connected locally to village shops, train station and the A259 for open space, recreation and community facilities uses. If 13 hectares has been identified then its use can meet the local plan needs and give represtantion to Policy S12, S21, S32, DM7, DM23 and DM34.

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1143

Received: 25/01/2019

Respondent: British Horse Society

Representation Summary:

Support and welcome the requirement for opportunities for the provision of green infrastructure with links to the wider countryside to be explored. Creating new routes and links is especially important on the Coastal Plain, where an off-road multi-use path network would be of great benefit to all NMUs.

Full text:

The British Horse Society (BHS) is the UK's largest equine charity and equestrian membership organisation and the governing body for recreational riding. Its charitable objects include the promotion of equestrian safety, particularly on roads, and equestrian access to bridleways and other off-road multi-use routes for the public benefit. On behalf of The Society I would like to make the following comments:

Chichester Local Plan Review 2016-2035 Preferred Approach

The Society's priority when commenting on this document is to try and ensure that the policies and wording in the text include commitments to support and protect vulnerable road user groups, including equestrians (West Sussex Transport Plan, page 32, para 1.4.5), from the dangers they face on local roads due to the inevitable increase in traffic on these roads brought about by planned housing development.

The Plan area covered is home to a large number of equestrians, who bring significant economic benefits, especially to rural communities, but unless they have access to a safe network of bridleways, byways, and other off-road informal recreational routes which they can use daily, the dangers to horse riders will increase, and the industry will struggle to survive.

Policy S18: Integrated Coastal Zone Management for the Manhood Peninsula (page 68)
Equestrians on the Manhood Peninsula feel increasingly unsafe on the local roads they have always used, where the speed and volume of vehicles has grown considerably, and will do so even more as a result of the proposed housing development. There are now more than 500 horses kept in the area (Manhood Riding Club count) in private stables, livery yards, and the local Riding School (at which the Chichester Group of Riding for the Disabled is based).

We would, therefore, absolutely support objective 5 of this Policy "Improve infrastructure to support sustainable modes of transport, especially cycle ways, bridleways and footpaths, including the National Coastal Footpath ".

We would suggest the best way to do this is to ensure that at least one multi-use route (bridleway) is provided through, or around the fringe of developments, which can also serve as a green corridor for leisure and recreation and, and benefit health and well-being, wildlife and biodiversity. These routes can form the basis of a safe non-motorised user (NMU) network and link with existing public rights of way (prow) where possible.

Policy S20: Design (page 74)
Bullet point 5 - wording is supported "incorporates and/or links to high quality Green Infrastructure and landscaping to enhance biodiversity and meet recreational needs, including public rights of way."
However, it is important as mentioned above that this incudes 'multi-use' public rights of way for the benefit of all.

Transport Infrastructure
Para 5.15 - very good to see "bridleways" included in this para.
Para 5.16 - The wording "There is an extensive public rights of way network across the plan area... is misleading. The wording implies that this prow network is available to all users, whereas on the Coastal Plain the prow network consists almost entirely of footpaths, which are not available for use by cyclists and equestrians. Upgrading appropriate/suitable prow to bridleways would contribute to the West Sussex Transport Plan (2011-2026) aim of "improving safety for all road users", mentioned in para 5.18.

Policy S23: Transport and Accessibility
Bullet point 8 - Our view is that the objective "improving safety for all road users", should be included in the actual Policy wording, not just in the accompanying text. However, it is good to see 'public rights of way' included, which need to be multi-use bringing safety benefits for all vulnerable road users.

Countryside and Countryside Gaps (page 82)
Para 5.37 - Absolutely agree the plan area's countryside is an important and diminishing resource, and the Council's aim to protect the countryside from the urbanising impacts of development is welcomed. For existing and future residents, the opportunity to enjoy 'informal recreation' (walking, cycling, horse riding) in the countryside is important for leisure, health, and well-being. The Council needs to take a very active role in ensuring that any development provides benefits, most likely in the way of safe, off-road multi-use routes(green links), and the mention of this in para 5.40 is welcomed.

Policy S32: Design Strategies for Strategic and Major Development Sites (page 92/93)
The references in Point b, "movement and access arrangements and Green Infrastructure provision", in Point e, "community leisure and recreation facilities as appropriate", and Point g, "contain a Green Infrastructure framework to ensure that public and private open space standards are met, relate well to each other and to existing areas and that the new spaces are safe, convenient, accessible and functional" are welcomed.
However, it is important that leisure and recreational routes, and new prow connect to the wider countryside for public benefit, and are not just contained within a development. There are many examples in the county where new routes have been created across or on the fringe of a development, which link to a wider network of recreational routes. The National Planning Policy Framework (NPPF), para 98, states "Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks"

Policy AL1: Land West of Chichester (page 96)
Point 4 - whilst welcoming the provision of "open space and green infrastructure", this development provides an excellent opportunity to improve links to the wider countryside, in particular to BW 270 and Park Lane (which should be formally dedicated as a prow).
Point 10 - An "appropriate landscaping buffer", is also an excellent opportunity to provide a multi-use prow (bridleway), for the safety and enjoyment of all vulnerable road users, which as a 'green corridor, would also contribute to green infrastructure.
We would also request that when looking at 'key landscaping' of the Centurian Way (CW), the issue of upgrading this to a multi-user path where possible, to include equestrians is considered, so that they can also benefit from a safe and secure off-road environment. The CW is the only disused railway line in the county that is not available for use by all NMUs. The Worth Way and Downs Link are fully multi-use, and are highly valued and well used.

Policy AL2: Land at Shopwyke (Oving Parish) (page 99/100)
Point 9 - Despite repeated requests for the proposed bridge connection across the A27 at Coach Road (a route used by all NMUs until it was severed when the A27 was realigned) to also be made available for equestrian use, it would appear from the Policy wording that horse riders continue to be excluded, despite the large numbers of horses kept in the Oving area.

At present, riders have to box their horses over the A27 to access the safe network of bridleways and riding routes in the National Park, which is a situation contrary to the aims and objectives set out in this Plan. In order to gain maximum benefit from bridge infrastructure, it should be made available for as many users as possible.

Policies AL3 to AL14
All of these Policies require opportunities for the provision of green infrastructure with links to the wider countryside to be explored, and these are welcomed and supported. Creating new routes and links is especially important on the Coastal Plain, where an off-road multi-use path network would be of great benefit to all NMUs.

The West Sussex Rights of Way Management Plan 2018-2028 has Objectives (page 3) which include:
2. Improve path links to provide circular routes and links between communities.
3. Improve the PRoW network to create safe routes for both leisure and utility journeys, by minimising the need to use and cross busy roads.
4. Provide a PRoW network that enables appropriate access with minimal barriers for as many people as possible.
5. Promote countryside access to all sections of the community enabling people to confidently and responsibly use and enjoy the countryside.

The Plan also states in Improvement schemes (page 13), that "A starting point for new schemes will be to consider who could benefit from a new route, such as walkers, cyclists, horse riders and the disabled, and be as inclusive as possible, often the aim will be to achieve at least bridleway status.

Policy DM32 Green Infrastructure (page 199)
It is disappointing that the wording (on page 197/198) omits to mention that prow (footpaths, bridleways, byways), are defined by Natural England, and also recognised nationally, as multifunctional 'green corridors', and are therefore part of GI. Providing a multi-use (walker, cyclist, equestrian) prow or recreational route around the periphery would comply with NPPF, para 98, as mentioned above.
It is good to see public rights of way, and bridleways mentioned in Point 4 of the Policy, although the wording "do not lead to the dissection of the linear network" appears to be rather negative, much better to tell someone what they should do "The proposals protect, and contribute to the improvement of ........"

Policy DM34: Open Space, Sport and Recreation .... (page 204)
We support the aim to "seek to retain, enhance, improve access and increase the quantity and quality of....rights of way including improvement of links to them." This will be of great benefit to all NMUs.

Point 1 - Excellent to see requirement for development to contribute to new links to the existing rights of way network, which should be multi-use wherever possible.
Also support the aim to secure on-site provision secured via S106 agreements to provide (amongst other things) links to the existing rights of way network to meet any identified shortfalls in the local area, and would request in line with the WS RoW Management Plan that these links will be "as inclusive as possible, often the aim will be to achieve at least bridleway status."

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1207

Received: 05/02/2019

Respondent: Mrs Gail Powell

Representation Summary:

Highgrove does not pass the Sustainability Appraisal test.
Loss of grade 1/2 agricultural land.
Surface water flooding - Site has very high water table and there is a danger of flooding downstream.
Foul Water - Danger of foul water flooding due to poor maintenance of infrastructure.
With so many more houses with small gardens more Open Space is required, not less.

Full text:

It is difficult to understand the decision to allocate this site when so much of the supporting documentation, the Sustainability Appraisal, indicates that Highgrove Farm is of medium/low capacity and states 'It is possible some built development may be accommodated within the existing cluster of buildings to the north of Broadbridge. Highgrove would result in a stand alone estate to the east of the existing village, intruding into the gap between Bosham and Fishbourne and obliterating the views from the AONB to the South Downs.
It seems illogical to allocate grade 1 and 2 farming land for housing when less valuable land must be available within the district.
Surface water flooding - the site is known to have a very high water table so it will be very difficult to control the release of excess water at a reasonable rate. This water will drain to the south-western corner and from there into what is known as the East Ditch. The East ditch flows into the harbour at Stumps Lane. When the tide is high there is no where for this water to go except into the surrounding roads and houses.
Foul water - Although there may be sufficient headroom at the Harts Farm WwTW the pipe infrastructure has had little attention since it was installed in 1939. It's poor state has given rise to the frequent flooding of streets and houses during times of heavy rainfall. At these times foul water is also pumped into the harbour via the CSO at Stumps Lane. It is the responsibility of Southern Water to ensure that the correct infrastructure is in place to cope with new development. Currently they are unable to cope with the current situation. Conflicting information given by Southern Water is making it difficult to have confidence in them.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1269

Received: 06/02/2019

Respondent: Mr Stephen Robson

Representation Summary:

We would go along with the proposals for Highgrove if and only if there were legally binding and strongly enforceable conditions for a school on the site, for a community hall (to replace St Nicholas Hall), a good sized recreation area including a children's playground, a doctor's surgery, allotments, and parking spaces for each unit of accommodation. We would also suggest having an architectural competition to produce an interesting mix of property. No work should start until Southern Water have built a system capable of handling the sewerage from the development.

Full text:

We would go along with the proposals for Highgrove if and only if there were legally binding and strongly enforceable conditions for a school on the site, for a community hall (to replace St Nicholas Hall), a good sized recreation area including a children's playground, a doctor's surgery, allotments, and parking spaces for each unit of accommodation. We would also suggest having an architectural competition to produce an interesting mix of property. No work should start until Southern Water have built a system capable of handling the sewerage from the development.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1291

Received: 06/02/2019

Respondent: Mr Peter Newman

Representation Summary:

Object on the basis of:
- loss of grade 1 and 2 agricultural land
- SDNP and AONB setting
- drainage and sewerage
- surface water concerns
- ecological buffer zone
- coalescence of communties on A259.

Full text:

The arguments made below have been strenuously placed before you before the allocation of land on this site for the building of 50 houses. I will repeat them in the fervent hope that this absurd requirement that the remainder of the 13ha allowed for housing development, be reversed.
Agricultural land - Grade 1 and 2 land should not be lost especially when Brexit may require a greater reliance on UK food production.
National Park and AONB setting. - The AONB is mostly water, thus its land fringes are of utmost importance and must be protected. The views to and from the Park would be compromised.
Drainage and sewerage. - The Harbour frequently receives untreated sewage via the allowed overflow pipes. In times of heavy rain the streets of Bosham are awash with sewage. The addition of the Hospice and the already agreed extra housing, although mitigated by SUDS for surface water, add to the overload at Harts Farm wastewater plant. It is a "cop out" to insist that Southern Water has a statutory duty to deal with this. They don't. Surface water from this site could overwhelm the lower areas of Bosham which are already prone to catastrophic flooding (cf 2012) The high water table on this site will inhibit the reliance on SUDS and very expensive mitigation strategies will have to be employed.
Ecological buffer zone. - The urbanisation of the A259 must not be allowed to interfere with the need for wildlife to freely interconnect between the Park and coastal areas. The AONB is of international importance and is protected, including its fringes by Ramsar, SSSI.
Joining of Communities. - the coalescence of communities must be inhibited along the A259. This is the beginning of an urban sprawl that could link Chichester to Emsworth and beyond. This is stated as policy, but curiously, is ignored.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1297

Received: 06/02/2019

Respondent: Mr Michael Edwards

Representation Summary:

This site is one of the very few remaining between Chichester and Havant on the A259 with unobstructed view of the Downs to the north. Development of this area will accelerate the loss of identity between the Portsmouth and Chichester areas as well as Hampshire and West Sussex.
Concerns over sewage disposal and flooding remain for this site as well as exacerbation of traffic access to Chichester

Full text:

This site is one of the very few remaining between Chichester and Havant on the A259 with unobstructed view of the Downs to the north. Development of this area will accelerate the loss of identity between the Portsmouth and Chichester areas as well as Hampshire and West Sussex.
Concerns over sewage disposal and flooding remain for this site as well as exacerbation of traffic access to Chichester

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1315

Received: 06/02/2019

Respondent: Rosellen Mates

Representation Summary:

There should be NO development until the drainage/sewerage issues sorted. It is not enough to declare that it is Southern Water's statutory duty

There should be NO development until the greater area transport systems are sorted

This is the wrong place to put a mass development. The Council's own consultants have pointed out the damage to the historic views of Downs. Harbour and Cathedral..
This document lumps the area From emsworth to Chichester into one suburban sprawl.

There is no provision for realistic wild life corridors.

There is no evidence base for inclusion of a two form BOSHAM primary school

Full text:

There should be NO development until the drainage/sewerage issues sorted. It is not enough to declare that it is Southern Water's statutory duty

There should be NO development until the greater area transport systems are sorted

This is the wrong place to put a mass development. The Council's own consultants have pointed out the damage to the historic views of Downs. Harbour and Cathedral..
This document lumps the area From emsworth to Chichester into one suburban sprawl.

There is no provision for realistic wild life corridors.

There is no evidence base for inclusion of a two form BOSHAM primary school

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1329

Received: 06/02/2019

Respondent: Mr Adrian Harrison

Representation Summary:

The provision of a suitable entrance from the A259 into the site is of paramount importance, especially in light of the DOG'S BREAKFAST that is currently being constructed at the junction with Walton Lane and the A259,and the fact that it will be on a very dangerous bend in the road!!

Full text:

The provision of a suitable entrance from the A259 into the site is of paramount importance, especially in light of the DOG'S BREAKFAST that is currently being constructed at the junction with Walton Lane and the A259,and the fact that it will be on a very dangerous bend in the road!!

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1334

Received: 06/02/2019

Respondent: Mr Adrian Harrison

Representation Summary:

It is of utmost importance that the sewerage system will be able to cope with the extra demand,as it will be under even more pressure when the new Hospice gets on line!!
Also I have still not seen any explanation as to the so called Treatment Plant (which featured in the original proposal) supposedly to be sited adjacent to the drainage ditch and the A259
I am also concerned as to the effect there will be on DRAINAGE of the site,it already becomes waterlogged with any significant rainfall!!

Full text:

It is of utmost importance that the sewerage system will be able to cope with the extra demand,as it will be under even more pressure when the new Hospice gets on line!!
Also I have still not seen any explanation as to the so called Treatment Plant (which featured in the original proposal) supposedly to be sited adjacent to the drainage ditch and the A259
I am also concerned as to the effect there will be on DRAINAGE of the site,it already becomes waterlogged with any significant rainfall!!

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1336

Received: 06/02/2019

Respondent: Mr Adrian Harrison

Representation Summary:

This proposal seems to fly in the face of the Council's own policy of maintaining strategic gaps between outlying villages.
There is a danger of not only getting to SOLENT CITY,but SOUTHCOAST CITY! if it carries on with the CREEP.
Has any consideration been given to the need for road network improvement,which will be sorely needed?
Lastly but by no means least,I am concerned at the possibility of LIGHT POLLUTION from the site,as I am a keen amateur astronomer,and that could spoil my observing.

Full text:

This proposal seems to fly in the face of the Council's own policy of maintaining strategic gaps between outlying villages.
There is a danger of not only getting to SOLENT CITY,but SOUTHCOAST CITY! if it carries on with the CREEP.
Has any consideration been given to the need for road network improvement,which will be sorely needed?
Lastly but by no means least,I am concerned at the possibility of LIGHT POLLUTION from the site,as I am a keen amateur astronomer,and that could spoil my observing.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1397

Received: 06/02/2019

Respondent: Mr Chris Adams

Representation Summary:

Issues regarding separation of Fishbourne and Bosham, traffic and congestion, village identity, flooding, drainage, damage to views of South Downs and landscaping design all fail to be adequately addressed. The 'minimum of 250 houses' is a clear representation of the lack of complete thought regarding the true scope of this development.

Full text:

There are significant differences in the criteria and policy being applied to SA7 when compared with SA9 and SA10. These must be addressed to ensure a consistent policy and strategy for growth across the wider area. These include transportation provision, landscaping design and site access.

There are real fears that building will significantly increase flooding (on and offsite) due to the high water table. The southwest corner of the high grove site flooded again this year - as it does every winter. There is no waste water management plan (drainage, sewerage) and changing the land use will worsen this situation and should have full mitigations in place.

There would be considerable loss to eco-systems and wild life corridors, resulting in habitat fragmentation.

The development will block many long distance views of the Southdowns and damage the setting of the National Park, the AONB generally.

It would lose the distinctiveness of the settlements of Fishbourne and Bosham.

There is no evidence (in the Document) to justify the proposed two form entry (420 number) primary school.

There are currently significant issues relating to traffic and congestion based on the existing population. The additional growth does not demonstrate any clear thought as to how to satisfactorily relieve present traffic issues, never mind future congestion and resultant diminution of air quality.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1425

Received: 07/02/2019

Respondent: Mr Nicholas Pyke

Representation Summary:

Object to a number of points in policy AL7 including criterion 3 and 5 para 6.56, drainage, views, ecology, numbers proposed, landscape setting, number of houses proposed, open space.

Full text:

REPRESENTATIONS ON THE CHICHESTER LOCAL PLAN
HIGHGROVE FARM BOSHAM: POLICY AL7

1 Bosham has similar planning issues to Fishbourne and Chidham/Hambrook relating to the location and form of development including landscape setting, relationship to AONB and National Park, drainage, highways and protecting the separate and distinct identities of these villages.

2 An analysis of the Policies AL7 Highgrove Farm Bosham, AL9 Fishbourne Parish and AL10 Chidham and Hambrook Parish shows that there are inconsistencies between the policies for the three villages and that the policies for Bosham are less stringent than for the other two villages.

REP1: OBJECTION TO CRITERION 3 OF AL7
3 Policies AL9 and AL10 both include criterion 3 which state:
"Provision of suitable means of access to the site(s) and securing necessary off-site
Improvements (including highways) to promote sustainable transport options;"

However, criterion 3 of SA7 states:
"Provision of a satisfactory means of access from the A259;"

4 Bosham is a village with two centres severed by the A259. For reasons of social cohesion and to ensure that the new development has satisfactory pedestrian links with the facilities to the south of the A259, including the small employment areas and community facilities, it is essential that some form of pedestrian crossing and other pedestrian infrastructure is installed to support the new development. At the moment the strategy being promoted by the Council cuts against social cohesion and is clearly an inappropriate strategy compared with the alternative which is to require a crossing. Criterion 3 should therefore be more appropriately worded to allow these issues to be delivered. It is recommended that criterion 3 should be redrafted to state:
"Provision of primary access from the A259, pedestrian access to the western side of the site and securing necessary off-site improvements (including highways) to promote sustainable transport options. This would include an appropriately located pedestrian crossing and a footpath link;"

REP2: OBJECTION TO CRITERION 5 OF AL7 - INCONSISTENT POLICY WORDING
5 I am of the view that there is an inconsistency between the policies and their supporting text concerning the treatment of the landscape surrounding Fishbourne and that surrounding Bosham, particularly that part of the village north of the A259. Consequently the policy wording is not effective and will not deliver the most appropriate strategy for the site.

6 Policy AL10 allocates land at Chidham and Hambrook for 500 dwellings. Policy AL9 allocates land at Fishbourne for 250 dwellings. Criterion 5 of each of these policies considers issues of landscape impact when it states:
"Detailed consideration of the impact of development on the surrounding landscape,
including the South Downs National Park and Chichester Harbour AONB and their
settings. Development should be designed to protect long-distance views to the South
Downs National Park;

7 It is logical to include the same criterion 5 in each of these policies since both settlements are close to the South Downs National Park and Chichester Harbour AONB. Bosham occupies a location between Fishbourne and Chidham/Hambrook settlements. Bosham experiences exactly the same setting as those settlements referenced under PolicyAL9 and AL10.

8 It is therefore surprising that criterion 5 of Policy AL7 relating to Bosham states:
"Provision of landscaping and screening to minimise the impact of development on
Bosham, and the setting of the Chichester Harbour AONB and South Downs National
Park, including views to and from the wider and surrounding area;"

9 My concern is that the wording of this criterion implies less stringent assessment and appraisal of the landscape setting related to the AL7 allocation than is the case with Policy AL9 and AL10. This is despite Highgrove Farm Bosham having an arguably more sensitive relationship to the Chichester Harbour AONB and with clear views across the site to the South Downs National Park. The consequence of this is that there is no policy requirement in policy AL7 for a "detailed consideration of the impact of development on the surrounding landscape". The criterion 5 wording of AL7 also does not include any requirement for proposals to be "designed to protect long-distance views to the South Downs National Park".

10 A Landscape Capacity Study November 2018 has been undertaken by Terra Firma for Chichester District Council. The site at AL7 falls within character sub area 91 of the study. The assessment section of this study makes reference to the long views across the study area to the hills within the SDNP and to the valued views identified in the Bosham Parish Neighbourhood Plan. The conclusion and recommendation includes the statement that "Great care would need to be taken to avoid any landscape or visual harm ensuring the separate identities of the settlements are protected and considering valued views". This strengthens the argument for a more robust set of criteria similar to that for policies AL9 and AL10.

11 The lack of such a policy wording implies that the landscaping and design associated with the Highgrove site (SA7) will be judged against a lower threshold than with the AL9 and AL10 housing allocations. The policy is therefore not effective and neither would it deliver an appropriate design strategy for the site

12 It is proposed that to ensure that the plan is consistent, sound and recognises the same sensitivity as a result of the proximity of the Chichester Harbour AONB, criterion 5 be amended to state:
"Detailed consideration of the impact of development on the surrounding landscape, including the South Downs National Park and Chichester Harbour AONB and their settings. Development should be designed to protect long-distance views to the South Downs National Park and Chichester Harbour. Provision of landscaping and screening to minimise the impact of development on Bosham, and the setting of the Chichester Harbour AONB and South Downs National Park, including views to and from the wider and surrounding area shall form an integral part of any application;

REP3: OBJECTION TO PARAGRAPH 6.56
13 This paragraph is in the preamble to Policy AL7 and sets out the specific issues that need to be taken into consideration when planning the development of the allocated site.

14 In paragraph 6.65 of the Policy AL9 the preamble states that:
"Protecting the separate distinct identity of Fishbourne in relationship to surrounding settlements, including Chichester City;"

15 This is logical since the development of 250 homes on land around this settlement could result in a design which is out of keeping with the wider character of the area. In addition, Fishbourne is close to Bosham and consideration of design needs to recognise and plan for that proximity.

16 In the case of Bosham, no issue relating to 'distinct identity' is raised in the supporting text. This is considered to be unsound because the settlement of Bosham has a particular distinct identity and the AL7 allocation is on the eastern side of the village and would draw development closer to Fishbourne. It cannot be the case that Fishbourne has supporting text which seeks to protect its special identity but Bosham, with a large allocation does not. This would not deliver an effective plan due to the inconsistency and neither would it deliver an appropriate growth strategy for Bosham

17 The settlement or village of Bosham is comprised of two built up areas. A neighbourhood called Broadbridge to the north of the A259 and an area located around the historic harbour. Whilst physically separate, they each form part of 'the village' and are interrelated in terms of activity and service offer. The allocation of 250 new homes at Highgrove is a significant number when compared to the existing number of dwellings in Bosham. Consequently, it is important that the identity of Bosham is carefully considered when designs are drawn up. The NPPF continues to advise that design should be of a high quality and certainly this is an important issue when setting the policy context for AL7.

18 It is recommended that a new bullet point be added to paragraph 5.56 which states:
"Protecting the separate distinct identity of Bosham in relationship to surrounding
settlements, including Fishbourne;"

REP4: OBJECTION TO POLICY AL7
19 I am concerned that the policy fails to give appropriate guidance on matters of environmental importance and this is contrary to the NPPF. In both policy AL9 and AL10, a criterion states:
"Demonstration that development would not have an adverse impact on the nature conservation interest of identified sites and habitats;"

20 There is no such criterion in the case of the Highgrove allocation AL7. Environmental assessments have already taken place in connection with application 17/03148/FUL and the site allocations document which allocates a smaller part of Highgrove Farm for 50 dwelling units. This research has identified a population of slow worms on the site. It is also the case that Brent Geese, a species protected under Law, have used the open fields for landing. Given that there is ecology of acknowledged importance, it is considered that to be compliant with NPPF a criterion should be added which protects the habitat and ecology of the area. This would comply with NPPF and be consistent with the way other sites have been treated. The new criterion should state:
"Demonstration that development would not have an adverse impact on the nature conservation interest of identified sites and habitats;"

REP5: OBJECTION TO POLICY AL7
21 Policy AL9 and AL10 include a criterion which states:
"Provide mitigation to ensure the protection of the SPA, SAC and Ramsar site at Chichester Harbour as a result of water quality issues relating to runoff into a designated site, and loss of functionally linked supporting habitat;"

22 Policy AL7 does not include this criterion yet the allocation is as close to the protected Harbour and water courses that flow into it as the sites promoted at AL9 and AL10. In the case of Highgrove Farm there is a drainage ditch running along the southwest corner which would need effective management to ensure hydro carbon pollutants do not enter the catchment. It is therefore inconsistent and contrary to NPPF that AL7 does not have the same criterion. A new criterion should be included which states:
"Provide mitigation to ensure the protection of the SPA, SAC and Ramsar site at Chichester Harbour as a result of water quality issues relating to runoff into a designated site, and loss of functionally linked supporting habitat;"

REP6: OBJECTION TO POLICY AL7
23 A consultation exercise carried out by Bosham Parish Council in December 2018 revealed widespread local concern and anecdotal evidence concerning the ability of the site to drain safely and effectively. The drainage ditch to the southwest corner regularly floods as a result of it being of insufficient capacity and poor management. There is a high water table on the site which aggravates the situation. There is no robust or credible evidence to suggest that this issue should not be specifically identified as a criterion in Policy AL7.

24 The approved development of 50 houses at Highgrove (17/03148/FUL) has a significant area within the development site which is required for storm surface water balancing ponds/SuDS /underground storm water crates within the open space area. For a 250 house scheme the area requirements for would be significantly higher. Any area required for drainage should sit outside of that required for open space, ecological mitigation and other community infrastructure. The number of houses proposed should take into account the space required for the storm surface water balancing ponds/SuDS /underground storm water crates.

25 It is therefore considered that some on site Suds or attenuation pond will be necessary as part of the scheme. The area necessary would need to be established through studies and would need to be independent of the overall open space requirement of the site. AL7 should link to Policy DM18 and the requirements contained in that policy.

REP7 - OBJECTION TO POLICY DM34 - OPEN SPACE
26 The revised Open Space, Sport and Recreation Study including Indoor Sports Facilities and Playing Pitch 2018 has reduced the requirement for open space by almost a third across the whole district compared with the previous policy approach. The District wide reduction in open space requirements may penalise those Parishes where an existing shortfall exists. It is not an appropriate strategy compared with the previous standards for open space.

27 The information in Table 14 of the Chichester open Space Study (Main Report) September 2018 shows that Bosham has the third highest shortfall in the parishes in the District of Parks and Recreation Grounds combined. The extract of the table below shows that in every category Bosham has a significant deficiency.


It is considered that the new standards should not form the basis for the open space requirements for AL7 and that the previous standards should be retained to address the circumstances of Bosham.

REP 8 - OBJECTION TO POLICY AL7 IN RESPECT OF LANDSCAPE CAPACITY, POLICY DM28 NATURAL ENVIRONMENT AND DM19 CHAONB
28 The Highgrove site is located on grade 1 and 2 agricultural land. It would have an adverse impact on the setting of the CHAONB.

29 The draft Landscape Capacity Study (published by Terra Firma, November 2018) concludes that the landscape in which AL7 draft site allocation is located has only medium/ low capacity for landscape change and states "Great care would need to be taken to avoid any landscape or visual harm ensuring the separate identities of the settlements are protected and considering valued views".

30 The character area in which Policy AL7 is located has been assessed as having a medium/ low capacity. The definition of this is:
Medium / Low capacity (orange) - A low amount of development may be accommodated only in limited situations, providing it has regard to the setting and form of existing settlement and the character and the sensitivity of adjacent landscape character areas. In some cases no development would be acceptable and the reason for this is explained in the conclusion.

31 The final paragraph of the character area assessment states:
It is possible that some built development may be accommodated within the existing cluster of buildings and potentially to the north of Broadbridge provided it is informed by further landscape and visual impact assessment and sensitively integrated into the landscape, respecting the historic settlement pattern and local distinctiveness. Great care would be needed to be taken to avoid any landscape or visual harm ensuring the separate identities of the settlements are protected and considering valued views. (NB the BPNP identifies valued views across Highgrove to the South Downs)

32 The housing numbers proposed in Policy AL7 should be reviewed in the light of the Terra Firma assessment conclusions and also the need for on site SUDS and drainage, a 2 form entry school, open space, suitable landscaping and mitigation, suitable ecological mitigation and impacts on the CHAONB. Any development must also have regard to the character of the area and a density which reflects that of the surrounding area. It is noted that Draft Policy DM3 explains at criterion 'b' that locations adjacent to sensitive locations may justify lower densities.

33 The policy AL7 should be reworded to ensure that the extent, layout and numbers proposed in the policy can be achieved while taking account of the above representations.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1434

Received: 06/02/2019

Respondent: Mr David Broughton

Representation Summary:

Object to allocation:
- traffic
- sewage capacity
- flooding
- loss of wildlife corridor
- destruction of historic landscape/views
- no evidence for need for school in Broadbridge
- traffic congestion
- light/noise pollution
- loss of protected species

Full text:

I am writing to object to the proposal to build 250houses at Highgrove Farm
Bosham on the following grounds:

1. Increased traffic on local roads which are inadequate for the increase in
traffic.
2. Sewage overload
3. Increase risk of local flooding.
4. Closing of the wildlife corridor between East Ashling, Broadbridge and
Chichester Harbour which is contrary to CDC's policy of preserving such
corridors and which recent surveys have shown that species are using this
corridor.
5. Destruction of historic landscape and views between the South Downs
National Park and Chichester Harbour AONB.
6. No evidence of the need for a two form entry school on the north edge,
bringing in pupils thereby resulting in unnecessary increase in congestion.
7. No consideration of the impact of the A27 plans leading to increased
congestion.
8. Increased light pollution on the edge of the South Downs designated dark
skies area.
9. Destruction of protected species, stag beetles, which are found on the
site.
10. Increased noise and pollution.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1439

Received: 07/02/2019

Respondent: Mr Michael Neville

Representation Summary:

Only token statements in terms of environmental impact and sustainability.

Not safe to get around by bike/foot. I am calling for a serious commitment to sustainable travel around all of these houses being built.

If there is a new school north of the A259, families MUST be able to walk and cycle there safely. This requires a cycle path linking Bosham with Broadbridge seperate from any road. It also requires a subway under the A259.

Must be protected corridors between the harbour and the South Downs. This plan does not go far enough to protect these species for future generations.

Full text:

As a resident of Bosham with a young family, I have major concerns about what I observe happening to our environment on a daily basis. I am not against building new houses and as someone who has struggled to get on the property ladder, I understand this requirement. However, developments are happening at an alarming rate with only token statements in terms of environmntal impact and sustainability. I cycle everywhere, when I cannot cycle, I walk. I encourage my children and friends to do the same. However, I am increasingly torn as to whether I should do so. It is simply not safe to get around by bike or on foot. Our roads are congested, dangerous and aggressive places to be. There has been no clearer example of the conflict between development and sustainable travel than the new St Wilfreds Hospice building in Bosham. Clear;y, an inspiriational project with great acrhitecture and a wonderful vision. But the changes to junctions around the development has driven so much traffic around the normally relaxing and quiet Chequers Lane (part of the South Coast Cycle Route) and one of the only reasonable sections of my commute to work each day. As we build, traffic grows. People become more aggressive in ther driving. Any quiet route for cycling becomes a speedway for those looking for their latest short cut. People will not commit to sustainable travel if the networks are not in place. I am calling for a serious commitment to sustainable travel around all of these houses being built. If there is going to ba a new school north of the A259, families MUST be able to walk and cycle there safely from all parts of the village. This requires a cycle path linking Bosham with Broadbridge seperate from any road. It also requires a subway under the A259 (it is already impossible to cross safely)

There is also the concern for local wildlife. There must be protected coriddors between the harbour and the South Downs. I regularly spot Barn Owls, deer, foxes around the proposed site for development. This plan does not go far enough to protect these species for future generations to enjoy.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1453

Received: 06/02/2019

Respondent: Mr Gary Snook

Representation Summary:

Object/concerns on:
- loss of strategic gap
- sewage capacity
- flooding
- loss of wildlife corridor
- no need for school in Broadbridge
- no consideration of other sites

Full text:

I would like to register my concern and objections to the proposed 300 houses and development at Highgrove Bosham.

The Strategic Gap is being eroded towards ribbon development and urban sprawl.

The existing sewerage system is near to breaking point already so this would put the system in an even more precarious position.

Due to the added development, there will be an increased risk of flooding due to high water table and poor drainage.

Closing the wildlife corridor between east ashling , broad bridge and Chichester harbour, which is contrary to CDC's own policy of preserving such corridors.

There will be a further distraction of the historic scenic landscape and views between the South Downs national park and Chichester harbour AONB.

There is no evidence of the need or desire for a two form entry school on the north edge. Bringing in students from many directions, creating increase of car movements and the closure of a poplar and successful school.

There seems to have been no consideration of other sites closer to the village centre, or sites north of Chichester.

The roads plan to favour the through traffic along the A27 and reintroduces. Plans for a southern link road and road plans that have already been rejected in the A27 consultations( options 2&3) This would cause an increase of traffic on the A259, more congestion around the Tesco's roundabout which is already a very dangerous one and increased air pollution.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1472

Received: 06/02/2019

Respondent: Mr Joe Broughton

Representation Summary:

1. Increased traffic on local roads which are inadequate for the increase in
traffic.
2. Sewage overload
3. Increase risk of local flooding.
4. Closing of the wildlife corridor
5. Destruction of historic landscape and views
6. No evidence of need for a two form entry school on the north edge
7. No consideration of the impact of the A27 plans leading to increased
congestion.
8. light pollution
9. Destruction of protected species
10. noise and pollution.

Full text:

I am writing to object to the proposal to build 250houses at Highgrove Farm
Bosham on the following grounds:

1. Increased traffic on local roads which are inadequate for the increase in
traffic.
2. Sewage overload
3. Increase risk of local flooding.
4. Closing of the wildlife corridor between East Ashling, Broadbridge and
Chichester Harbour which is contrary to CDC's policy of preserving such
corridors and which recent surveys have shown that species are using this
corridor.
5. Destruction of historic landscape and views between the South Downs
National Park and Chichester Harbour AONB.
6. No evidence of the need for a two form entry school on the north edge,
bringing in pupils thereby resulting in unnecessary increase in congestion.
7. No consideration of the impact of the A27 plans leading to increased
congestion.
8. Increased light pollution on the edge of the South Downs designated dark
skies area.
9. Destruction of protected species, stag beetles, which are found on the
site.
10. Increased noise and pollution.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1473

Received: 06/02/2019

Respondent: Karen Ongley-Snook

Representation Summary:

Object to allocation:-
- loss of strategic gap
- sewage capacity
- floodrisk
- loss of wildlife corridor
- loss of historic landscape/views
- no need for school in Broadbridge
- no consideration of other sites

Full text:

I would like to register my concern and objections to the proposed 300 houses and development at Highgrove Bosham.
The Strategic Gap is being eroded towards ribbon development and urban sprawl.
The existing sewerage system is near to breaking point already so this would put the system in an even more precarious position.
Due to the added development, there will be an increased risk of flooding due to high water table and poor drainage.
Closing the wildlife corridor between east ashling , broad bridge and Chichester harbour, which is contrary to CDC's own policy of preserving such corridors.
There will be a further distraction of the historic scenic landscape and views between the South Downs national park and Chichester harbour AONB.

There is no evidence of the need or desire for a two form entry school on the north edge. Bringing in students from many directions, creating increase of car movements and the closure of a poplar and successful school.

There seems to have been no consideration of other sites closer to the village centre, or sites north of Chichester.
The roads plan to favour the through traffic along the A27 and reintroduces. Plans for a southern link road and road plans that have already been rejected in the A27 consultations( options 2&3) This would cause an increase of traffic on the A259, more congestion around the Tesco's roundabout which is already a very dangerous one and increased air pollution.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1476

Received: 06/02/2019

Respondent: Mrs Lynne Broughton

Representation Summary:

Object to allocation:
- traffic
- sewage
- flooding
- loss of wildlife corridor
- destruction of landscape/views
- no need for school in Broadbridge
- pollution
- loss of protected species
- impact on A27

Full text:

I am objecting to the planned development at Highgrove Farm Bosham. My objections are:

1. Increased traffic on local roads which are inadequate for the increase in traffic.
2. Sewage overload
3. Increase risk of local flooding.
4. Closing of the wildlife corridor between East Ashling, Broadbridge and Chichester Harbour which is contrary to CDC's policy of preserving such corridors and which recent surveys have shown that species are using this corridor.
5. Destruction of historic landscape and views between the South Downs National Park and Chichester Harbour AONB.
6. No evidence of the need for a two form entry school on the north edge, bringing in pupils thereby resulting in unnecessary increase in congestion.
7. No consideration of the impact of the A27 plans leading to increased congestion.
8. Increased light pollution on the edge of the South Downs designated dark skies area.
9. Destruction of protected species, stag beetles, which are found on the site.
10. Increased noise and pollution.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1485

Received: 04/02/2019

Respondent: Mr & Mrs James and Sandra Fearn

Number of people: 2

Representation Summary:

Object to allocation:
- flooding
- traffic
- loss of school would be terrible
- loss of wildlife
- loss of views of Bosham historic village

Full text:

These are our objections . My husband and myself have lived in Bosham for over 40 years have raised our 3 sons and very much enjoyed and sill enjoy our lovely village.

We have lived and seen flooding at Bosham more houses will make it much much worse. The road that runs through Bosham has always been busy the motorway was built which made life easier load of houses built would put the road dangerous and back where we started causing all sorts of problems. Closing the school would be terrible it's part of the heart of Bosham and a very popular and successful school. Then there's the wildlife to consider and the view of Bosham historic village. We strongly object to this project please could you forward this objection.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1528

Received: 07/02/2019

Respondent: Natural England

Representation Summary:

Natural England is concerned that this allocation scored poorly in the Sustainability Appraisal (SA), particularly in relation to waste water treatment, landscape and BMV land.

The SA states that Bosham WwTW does not have the capacity to take effluent from the site. Please see Natural England's comments under S31 and regarding the HRA. Clause 9 should be amended to include water quality as well as recreational impacts.

A LVIA should inform the site allocation as to whether views from the NP or AONB will be affected, and whether mitigation is possible without harming the open character of the site.

Full text:

Natural England is concerned that this allocation scored poorly in the Sustainability Appraisal (SA), particularly in relation to waste water treatment, landscape and BMV land.

The SA states that Bosham WwTW does not have the capacity to take effluent from the site. Please see Natural England's comments under S31 and regarding the HRA. Clause 9 should be amended to include water quality as well as recreational impacts.

A LVIA should inform the site allocation as to whether views from the NP or AONB will be affected, and whether mitigation is possible without harming the open character of the site.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1647

Received: 07/02/2019

Respondent: Heaver Homes Ltd

Agent: King & Co c/o ATP

Representation Summary:

We agree that there is a requirement for development in Bosham to allow the settlement to perform strongly as a Service Village. The scale of development to secure that step-change in performance and infrastructure (i.e. highway improvements, school and other facilities) to mitigate harm and deliver tangible improvements.

Our view is that the Highgrove Farm allocation land will be unable to deliver that critical mass. We suggest that the Council should reconsider and look at land north of the train line for a genuinely strategic opportunity to meet longer term growth requirements and contribution to OAN over the Plan period.

Full text:

We agree that there is a requirement for development in Bosham to allow the settlement to perform strongly as a Service Village. The scale of development to secure that step-change in performance and infrastructure (i.e. highway improvements, school and other facilities) to mitigate harm and deliver tangible improvements.

Our view is that the Highgrove Farm allocation land will be unable to deliver that critical mass. We suggest that the Council should reconsider and look at land north of the train line for a genuinely strategic opportunity to meet longer term growth requirements and contribution to OAN over the Plan period.

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1690

Received: 07/02/2019

Respondent: Mr Thomas Procter

Representation Summary:

Bosham allocation should be split between French Gardens and High Grove and/or Bosham could take up to an additional 150 houses directly adjacent to the Railway station giving more sustainable access to local key employment zones. Two files are included one for 25 houses and one outlining the entire 6ha French Gardens Site.

Full text:

1. Bosham could take significantly more housing than 250 based on its transport links and range of amenities compared to Hambrook, Chidham and various other Parishes. The Manhood Peninsula is also not a good place to put more houses without building a tramline or new railway branch line. The French Gardens site could take up to 150 houses to alleviate the constraints on the High Grove site and other parishes.
2. The proposed allocation should be split between High Grove and the French Gardens to minimise the impact of the High Grove site. The French Gardens was rated higher by residents, is lower grade agricultural soil, had an equal sustainability assessment to High Grove and was rejected on subjective grounds which are not backed up sociologically. A small number would have virtually no impact but it is also suitable for up to 150 houses.
3. I am hereby resubmitting the entire 6 HA French Gardens site for development if it is required and would like to commit to 100% Zero Carbon Homes in collaboration with ZEDFactory. As part of the site is Previously developed this would sit well with existing policies concerning sustainability, pollution, the environment, rural development, transport links and so on..


Site AL7 : I object to the sole inclusion of High Grove Farm for the proposed allocation of 250 additional houses in Bosham Parish.
The Bosham Neighbourhood Plan clearly states that residents would prefer housing to be sited over a number of sites and to avoid development if at all possible to the East or West. CDC's own sustainability assessment on the sites in Bosham demonstrated that the French Gardens site could take some of the housing allocated to the parish. As the site is in direct view of the SDNP and AONB the density should be kept to a minimum especially given the needs for balancing ponds, a school, allotments, play areas and so on. Therefore the housing should be split between High Grove and French Gardens Site which would help alleviate many of the constraints that are currently identified at High Grove site such as flooding, setting, density, traffic and so on. The French Gardens site was the site most favoured by residents outside of the AONB during the Neighbourhood Plan site allocation consultation (and that was for 150 houses).
I would also like to add that the whole French Gardens site is still available as defined in the 2016 SHLAA despite it not being included in the recent HELAA in its entirety if more housing was required or if the Policy direction changed in Favour of more EW corridor housing.
The French Gardens site is the only site adjacent to a railway station in the District and therefore has the lowest transport impact. It is therefore supported by Policy 1 in favour of sustainability. The fact that the owners would like to build Zero Carbon housing has not been included in the sustainability assessment. A small allocation would be well screened by existing vegetation and it also has existing access and a footpath to the village.

Attachments:

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1728

Received: 07/02/2019

Respondent: Mrs Zoe Neal

Representation Summary:

I object to AL7 in line with the comments from

Chichester Harbour AONB
Chichester Harbour Trust
CPRE
Bosham Parish Council
Bosham Residents Association

Full text:

I object to AL7 in line with the comments from

Chichester Harbour AONB
Chichester Harbour Trust
CPRE
Bosham Parish Council
Bosham Residents Association

Object

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1750

Received: 07/02/2019

Respondent: Mrs Claire Stratton

Representation Summary:

Makes provision or mention of the A259 access but no mention of where this extra traffic will enter the A27 which will either be Fishbourne roundabout or Havant. This impact the Fishbourne roundabout. My proposal for a separate junction must be considered along the A27. Unless this is adequately addressed in future iterations of the plan I will wish to raise this with the examiner at the appropriate juncture.

Full text:

Makes provision or mention of the A259 access but no mention of where this extra traffic will enter the A27 which will either be Fishbourne roundabout or Havant. This impact the Fishbourne roundabout. My proposal for a separate junction must be considered along the A27. Unless this is adequately addressed in future iterations of the plan I will wish to raise this with the examiner at the appropriate juncture.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 1796

Received: 07/02/2019

Respondent: Harbour Villages Lib Dems Campaign Team

Representation Summary:

6.50 to 6.56 Policy AL7

This is a sensitive site close to the harbour and exposed. Any development must be supported by planting and screening.

If this site is developed we support the relocating of the school with sufficient parking.

Any development must include cycle routes and recreational space. We also recommend a new cricket pitch.

Out of choice we would not develop this site.

Full text:

6.50 to 6.56 Policy AL7

This is a sensitive site close to the harbour and exposed. Any development must be supported by planting and screening.

If this site is developed we support the relocating of the school with sufficient parking.

Any development must include cycle routes and recreational space. We also recommend a new cricket pitch.

Out of choice we would not develop this site.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2087

Received: 15/02/2019

Respondent: West Sussex County Council

Representation Summary:

Minerals and waste:
Remove reference to minerals safeguarding as the site is not within the safeguarding or consultation area.

Full text:

West Sussex County Council Officer Level Response
Introduction
The Chichester Local Plan Review Preferred Approach sets out how the future development in the District will be shaped, excluding the area within the South Downs National Park, up to 2035. It includes the overall development strategy as well as relevant strategic policies to meet the future needs of the area and development management policies to help guide development over the plan period. The Local Plan helps to:
* choose where the development goes;
* protect the character and beauty of the area;
* provide job and housing opportunities so that children can continue to work and live locally;
* support and help to boost the local economy;
* help residents to maintain healthy and active lifestyles; and,
* make sure that there is adequate services, travel options and community facilities.

The Chichester Local Plan was adopted in July 2015. At that time, the Local Plan was approved, but the Government Inspector said that it had to be reviewed again within five years, to make sure that sufficient housing was planned to meet the needs of the area.

The first part of the review process was carried out in June 2017 with an Issues and Options consultation, in which comments were invited regarding the overall development strategy and possible development locations. The Local Plan Review: Preferred Approach is the second stage of the process. It sets out the proposed development strategy and policies for the area to meet future needs.


West Sussex County Council Officer Level Comments
This note sets out West Sussex County Council's (WSCC) officer response to the consultation on the draft Chichester Local Plan Review Preferred Approach. It highlights key issues and suggested changes to which Chichester District Council (CDC) is requested to give consideration. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding WSCC service requirements in order to mitigate planned development.


Minerals and Waste
A steady and adequate supply of minerals and the achievement of sustainable waste management can help to achieve a District or Borough Council's goals in relation to the economy, housing, transport, communications, strategic infrastructure and the environment. Therefore, District and Borough Local Plans should recognise the importance of minerals and waste issues as relevant to the scope of their overall strategies.

We welcome the reference to the adopted Minerals and Waste Local Plans and safeguarding in the document and the requirements in policies where a site is located within a minerals safeguarding area, or near to a safeguarded waste site. There are some missing references to safeguarding of minerals and waste sites for some of the proposed allocations, set out below and request that these references are added. It is also requested that 'Joint' is added into the references for the Joint Minerals Local Plan through the document.

Policy W23 of the Waste Local Plan applies to all Districts & Boroughs, regarding waste management within development and should be referenced in the Chichester Local Plan Review.

AL3 East of Chichester
The site is to the north of the Fuel Depot site allocation in the Waste Local Plan (Policy W10) for a built waste facility as part of a comprehensive redevelopment of the site (including complimentary non-waste uses). The East of Chichester allocation is the land to the north, bisected by the railway line, of the Fuel Depot. Reference should be made to giving consideration to the allocation, and therefore its safeguarding.

AL4 Westhampnett/North East Chichester
Reference should be made to minerals safeguarding, for consistency with other allocations, as within the sharp sand and gravel safeguarding area.

AL5 Southern Gateway
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 200m of the Chichester Railhead.

AL6 South-West of Chichester
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 300m of the Chichester Railhead.

AL7 Highgrove Farm Bosham
Remove reference to minerals safeguarding as the site is not within the safeguarding or consultation area.

AL12 Park Farm Selsey
Reference should be made to minerals safeguarding as site is within the sharp sand and gravel safeguarding area.

Neighbourhood plan allocations
Sites are yet to be allocated though neighbourhood plans. It is considered that the Joint Minerals Local Plan and Waste Local Plan are referenced, particularly with regards to safeguarding policies (M9, M10 and W2) and these documents and policies are given detailed consideration when allocating sites. Development at, adjacent or proximal to existing waste or mineral sites / infrastructure should be the subject to consultation with WSCC.


Connectivity and Sustainable Travel
The County council has worked with the District Council on the preparation of the transport evidence base study undertaken by Peter Brett Associates for the District Council. The recommended transport mitigation strategy, as assessed using the Chichester Area Transport Model has been demonstrated to be capable in principle to prevent the development from resulting in severe residual cumulative impacts on the highways and transport network. However, the recommended strategy has several risks to deliverability and acceptability associated with it, which require further work to be undertaken to demonstrate that the strategy can be implemented in its current form to provide the forecasted mitigation to travel conditions.

There are three locations where new highway alignments are proposed outside of existing highways boundaries. Two of these may include significant earthworks or structures to be delivered, being Stockbridge Link Road and Terminus Road diversion. The cost of the mitigation strategy exceeds a figure which could reasonably be supported by the value of the proposed development developer contributions alone, therefore the delivery of the strategy will depend upon securing of external grant funding to top up developer contributions. WSCC will work with the District Council in supporting and or applying for funding, the District Council needing to secure Highways England to support funding applications for A27 improvements. The proposed junction designs for the A27 Stockbridge and Whyke roundabouts include bans to well used right turn movements off the Chichester A27 bypass which result in significant forecast changes to traffic flows on local roads in the south of Chichester and on the Manhood Peninsular.

There is a need to ensure the land outside the highway boundary is available and the plan should set out how this land will be acquired to deliver the measures, it may be that a commitment to use, if required, and therefore reference to CPO be made in the policy.

Funding for the mitigation strategy is uncertain. It is considered that the Plan should set out how it will deal with this uncertainty. This could include trigger points in the monitoring framework to trigger a change of approach or alternative options to deliver the required development.

These factors mean that feasibility work is necessary to be undertaken prior to Plan submission, to reduce as far as practicable risks to costs, land take, impacts and deliverability of the proposed transport strategy in order to show that the strategy can be implemented within the plan period and that the funding strategy will be sufficient to meet the design requirements. In particular the following will need to be addressed:

* Statutory undertakers equipment under the roads junctions to be impacted.
* Extent of earthworks required to create a vertical and horizontal alignment compliant with design standards. Design audit to identify any required departures from standard.
* Designing for drainage and flooding issues, including compliance with the WSCC LLFA Policy for the Management of Surface Water, November 2018.
* Designs for structures to cross watercourses - Stockbridge Link Road
* Design should include suitable provision for rights of way and footway crossings
* Scoping for whether and at what level further Environmental Impact Assessment will be required.
* Stage 1 Road safety Audit, designers response report and resulting amendments to designs.
* Land take required after feasibility level designs have been developed and availability of required land.
* Wophams Lane - impacts of forecast changes to flow patterns to take B2201 southbound traffic on requirements for highway width, alignment, footway provision and junctions with A286 Birdham Road and B2201 Selsey Road; design solution required.
* Quarry Lane, Kingsham Avenue /Road, Terminus Road; impacts of forecast flow changes on highway users, residential and commercial frontagers and measures to manage through traffic whilst maintaining local access

Sustainable transport measures will also be required to mitigate planned development. These will be identified through more detailed assessments of sites including pre-application consideration. Funding will need to be identified through development and other sources as well in some cases.

Public Rights of Way
There is support for the Local Plan Review's approach to Public Rights Of Way (PROW), not just for the potential to impact on existing public off-road access but also the opportunity it brings to enhance this access for the benefit of future residents, communities and visitors. PROW deliver benefits for personal health and wellbeing; sustainable transport; reduction of air pollution and road congestion; are able to support local economies; and they connect communities.
WSCC PROW welcomes several aspects of the Vision statement, which give support to the protection and enhancement of the PROW network, and provision of safe and convenient off-road access opportunities for residents and visitors:

* Pursue a healthy lifestyle and benefit from a sense of well-being supported by good access to education, health, leisure, open space and nature, sports and other essential facilities;
* Live in sustainable neighbourhoods supported by necessary infrastructure and facilities;
* Move around safely and conveniently with opportunities to choose alternatives to car travel.

The Local Plan Strategic Objectives offer further support to enhance off-road access, particularly to 'Encourage healthy and active lifestyles for all, developing accessible health and leisure facilities and linked green spaces'. However, the objective to 'Achieve a sustainable and integrated transport system through improved cycling networks and links to public transport' should recognise walking also as an important mode for many people; some strategic enhancements will significantly improve walkers' safety and convenience.

It is considered that West of Chichester the A259 could act as a corridor for increased volumes of non-motorised access, particularly cycling. Improvement of the existing on-road facility and development of a various 'feeder' routes to connect with the many settlements, perhaps using quiet lanes in places, would encourage cycling particularly to be a natural alternative to vehicle use. Policy S18: Integrated Coastal Zone Management for the Manhood Peninsula, gives regard to such an ambition in stating it will 'Improve infrastructure to support sustainable modes of transport, especially cycle ways, bridleways and footpaths, including the National Coastal Footpath'.

The National Planning Policy Framework (NPPF) Open Space and Recreation, para 97b) states:
the loss resulting from the proposed development would be replaced by equivalent or better provision in terms of quantity and quality in a suitable location.
The NPPF para 98 also states:
Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks including National Trails.'
There is support for Policy S20: Design, that recognises these requirements in stating development 'is well connected to provide safe and convenient ease of movement by all users, prioritising pedestrian and cycle movements both within the scheme and neighbouring areas and ensuring that the needs of vehicular traffic does not dominate at the expense of other modes of transport, or undermine the resulting quality of places' and 'incorporates and/or links to high quality Green Infrastructure and landscaping to enhance biodiversity and meet recreational needs, including public rights of way'.


Education
As the local education authority, WSCC has the statutory duty to ensure that there is a sufficient supply of suitable school places to meet statutory requirements for early years, primary, secondary and sixth form provision (including up to age 25 for those with special educational needs and/or disabilities). Education infrastructure, or contributions to provide infrastructure, will be required in order to mitigate proposed development. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding education and other service requirements in order to mitigate planned development.

The table below sets out the primary, secondary school and sixth form requirements to mitigate proposed development. SEE ATTACHMENT FOR TABLE

AL1 Land West of Chichester

It should be noted that phase one of this development will provide the primary school with the core of the building being built to the specification for a 2 form entry (FE) school and 1FE teaching accommodation. Phase 2 as per 6.10 on page 93 should include expansion of the primary school for the further 1FE of teaching accommodation.

AL2 Land at Shopwhyke (Oving Parish)

No update to original response for this allocation is required.

AL3 Land East of Chichester - previously South of Shopwhyke

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 1 FE expandable to 2FE and pro rata share of the build costs would be required.

If numbers were to increase on the east side of the city, education provision will need to be reviewed, potentially a further 1FE may be required including land provision, this could be in the form of an expansion or a new school being built capable of expansion to 3FE.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL4 Land at Westhampnett / North East Chichester

The remaining 200 dwellings will impact on the education provision in the area, financial contributions towards expansion of existing or pro rata costs towards the expansion of the school within AL3.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL5 Southern Gateway

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from the strategic allocation of 350 dwellings in the Southern Gateway. However, consideration should be given to the cumulative impact of housing in the area Land South West of Chichester (AL6) to allocate land within the area for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL6 Land South West of Chichester (Apuldram & Donnington Parishes)

It should be noted that the primary education provision in this area is either in Chichester City Centre which means crossing the main A27 or by travelling south towards the peninsula. Consideration should be given to the cumulative impact of further housing in the area along with the Southern Gateway allocation (AL5) to allocate land within the strategic allocation site for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL7 Bosham

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. The strategic allocation of 250 dwellings in isolation does not require a new school to be built. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL9 Fishbourne

The primary school serving the area is currently at capacity, expansion of the school may be possible, feasibility / options appraisals would need to be undertaken.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of primary and secondary schools and sixth form if feasible and required.

AL8 East Wittering

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development.

Contributions would be required for expansion of primary and secondary schools if feasible and required.

AL10 Chidham and Hambrook area

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL11 Hunston

Any development within this area cannot currently be accommodated in the existing primary school at North Mundham. Further capacity would be required to accommodate the development, CDC will need to work with WSCC to determine how additional capacity in the area could be accommodated if land is to be allocated.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

AL12 Selsey

Further capacity would be required to accommodate the development. Contributions (and possibly land if required) would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

AL13 Southbourne

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 2form entry expandable to 3FE primary school and pro rata share of the build costs would be required.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL14 Tangmere

The current allocation of 1,300 dwellings will bring forward the requirement for land for a 1FE expandable to 2FE and financial contributions would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

Footnote: - if all of the proposed sites were to come forward the secondary school and sixth form provision would be full in the Chichester Planning Area. Expansion of the secondary schools in the Chichester Planning Area to cater for the increased demand would need to be sought from the academy sponsors, where appropriate and the Local Authority.


Lead Local Flood Authority
The Lead Local Flood Authority (LLFA) is concerned about the approach being taken with regard to ensuring potential wastewater treatment for proposed new sustainable development.

Paragraph 8 of the NPPF states:
8. Achieving sustainable development means that the planning system has three overarching objectives, which are interdependent and need to be pursued in mutually supportive ways (so that opportunities can be taken to secure net gains across each of the different objectives):

a) An economic objective - to help build a strong, responsive and competitive
economy, by ensuring that sufficient land of the right types is available in the
right places and at the right time to support growth, innovation and improved
productivity; and by identifying and coordinating the provision of infrastructure;

Paragraph 20 of the NPPF states:
20. Strategic policies should set out an overall strategy for the pattern, scale and quality of development, and make sufficient provision for:
a) housing (including affordable housing), employment, retail, leisure and other commercial development;
b) infrastructure for transport, telecommunications, security, waste management, water supply, wastewater, flood risk and coastal change management, and the provision of minerals and energy (including heat);

In the LLFAs view, the Local Plan Review is not setting out an overall strategy for the pattern, scale and quality of development in relation to arrangements for wastewater management. The LLFA considers that CDC needs to go further in incorporating within the Local Plan Review how this provision is being made.


Additional Policy Comments

Policy S12: Infrastructure Provision
Support the requirement that all development must provide or fund new infrastructure, facilities and services required, both on and off-site (including full fibre communications infrastructure) as a consequence of the proposal. The explicit reference to full fibre communications infrastructure is supported as this will provide gigabit-capable and future-proofed services to all development, existing and new. The reference to provision of facilities and services on and off-site is also supported as in the case of broadband for example, all development will be adequately equipped with the necessary infrastructure installed for the purposes of connecting to full fibre gigabit-capable broadband services. This policy supports the County Council's aim for increased digital infrastructure that will provide for gigabit-capable broadband and future technologies such as 5G.

Support the reference to safeguarding educational facilities under section 3 of the policy.

The policy includes the requirement to 'Facilitate accessibility to facilities and services by a range of transport modes'. PROW can offer vital access means for walkers and cyclists, such as for employment land use (e.g. commuting by bicycle) and in support of the high street, both for employees and customers. IT is considered that this Policy, also Policy S13: Chichester City Development Principles, should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.

The supporting text, paragraph 4.81 makes reference to the Strategic Infrastructure Package (SIP). It is requested that this wording is removed and replaced with West Sussex County Council identifies service infrastructure requirements necessary to support new and existing communities, where strategic development and growth is proposed in Local Plans. These are required to deliver the County Council's statutory responsibilities, strategic objectives and current policy and feed into the preparation of the Infrastructure Delivery Plan.


Policy S13: Chichester City Development Principles
This policy, like policy S12, it is considered should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.


Policy S23: Transport and Accessibility
The policy and supporting text paragraphs 5.15 - 5.33 refer to Transport Infrastructure. Understandably much consideration is given to the A27 around Chichester; however, in addition to seeking new infrastructure from new development, it is recommended support in principle is given to maximising the value of existing infrastructure so as to facilitate off-road user modes accessing either side of the A27.


S24: Countryside
Supporting text paragraphs 5.34 - 5.43, acknowledges 'it is necessary to provide for the social and economic needs of small rural communities, and enable those who manage, live and work in the countryside to continue to do so'. It is recognised in para 7.205, supporting text to policy SM35 Equestrian Development, the high numbers of liveried and stabled horses. A considerable network of businesses are supported by such a high equine population, and in addition to financial value within the local community there is considerable benefit in terms of health and wellbeing of individuals. It is suggested that Policy S24: Countryside, could recognise this specifically.


S27: Flood Risk Management
Supporting text paragraph 5.54, requested amendments underlined - as a consequence of the rise in sea levels and storm surges, parts of the plan area will be at increased risk from coastal erosion, groundwater, fluvial and/or tidal flooding. Hard defences may not be possible to maintain in the long term, therefore development needs to be strongly restricted in areas at risk to flooding and erosion, whilst ensuring that existing towns and villages are protected by sustainable means that make space for water in suitable areas. Development must take account of the policies of the relevant shoreline management plan

Supporting text paragraph 5.58, requested amendments underlined - Built development can lead to increased surface water run-off; therefore new
development is encouraged to incorporate mitigation techniques in its design, such as permeable surfaces and Sustainable Drainage Systems (SuDS). Where appropriate, SuDS should be used as part of the linked green infrastructure network to provide multiple functions and benefits to landscape quality, recreation and biodiversity. This can be achieved through habitat creation, new open spaces and good design. SuDS should be designed to help cope with intense rainfall events and to overcome any deterioration in water quality status. In determining the suitability of SuDS for individual development sites, developers should refer to guidance published by the Lead Local Flood Authority (LLFA): West Sussex LLFA Policy for the Management of Surface Water: https://www.westsussex.gov.uk/media/12230/ws_llfa_policy_for_management_of_surface_water.pdf and, if necessary, seek further advice from the Lead Local Flood Authority LLFA.

S27 policy text requested amendments underlined for section 1 - a. through a sequential approach, taking into consideration all forms of flooding, it is located in the lowest appropriate flood risk location in accordance with the NPPF and the Chichester Strategic Flood Risk Assessment (SFRA); and

S27 policy text requested amendments underlined for section 2. Sustainable drainage systems (SuDS) will be required on major developments (10 or more dwellings or equivalent) and encouraged for smaller schemes. SUDS should be designed into the landscape of all new development and should be included as part of a District wide approach to improve water quality and provide flood mitigation. A site-specific Flood Risk Assessment will be required for sites within or adjacent to areas at risk of surface water flooding as identified in the SFRA. There should be no increase in either the volume or rate of surface water runoff leaving the site.

S27 policy text requested additional bullet point as number 4 - Clear management arrangements and funding for their ongoing maintenance over the lifetime of the development should be proposed. Planning conditions and / or obligations will be used to secure these arrangements.

S27 policy text requested amendments underlined for section 2, but would be section 5 - Development should not result in any property or highway, on or off site, being at greater risk of flooding than the 1 in 100 year storm return period, including an allowance for climate change.


Policy S29: Green Infrastructure
The Green Infrastructure policy is welcomed, including provision of new Green Infrastructure as an integral part of the development at Strategic Development Locations. It is recommended that measures are put in place to secure the long term management of such Green Infrastructure.


Policy S30: Strategic Wildlife Corridors
The identification of Strategic Wildlife Corridors and inclusion of a policy to safeguard them from development is welcomed. It is recommended that CDC promotes positive conservation management within these corridors to maximise their contribution to maintaining and enhancing biodiversity. As stated in Section 5.66, 'These corridors do not stop at the plan area boundaries.' Thus, it is recommended that CDC works in partnership with Chichester Harbour Conservancy and The South Downs National Park Authority to ensure that these Strategic Wildlife Corridors continue to provide effective corridors and connectivity across the wider landscape.

Section 5.66 refers to four Strategic Wildlife Corridors connecting Chichester Harbour with the South Downs National Park but it is noted that there is no mention of the Strategic Wildlife Corridors to the east of Chichester which connect Pagham Harbour with the South Downs National Park (as seen in Policy Map S30b). It is also noted that the maps referred to in Section 5.66, Maps 5.1 & 5.2 are missing.

WSCC and CDC promoted a Mitigated Northern Route for the A27 at Chichester as the preferred option, subject to the inclusion of important mitigation measures that are needed to make the scheme acceptable in environmental terms and the 'full southern route' as a reasonable alternative. Both routes could impact on the identified Strategic Wildlife Corridors. As currently drafted, Policy S30 would seem to prevent a mitigated northern route from coming forward in the future. Therefore, the District Council should consider whether the policy is overly restrictive (for example should it refer to 'significant adverse impacts' or 'unacceptable adverse impacts'?) and how it would be applied if a northern route for A27 were to come forward in the future.


Policy S31: Wastewater Management and Water Quality
S27 policy text requested amendments underlined for section 3, this - Where appropriate, development should contribute to the delivery of identified actions to deliver infiltration reduction across the catchment. Where appropriate development should contribute to the delivery of identified actions to deliver a reduction in the level of infiltration of groundwater into the sewer system.


Policy AL1: Land West of Chichester
AL1 policy text requested additional bullet point as number 8 - Increase capacity to attenuate surface water on site, thereby reducing the discharge flows off the site below current rates and reducing the risk of flooding to residential areas downstream.

AL1 policy text requested additional bullet point under 15 as 15 b- Provide mitigation for any loss of watercourse habitat resulting from culverting for highway provision in the development;

AL1 policy text in supporting 'improved cycle and pedestrian routes linking the site with the city, Fishbourne and the South Downs National Park', a new key link for cycling will be to Salthill Road, thereby enabling cyclists to benefit from the existing bridge crossing of the A27 for journeys to and from the west.


AL2: Land at Shopwyke (Oving Parish)
The policy acknowledges need 'for foot/cycle bridge across A27 to Coach Road'. There is also need for equestrian users to cross the A27 and WSCC PROW has received several enquiries seeking support for such infrastructure. Consideration could be given to the proposed bridge providing for all three modes.


AL3: East of Chichester (Oving Parish)
AL3 supporting text requested amendments underlined for paragraph 6.22 - The site is identified for 600 dwellings, however, there may be potential to deliver a large strategic development of 1000 dwellings, subject to further evidence, including the testing of additional growth on the local highway network and capacity of the site to provide flood risk attenuation for the increased housing density. The site should be master planned as a whole, and delivered through a phased development over a ten year period. Although the site is physically separated from the city by the A27 Chichester Bypass, the development should form a planned extension to the city, forming a new neighbourhood. This will involve opportunities to provide new facilities to serve the wider local community with good off-site access, particularly by walking and cycling to existing local facilities and facilities in the city.

AL3 policy requires exploring integrated green infrastructure with other strategic sites to the north east of the city, Tangmere and the wider countryside. It is considered that future residents will have expectations for provision of safe and convenient links towards Oving and also across the railway to link to the A259 cycle path and PROW south of the A259. It is considered that the policy should be strengthened to ensure such provision.


Policy AL4: Land at Westhampnett/North East Chichester
AL4 policy text requested amendments underlined for section 3 - Open space and green infrastructure, including a linear greenspace with public access along the Lavant Valley.

Taking into account the site-specific requirements, proposals for the site should satisfy the following requirements:

Policy AL4 policy, it is welcomed that 'provision should be made for green links to the South Downs National Park and Chichester City.' Safe and convenient walking and cycling to Lavant, from where people will access the South Downs, will provide for sustainable transport use.


Policy AL5 Southern Gateway
AL5 supporting text requested amendments underlined for paragraph 6.38 - The area has been identified as suitable for comprehensive regeneration with the aim being to make it a more attractive and welcoming gateway for the city, providing new housing, business and retail space and leisure and tourism facilities. Opportunities will be identified to improve transport links with a focus on cycling, walking and public transport and the removal of non-essential traffic from the area. There is also scope for significant public space enhancements and new landscaping incorporating blue / green infrastructure delivering multi-functional benefits.

AL5 policy text requested amendments underlined for section 5 - Provision of open space that:
* Is in accordance with Policy DM34, including retention of the existing playing pitch unless suitable re-provision is provided;
* Reinforces / enhances green and blue infrastructure consistent with Policy S29 and fully exploits the opportunities for sustainable drainage.


AL5 policy text requested amendments underlined for section 8 - Provision of both a surface and waste water management plan which demonstrates no net increase in flow to Apuldram Waste Water Treatment Works would result from this development, unless suitable alternative provision is agreed;


Policy AL6: Land South-West of Chichester (Apuldram and Donnington Parishes)
The LLFA has concerns regarding the lack of reference to flood risk constraints of the site in Policy AL6. There is reference to flood risk in paragraph 6.47. However, the policy itself makes no reference to these constraints.
The constraints arise from a combination of the following:

* Current tidal /fluvial flood risk extending from Chichester harbour to the west and up the River Lavant floodplain; (Map 1)
* Future tidal /fluvial flood risk associated with climate change; (Map 1)
* Constraints on infiltration of surface water run off because of high seasonal groundwater levels (<0.025m below the surface) (Map 2); and
* Constraints on gravity outfalls because of the low relief and long-term reduction in tidal window for discharge.

The above limits the options for how the site can be effectively drained without a step change from typically employed methods to embrace more innovative and currently expensive options e.g. blue roofs and rainwater harvesting.

The LLFA recommends that the policy sets out both the above constraints and the type of innovative drainage that will be required to achieve the development objectives for the site.



Key: Projected medium projection extent of SLR based upon 4m contour

AL6 extent

Current Flood Zone 3 extent.

Current Areas of high (1:30) surface water flood risk

Map 1 Existing and projected Tidal and surface water flood risk for AL6.

Consistent with paragraph 3.2 of the SFRA, given the high risk of flooding both now and into the future for this site, it is recommended that CDC gives consideration to the climate change maps to understand how the flood zones are predicted to change over the lifetime of the development.


Key:
AL6 boundary.

Groundwater levels are either at very near (within 0.025m of) the ground surface.

Groundwater levels are between 0.025m and 0.5m below the ground surface

Map 2 Groundwater flood risk JBA

Policy AL6 WSCC PROW considers 'necessary highway improvements to adequately mitigate the likely impacts on the highway network' to include a bridge crossing of the A27 for convenient walking and cycling access to the Terminus Road industrial estate and the city. There is an existing public footpath but, as this crosses the A27 at-grade, this will not provide the safest facility and not encourage people to minimise use of vehicles for local access. Provision of a bridge and access through the site could also establish a valuable link to the popular Salterns Way walking and cycle path. An additional link to Salterns Way should also be provided off the A286 for the benefit of Stockbridge residents as a safer alternative to the A286.


AL 7 Highgrove Farm, Bosham
The LLFA notes that the above site has the potential for a moderate risk of groundwater flooding. It is likely that this is perched groundwater draining from higher ground / springs to the north that lies in the superficial mixed sediments underlain by Lambeth Clay.


Policy AL8: East Wittering Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'Opportunities ... for the expansion and provision of green infrastructure into the wider countryside including between settlements and facilities'. Existing and future residents and the local visitor economy would benefit by delivery of an off-road route for walkers, cyclists and horse riders to and from the Medmerry development and towards Selsey. It is considered that Policy AL8 should aim to deliver this enhancement specifically.


Policy AL9: Fishbourne Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

It is considered that off-road cycling links to land West of Chichester (off Salthill Road) and to Bosham (off Park Lane) would benefit this community with enhanced sustainable connectivity.


Policy AL10: Chidham and Hambrook Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'opportunities' to develop green infrastructure and links to other communities. An opportunity, in conjunction with Highways England, exists to maximise the value of existing infrastructure by creating a new bridleway (for walkers, cyclists and horse riders) on a path using an existing A27 overbridge.


Policy AL11: Hunston Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The village is already well connected for walkers to access the surrounding countryside but there are presently no local cycling or horse riding facilities on the PROW network. A bridleway link to South Mundham (with the potential for future cycle links to Pagham and towards Bognor Regis) and to Sidlesham via the golf course and Brimfast Lane would provide residents and visitors with improved access to the countryside and services.


Policy AL12: Land North of Park Farm, Selsey
It is unclear why the policy map shows the proposed strategic allocation lies outside of the Neighbourhood Plan proposed settlement boundary. Some explanation for this anomaly would be helpful in the text.


Groundwater flood risk as depicted by JBA mapping (Brown = seasonal groundwater level lies between 0.025 and 0.5m below the surface).

The principle concern that the LLFA wishes to highlight is the need to ensure that the necessary foul sewerage infrastructure to support development is in place. It is the LLFA understanding that the Siddlesham WWTW experiences capacity issues currently, in part exacerbated by groundwater infiltration. While Policy AL12 states: Development proposals will need to demonstrate that sufficient capacity will be available within the sewer network, including waste water treatment works, to accommodate the proposed development in accordance with Policy S31.

The policy proposes only to provide 'pedestrian links between the site and new development south of Park Lane'. It is considered that cycling links should also be provided.


Policy DM8: Transport, Accessibility and Parking
The PROW network can provide vital means for communities to interact and encourage sustainable local access. The policy requirement to create 'links between new development and existing pedestrian, cycle and public transport networks' is welcomed. However, establishing links into surrounding existing development should not be overlooked also - the greater the permeability, the greater the use.


Policy DM10: New Employment Sites
Whilst mentioned earlier in the Plan in respect of a number of specific sites, this policy should specifically aim to provide, as a matter of course, suitable walking and cycling infrastructure to encourage local sustainable access. This infrastructure may need to extend outside a site boundary so as to provide safe and convenient connection to existing infrastructure. This principle should apply also to Policy DM13: Built Tourist and Leisure Development and Policy DM14: Caravan and Camping Sites.


Policy DM32: Green Infrastructure
Whilst it is recognised the policy proposes support subject to not 'dissect[ing] ... the linear network of cycle ways, public rights of way, bridleways ...', the policy could lend support to establishing new routes as part of the Green Infrastructure network itself.


Policy DM35: Equestrian Development
It is appreciated why the Plan would wish to require future equine development to be 'well related to or has improved links to the existing bridleway network'. However, this will add to the pressure of use on the existing bridleway network, which is not extensive outside of the South Downs, so will increase degradation of paths. Future developments must, therefore, accept to contribute in some way, acceptable to the local highway authority, to mitigate the additional impact to be created so all lawful users are not disadvantaged.


Policy DM29: Biodiversity
The measures to safeguard and enhance the biodiversity value of development sites are welcomed, including seeking net biodiversity gain.


Schedule of proposed changes to the policies map
S30a West of City Corridors -suggest title should be West of City Strategic Wildlife Corridors (to match S30b: East of City Strategic Wildlife Corridors. The Strategic Wildlife Corridors are depicted in different colour patterns on the two plans which is somewhat confusing.


Strategic Wildlife Corridors Local Plan Review Background Paper
Proposed Hermitage to Westbourne Strategic Wildlife Corridor
A large area depicted as Biodiversity Opportunity Area (BOA) in Fig. 1 (immediately to the south of the Rivers Ems & Meadows Local Wildlife Site, Westbourne) is in fact housing and forms part of the settlement of Westbourne. You should consider if this land should be included as having potential for biodiversity enhancement.


Glossary
Includes Sites of Nature Conservation Importance (SNCIs) but not Local Wildlife Sites (LWSs). SNCIs are now known as LWSs.

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2130

Received: 15/02/2019

Respondent: West Sussex County Council

Representation Summary:

Education:
Primary provision is at capacity, expansion of the school on its existing site is not possible. It is proposed that land for a 2FE primary school be provided. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.
AL7, AL10 and AL13 are within the same school planning area, cumulative total brings forward requirement for c3 forms of entry additional places.
As currently drafted, LP indicates oversupply of school places which could affect viability of all schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required.

Full text:

West Sussex County Council Officer Level Response
Introduction
The Chichester Local Plan Review Preferred Approach sets out how the future development in the District will be shaped, excluding the area within the South Downs National Park, up to 2035. It includes the overall development strategy as well as relevant strategic policies to meet the future needs of the area and development management policies to help guide development over the plan period. The Local Plan helps to:
* choose where the development goes;
* protect the character and beauty of the area;
* provide job and housing opportunities so that children can continue to work and live locally;
* support and help to boost the local economy;
* help residents to maintain healthy and active lifestyles; and,
* make sure that there is adequate services, travel options and community facilities.

The Chichester Local Plan was adopted in July 2015. At that time, the Local Plan was approved, but the Government Inspector said that it had to be reviewed again within five years, to make sure that sufficient housing was planned to meet the needs of the area.

The first part of the review process was carried out in June 2017 with an Issues and Options consultation, in which comments were invited regarding the overall development strategy and possible development locations. The Local Plan Review: Preferred Approach is the second stage of the process. It sets out the proposed development strategy and policies for the area to meet future needs.


West Sussex County Council Officer Level Comments
This note sets out West Sussex County Council's (WSCC) officer response to the consultation on the draft Chichester Local Plan Review Preferred Approach. It highlights key issues and suggested changes to which Chichester District Council (CDC) is requested to give consideration. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding WSCC service requirements in order to mitigate planned development.


Minerals and Waste
A steady and adequate supply of minerals and the achievement of sustainable waste management can help to achieve a District or Borough Council's goals in relation to the economy, housing, transport, communications, strategic infrastructure and the environment. Therefore, District and Borough Local Plans should recognise the importance of minerals and waste issues as relevant to the scope of their overall strategies.

We welcome the reference to the adopted Minerals and Waste Local Plans and safeguarding in the document and the requirements in policies where a site is located within a minerals safeguarding area, or near to a safeguarded waste site. There are some missing references to safeguarding of minerals and waste sites for some of the proposed allocations, set out below and request that these references are added. It is also requested that 'Joint' is added into the references for the Joint Minerals Local Plan through the document.

Policy W23 of the Waste Local Plan applies to all Districts & Boroughs, regarding waste management within development and should be referenced in the Chichester Local Plan Review.

AL3 East of Chichester
The site is to the north of the Fuel Depot site allocation in the Waste Local Plan (Policy W10) for a built waste facility as part of a comprehensive redevelopment of the site (including complimentary non-waste uses). The East of Chichester allocation is the land to the north, bisected by the railway line, of the Fuel Depot. Reference should be made to giving consideration to the allocation, and therefore its safeguarding.

AL4 Westhampnett/North East Chichester
Reference should be made to minerals safeguarding, for consistency with other allocations, as within the sharp sand and gravel safeguarding area.

AL5 Southern Gateway
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 200m of the Chichester Railhead.

AL6 South-West of Chichester
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 300m of the Chichester Railhead.

AL7 Highgrove Farm Bosham
Remove reference to minerals safeguarding as the site is not within the safeguarding or consultation area.

AL12 Park Farm Selsey
Reference should be made to minerals safeguarding as site is within the sharp sand and gravel safeguarding area.

Neighbourhood plan allocations
Sites are yet to be allocated though neighbourhood plans. It is considered that the Joint Minerals Local Plan and Waste Local Plan are referenced, particularly with regards to safeguarding policies (M9, M10 and W2) and these documents and policies are given detailed consideration when allocating sites. Development at, adjacent or proximal to existing waste or mineral sites / infrastructure should be the subject to consultation with WSCC.


Connectivity and Sustainable Travel
The County council has worked with the District Council on the preparation of the transport evidence base study undertaken by Peter Brett Associates for the District Council. The recommended transport mitigation strategy, as assessed using the Chichester Area Transport Model has been demonstrated to be capable in principle to prevent the development from resulting in severe residual cumulative impacts on the highways and transport network. However, the recommended strategy has several risks to deliverability and acceptability associated with it, which require further work to be undertaken to demonstrate that the strategy can be implemented in its current form to provide the forecasted mitigation to travel conditions.

There are three locations where new highway alignments are proposed outside of existing highways boundaries. Two of these may include significant earthworks or structures to be delivered, being Stockbridge Link Road and Terminus Road diversion. The cost of the mitigation strategy exceeds a figure which could reasonably be supported by the value of the proposed development developer contributions alone, therefore the delivery of the strategy will depend upon securing of external grant funding to top up developer contributions. WSCC will work with the District Council in supporting and or applying for funding, the District Council needing to secure Highways England to support funding applications for A27 improvements. The proposed junction designs for the A27 Stockbridge and Whyke roundabouts include bans to well used right turn movements off the Chichester A27 bypass which result in significant forecast changes to traffic flows on local roads in the south of Chichester and on the Manhood Peninsular.

There is a need to ensure the land outside the highway boundary is available and the plan should set out how this land will be acquired to deliver the measures, it may be that a commitment to use, if required, and therefore reference to CPO be made in the policy.

Funding for the mitigation strategy is uncertain. It is considered that the Plan should set out how it will deal with this uncertainty. This could include trigger points in the monitoring framework to trigger a change of approach or alternative options to deliver the required development.

These factors mean that feasibility work is necessary to be undertaken prior to Plan submission, to reduce as far as practicable risks to costs, land take, impacts and deliverability of the proposed transport strategy in order to show that the strategy can be implemented within the plan period and that the funding strategy will be sufficient to meet the design requirements. In particular the following will need to be addressed:

* Statutory undertakers equipment under the roads junctions to be impacted.
* Extent of earthworks required to create a vertical and horizontal alignment compliant with design standards. Design audit to identify any required departures from standard.
* Designing for drainage and flooding issues, including compliance with the WSCC LLFA Policy for the Management of Surface Water, November 2018.
* Designs for structures to cross watercourses - Stockbridge Link Road
* Design should include suitable provision for rights of way and footway crossings
* Scoping for whether and at what level further Environmental Impact Assessment will be required.
* Stage 1 Road safety Audit, designers response report and resulting amendments to designs.
* Land take required after feasibility level designs have been developed and availability of required land.
* Wophams Lane - impacts of forecast changes to flow patterns to take B2201 southbound traffic on requirements for highway width, alignment, footway provision and junctions with A286 Birdham Road and B2201 Selsey Road; design solution required.
* Quarry Lane, Kingsham Avenue /Road, Terminus Road; impacts of forecast flow changes on highway users, residential and commercial frontagers and measures to manage through traffic whilst maintaining local access

Sustainable transport measures will also be required to mitigate planned development. These will be identified through more detailed assessments of sites including pre-application consideration. Funding will need to be identified through development and other sources as well in some cases.

Public Rights of Way
There is support for the Local Plan Review's approach to Public Rights Of Way (PROW), not just for the potential to impact on existing public off-road access but also the opportunity it brings to enhance this access for the benefit of future residents, communities and visitors. PROW deliver benefits for personal health and wellbeing; sustainable transport; reduction of air pollution and road congestion; are able to support local economies; and they connect communities.
WSCC PROW welcomes several aspects of the Vision statement, which give support to the protection and enhancement of the PROW network, and provision of safe and convenient off-road access opportunities for residents and visitors:

* Pursue a healthy lifestyle and benefit from a sense of well-being supported by good access to education, health, leisure, open space and nature, sports and other essential facilities;
* Live in sustainable neighbourhoods supported by necessary infrastructure and facilities;
* Move around safely and conveniently with opportunities to choose alternatives to car travel.

The Local Plan Strategic Objectives offer further support to enhance off-road access, particularly to 'Encourage healthy and active lifestyles for all, developing accessible health and leisure facilities and linked green spaces'. However, the objective to 'Achieve a sustainable and integrated transport system through improved cycling networks and links to public transport' should recognise walking also as an important mode for many people; some strategic enhancements will significantly improve walkers' safety and convenience.

It is considered that West of Chichester the A259 could act as a corridor for increased volumes of non-motorised access, particularly cycling. Improvement of the existing on-road facility and development of a various 'feeder' routes to connect with the many settlements, perhaps using quiet lanes in places, would encourage cycling particularly to be a natural alternative to vehicle use. Policy S18: Integrated Coastal Zone Management for the Manhood Peninsula, gives regard to such an ambition in stating it will 'Improve infrastructure to support sustainable modes of transport, especially cycle ways, bridleways and footpaths, including the National Coastal Footpath'.

The National Planning Policy Framework (NPPF) Open Space and Recreation, para 97b) states:
the loss resulting from the proposed development would be replaced by equivalent or better provision in terms of quantity and quality in a suitable location.
The NPPF para 98 also states:
Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks including National Trails.'
There is support for Policy S20: Design, that recognises these requirements in stating development 'is well connected to provide safe and convenient ease of movement by all users, prioritising pedestrian and cycle movements both within the scheme and neighbouring areas and ensuring that the needs of vehicular traffic does not dominate at the expense of other modes of transport, or undermine the resulting quality of places' and 'incorporates and/or links to high quality Green Infrastructure and landscaping to enhance biodiversity and meet recreational needs, including public rights of way'.


Education
As the local education authority, WSCC has the statutory duty to ensure that there is a sufficient supply of suitable school places to meet statutory requirements for early years, primary, secondary and sixth form provision (including up to age 25 for those with special educational needs and/or disabilities). Education infrastructure, or contributions to provide infrastructure, will be required in order to mitigate proposed development. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding education and other service requirements in order to mitigate planned development.

The table below sets out the primary, secondary school and sixth form requirements to mitigate proposed development. SEE ATTACHMENT FOR TABLE

AL1 Land West of Chichester

It should be noted that phase one of this development will provide the primary school with the core of the building being built to the specification for a 2 form entry (FE) school and 1FE teaching accommodation. Phase 2 as per 6.10 on page 93 should include expansion of the primary school for the further 1FE of teaching accommodation.

AL2 Land at Shopwhyke (Oving Parish)

No update to original response for this allocation is required.

AL3 Land East of Chichester - previously South of Shopwhyke

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 1 FE expandable to 2FE and pro rata share of the build costs would be required.

If numbers were to increase on the east side of the city, education provision will need to be reviewed, potentially a further 1FE may be required including land provision, this could be in the form of an expansion or a new school being built capable of expansion to 3FE.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL4 Land at Westhampnett / North East Chichester

The remaining 200 dwellings will impact on the education provision in the area, financial contributions towards expansion of existing or pro rata costs towards the expansion of the school within AL3.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL5 Southern Gateway

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from the strategic allocation of 350 dwellings in the Southern Gateway. However, consideration should be given to the cumulative impact of housing in the area Land South West of Chichester (AL6) to allocate land within the area for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL6 Land South West of Chichester (Apuldram & Donnington Parishes)

It should be noted that the primary education provision in this area is either in Chichester City Centre which means crossing the main A27 or by travelling south towards the peninsula. Consideration should be given to the cumulative impact of further housing in the area along with the Southern Gateway allocation (AL5) to allocate land within the strategic allocation site for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL7 Bosham

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. The strategic allocation of 250 dwellings in isolation does not require a new school to be built. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL9 Fishbourne

The primary school serving the area is currently at capacity, expansion of the school may be possible, feasibility / options appraisals would need to be undertaken.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of primary and secondary schools and sixth form if feasible and required.

AL8 East Wittering

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development.

Contributions would be required for expansion of primary and secondary schools if feasible and required.

AL10 Chidham and Hambrook area

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL11 Hunston

Any development within this area cannot currently be accommodated in the existing primary school at North Mundham. Further capacity would be required to accommodate the development, CDC will need to work with WSCC to determine how additional capacity in the area could be accommodated if land is to be allocated.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

AL12 Selsey

Further capacity would be required to accommodate the development. Contributions (and possibly land if required) would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

AL13 Southbourne

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 2form entry expandable to 3FE primary school and pro rata share of the build costs would be required.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL14 Tangmere

The current allocation of 1,300 dwellings will bring forward the requirement for land for a 1FE expandable to 2FE and financial contributions would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

Footnote: - if all of the proposed sites were to come forward the secondary school and sixth form provision would be full in the Chichester Planning Area. Expansion of the secondary schools in the Chichester Planning Area to cater for the increased demand would need to be sought from the academy sponsors, where appropriate and the Local Authority.


Lead Local Flood Authority
The Lead Local Flood Authority (LLFA) is concerned about the approach being taken with regard to ensuring potential wastewater treatment for proposed new sustainable development.

Paragraph 8 of the NPPF states:
8. Achieving sustainable development means that the planning system has three overarching objectives, which are interdependent and need to be pursued in mutually supportive ways (so that opportunities can be taken to secure net gains across each of the different objectives):

a) An economic objective - to help build a strong, responsive and competitive
economy, by ensuring that sufficient land of the right types is available in the
right places and at the right time to support growth, innovation and improved
productivity; and by identifying and coordinating the provision of infrastructure;

Paragraph 20 of the NPPF states:
20. Strategic policies should set out an overall strategy for the pattern, scale and quality of development, and make sufficient provision for:
a) housing (including affordable housing), employment, retail, leisure and other commercial development;
b) infrastructure for transport, telecommunications, security, waste management, water supply, wastewater, flood risk and coastal change management, and the provision of minerals and energy (including heat);

In the LLFAs view, the Local Plan Review is not setting out an overall strategy for the pattern, scale and quality of development in relation to arrangements for wastewater management. The LLFA considers that CDC needs to go further in incorporating within the Local Plan Review how this provision is being made.


Additional Policy Comments

Policy S12: Infrastructure Provision
Support the requirement that all development must provide or fund new infrastructure, facilities and services required, both on and off-site (including full fibre communications infrastructure) as a consequence of the proposal. The explicit reference to full fibre communications infrastructure is supported as this will provide gigabit-capable and future-proofed services to all development, existing and new. The reference to provision of facilities and services on and off-site is also supported as in the case of broadband for example, all development will be adequately equipped with the necessary infrastructure installed for the purposes of connecting to full fibre gigabit-capable broadband services. This policy supports the County Council's aim for increased digital infrastructure that will provide for gigabit-capable broadband and future technologies such as 5G.

Support the reference to safeguarding educational facilities under section 3 of the policy.

The policy includes the requirement to 'Facilitate accessibility to facilities and services by a range of transport modes'. PROW can offer vital access means for walkers and cyclists, such as for employment land use (e.g. commuting by bicycle) and in support of the high street, both for employees and customers. IT is considered that this Policy, also Policy S13: Chichester City Development Principles, should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.

The supporting text, paragraph 4.81 makes reference to the Strategic Infrastructure Package (SIP). It is requested that this wording is removed and replaced with West Sussex County Council identifies service infrastructure requirements necessary to support new and existing communities, where strategic development and growth is proposed in Local Plans. These are required to deliver the County Council's statutory responsibilities, strategic objectives and current policy and feed into the preparation of the Infrastructure Delivery Plan.


Policy S13: Chichester City Development Principles
This policy, like policy S12, it is considered should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.


Policy S23: Transport and Accessibility
The policy and supporting text paragraphs 5.15 - 5.33 refer to Transport Infrastructure. Understandably much consideration is given to the A27 around Chichester; however, in addition to seeking new infrastructure from new development, it is recommended support in principle is given to maximising the value of existing infrastructure so as to facilitate off-road user modes accessing either side of the A27.


S24: Countryside
Supporting text paragraphs 5.34 - 5.43, acknowledges 'it is necessary to provide for the social and economic needs of small rural communities, and enable those who manage, live and work in the countryside to continue to do so'. It is recognised in para 7.205, supporting text to policy SM35 Equestrian Development, the high numbers of liveried and stabled horses. A considerable network of businesses are supported by such a high equine population, and in addition to financial value within the local community there is considerable benefit in terms of health and wellbeing of individuals. It is suggested that Policy S24: Countryside, could recognise this specifically.


S27: Flood Risk Management
Supporting text paragraph 5.54, requested amendments underlined - as a consequence of the rise in sea levels and storm surges, parts of the plan area will be at increased risk from coastal erosion, groundwater, fluvial and/or tidal flooding. Hard defences may not be possible to maintain in the long term, therefore development needs to be strongly restricted in areas at risk to flooding and erosion, whilst ensuring that existing towns and villages are protected by sustainable means that make space for water in suitable areas. Development must take account of the policies of the relevant shoreline management plan

Supporting text paragraph 5.58, requested amendments underlined - Built development can lead to increased surface water run-off; therefore new
development is encouraged to incorporate mitigation techniques in its design, such as permeable surfaces and Sustainable Drainage Systems (SuDS). Where appropriate, SuDS should be used as part of the linked green infrastructure network to provide multiple functions and benefits to landscape quality, recreation and biodiversity. This can be achieved through habitat creation, new open spaces and good design. SuDS should be designed to help cope with intense rainfall events and to overcome any deterioration in water quality status. In determining the suitability of SuDS for individual development sites, developers should refer to guidance published by the Lead Local Flood Authority (LLFA): West Sussex LLFA Policy for the Management of Surface Water: https://www.westsussex.gov.uk/media/12230/ws_llfa_policy_for_management_of_surface_water.pdf and, if necessary, seek further advice from the Lead Local Flood Authority LLFA.

S27 policy text requested amendments underlined for section 1 - a. through a sequential approach, taking into consideration all forms of flooding, it is located in the lowest appropriate flood risk location in accordance with the NPPF and the Chichester Strategic Flood Risk Assessment (SFRA); and

S27 policy text requested amendments underlined for section 2. Sustainable drainage systems (SuDS) will be required on major developments (10 or more dwellings or equivalent) and encouraged for smaller schemes. SUDS should be designed into the landscape of all new development and should be included as part of a District wide approach to improve water quality and provide flood mitigation. A site-specific Flood Risk Assessment will be required for sites within or adjacent to areas at risk of surface water flooding as identified in the SFRA. There should be no increase in either the volume or rate of surface water runoff leaving the site.

S27 policy text requested additional bullet point as number 4 - Clear management arrangements and funding for their ongoing maintenance over the lifetime of the development should be proposed. Planning conditions and / or obligations will be used to secure these arrangements.

S27 policy text requested amendments underlined for section 2, but would be section 5 - Development should not result in any property or highway, on or off site, being at greater risk of flooding than the 1 in 100 year storm return period, including an allowance for climate change.


Policy S29: Green Infrastructure
The Green Infrastructure policy is welcomed, including provision of new Green Infrastructure as an integral part of the development at Strategic Development Locations. It is recommended that measures are put in place to secure the long term management of such Green Infrastructure.


Policy S30: Strategic Wildlife Corridors
The identification of Strategic Wildlife Corridors and inclusion of a policy to safeguard them from development is welcomed. It is recommended that CDC promotes positive conservation management within these corridors to maximise their contribution to maintaining and enhancing biodiversity. As stated in Section 5.66, 'These corridors do not stop at the plan area boundaries.' Thus, it is recommended that CDC works in partnership with Chichester Harbour Conservancy and The South Downs National Park Authority to ensure that these Strategic Wildlife Corridors continue to provide effective corridors and connectivity across the wider landscape.

Section 5.66 refers to four Strategic Wildlife Corridors connecting Chichester Harbour with the South Downs National Park but it is noted that there is no mention of the Strategic Wildlife Corridors to the east of Chichester which connect Pagham Harbour with the South Downs National Park (as seen in Policy Map S30b). It is also noted that the maps referred to in Section 5.66, Maps 5.1 & 5.2 are missing.

WSCC and CDC promoted a Mitigated Northern Route for the A27 at Chichester as the preferred option, subject to the inclusion of important mitigation measures that are needed to make the scheme acceptable in environmental terms and the 'full southern route' as a reasonable alternative. Both routes could impact on the identified Strategic Wildlife Corridors. As currently drafted, Policy S30 would seem to prevent a mitigated northern route from coming forward in the future. Therefore, the District Council should consider whether the policy is overly restrictive (for example should it refer to 'significant adverse impacts' or 'unacceptable adverse impacts'?) and how it would be applied if a northern route for A27 were to come forward in the future.


Policy S31: Wastewater Management and Water Quality
S27 policy text requested amendments underlined for section 3, this - Where appropriate, development should contribute to the delivery of identified actions to deliver infiltration reduction across the catchment. Where appropriate development should contribute to the delivery of identified actions to deliver a reduction in the level of infiltration of groundwater into the sewer system.


Policy AL1: Land West of Chichester
AL1 policy text requested additional bullet point as number 8 - Increase capacity to attenuate surface water on site, thereby reducing the discharge flows off the site below current rates and reducing the risk of flooding to residential areas downstream.

AL1 policy text requested additional bullet point under 15 as 15 b- Provide mitigation for any loss of watercourse habitat resulting from culverting for highway provision in the development;

AL1 policy text in supporting 'improved cycle and pedestrian routes linking the site with the city, Fishbourne and the South Downs National Park', a new key link for cycling will be to Salthill Road, thereby enabling cyclists to benefit from the existing bridge crossing of the A27 for journeys to and from the west.


AL2: Land at Shopwyke (Oving Parish)
The policy acknowledges need 'for foot/cycle bridge across A27 to Coach Road'. There is also need for equestrian users to cross the A27 and WSCC PROW has received several enquiries seeking support for such infrastructure. Consideration could be given to the proposed bridge providing for all three modes.


AL3: East of Chichester (Oving Parish)
AL3 supporting text requested amendments underlined for paragraph 6.22 - The site is identified for 600 dwellings, however, there may be potential to deliver a large strategic development of 1000 dwellings, subject to further evidence, including the testing of additional growth on the local highway network and capacity of the site to provide flood risk attenuation for the increased housing density. The site should be master planned as a whole, and delivered through a phased development over a ten year period. Although the site is physically separated from the city by the A27 Chichester Bypass, the development should form a planned extension to the city, forming a new neighbourhood. This will involve opportunities to provide new facilities to serve the wider local community with good off-site access, particularly by walking and cycling to existing local facilities and facilities in the city.

AL3 policy requires exploring integrated green infrastructure with other strategic sites to the north east of the city, Tangmere and the wider countryside. It is considered that future residents will have expectations for provision of safe and convenient links towards Oving and also across the railway to link to the A259 cycle path and PROW south of the A259. It is considered that the policy should be strengthened to ensure such provision.


Policy AL4: Land at Westhampnett/North East Chichester
AL4 policy text requested amendments underlined for section 3 - Open space and green infrastructure, including a linear greenspace with public access along the Lavant Valley.

Taking into account the site-specific requirements, proposals for the site should satisfy the following requirements:

Policy AL4 policy, it is welcomed that 'provision should be made for green links to the South Downs National Park and Chichester City.' Safe and convenient walking and cycling to Lavant, from where people will access the South Downs, will provide for sustainable transport use.


Policy AL5 Southern Gateway
AL5 supporting text requested amendments underlined for paragraph 6.38 - The area has been identified as suitable for comprehensive regeneration with the aim being to make it a more attractive and welcoming gateway for the city, providing new housing, business and retail space and leisure and tourism facilities. Opportunities will be identified to improve transport links with a focus on cycling, walking and public transport and the removal of non-essential traffic from the area. There is also scope for significant public space enhancements and new landscaping incorporating blue / green infrastructure delivering multi-functional benefits.

AL5 policy text requested amendments underlined for section 5 - Provision of open space that:
* Is in accordance with Policy DM34, including retention of the existing playing pitch unless suitable re-provision is provided;
* Reinforces / enhances green and blue infrastructure consistent with Policy S29 and fully exploits the opportunities for sustainable drainage.


AL5 policy text requested amendments underlined for section 8 - Provision of both a surface and waste water management plan which demonstrates no net increase in flow to Apuldram Waste Water Treatment Works would result from this development, unless suitable alternative provision is agreed;


Policy AL6: Land South-West of Chichester (Apuldram and Donnington Parishes)
The LLFA has concerns regarding the lack of reference to flood risk constraints of the site in Policy AL6. There is reference to flood risk in paragraph 6.47. However, the policy itself makes no reference to these constraints.
The constraints arise from a combination of the following:

* Current tidal /fluvial flood risk extending from Chichester harbour to the west and up the River Lavant floodplain; (Map 1)
* Future tidal /fluvial flood risk associated with climate change; (Map 1)
* Constraints on infiltration of surface water run off because of high seasonal groundwater levels (<0.025m below the surface) (Map 2); and
* Constraints on gravity outfalls because of the low relief and long-term reduction in tidal window for discharge.

The above limits the options for how the site can be effectively drained without a step change from typically employed methods to embrace more innovative and currently expensive options e.g. blue roofs and rainwater harvesting.

The LLFA recommends that the policy sets out both the above constraints and the type of innovative drainage that will be required to achieve the development objectives for the site.



Key: Projected medium projection extent of SLR based upon 4m contour

AL6 extent

Current Flood Zone 3 extent.

Current Areas of high (1:30) surface water flood risk

Map 1 Existing and projected Tidal and surface water flood risk for AL6.

Consistent with paragraph 3.2 of the SFRA, given the high risk of flooding both now and into the future for this site, it is recommended that CDC gives consideration to the climate change maps to understand how the flood zones are predicted to change over the lifetime of the development.


Key:
AL6 boundary.

Groundwater levels are either at very near (within 0.025m of) the ground surface.

Groundwater levels are between 0.025m and 0.5m below the ground surface

Map 2 Groundwater flood risk JBA

Policy AL6 WSCC PROW considers 'necessary highway improvements to adequately mitigate the likely impacts on the highway network' to include a bridge crossing of the A27 for convenient walking and cycling access to the Terminus Road industrial estate and the city. There is an existing public footpath but, as this crosses the A27 at-grade, this will not provide the safest facility and not encourage people to minimise use of vehicles for local access. Provision of a bridge and access through the site could also establish a valuable link to the popular Salterns Way walking and cycle path. An additional link to Salterns Way should also be provided off the A286 for the benefit of Stockbridge residents as a safer alternative to the A286.


AL 7 Highgrove Farm, Bosham
The LLFA notes that the above site has the potential for a moderate risk of groundwater flooding. It is likely that this is perched groundwater draining from higher ground / springs to the north that lies in the superficial mixed sediments underlain by Lambeth Clay.


Policy AL8: East Wittering Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'Opportunities ... for the expansion and provision of green infrastructure into the wider countryside including between settlements and facilities'. Existing and future residents and the local visitor economy would benefit by delivery of an off-road route for walkers, cyclists and horse riders to and from the Medmerry development and towards Selsey. It is considered that Policy AL8 should aim to deliver this enhancement specifically.


Policy AL9: Fishbourne Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

It is considered that off-road cycling links to land West of Chichester (off Salthill Road) and to Bosham (off Park Lane) would benefit this community with enhanced sustainable connectivity.


Policy AL10: Chidham and Hambrook Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'opportunities' to develop green infrastructure and links to other communities. An opportunity, in conjunction with Highways England, exists to maximise the value of existing infrastructure by creating a new bridleway (for walkers, cyclists and horse riders) on a path using an existing A27 overbridge.


Policy AL11: Hunston Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The village is already well connected for walkers to access the surrounding countryside but there are presently no local cycling or horse riding facilities on the PROW network. A bridleway link to South Mundham (with the potential for future cycle links to Pagham and towards Bognor Regis) and to Sidlesham via the golf course and Brimfast Lane would provide residents and visitors with improved access to the countryside and services.


Policy AL12: Land North of Park Farm, Selsey
It is unclear why the policy map shows the proposed strategic allocation lies outside of the Neighbourhood Plan proposed settlement boundary. Some explanation for this anomaly would be helpful in the text.


Groundwater flood risk as depicted by JBA mapping (Brown = seasonal groundwater level lies between 0.025 and 0.5m below the surface).

The principle concern that the LLFA wishes to highlight is the need to ensure that the necessary foul sewerage infrastructure to support development is in place. It is the LLFA understanding that the Siddlesham WWTW experiences capacity issues currently, in part exacerbated by groundwater infiltration. While Policy AL12 states: Development proposals will need to demonstrate that sufficient capacity will be available within the sewer network, including waste water treatment works, to accommodate the proposed development in accordance with Policy S31.

The policy proposes only to provide 'pedestrian links between the site and new development south of Park Lane'. It is considered that cycling links should also be provided.


Policy DM8: Transport, Accessibility and Parking
The PROW network can provide vital means for communities to interact and encourage sustainable local access. The policy requirement to create 'links between new development and existing pedestrian, cycle and public transport networks' is welcomed. However, establishing links into surrounding existing development should not be overlooked also - the greater the permeability, the greater the use.


Policy DM10: New Employment Sites
Whilst mentioned earlier in the Plan in respect of a number of specific sites, this policy should specifically aim to provide, as a matter of course, suitable walking and cycling infrastructure to encourage local sustainable access. This infrastructure may need to extend outside a site boundary so as to provide safe and convenient connection to existing infrastructure. This principle should apply also to Policy DM13: Built Tourist and Leisure Development and Policy DM14: Caravan and Camping Sites.


Policy DM32: Green Infrastructure
Whilst it is recognised the policy proposes support subject to not 'dissect[ing] ... the linear network of cycle ways, public rights of way, bridleways ...', the policy could lend support to establishing new routes as part of the Green Infrastructure network itself.


Policy DM35: Equestrian Development
It is appreciated why the Plan would wish to require future equine development to be 'well related to or has improved links to the existing bridleway network'. However, this will add to the pressure of use on the existing bridleway network, which is not extensive outside of the South Downs, so will increase degradation of paths. Future developments must, therefore, accept to contribute in some way, acceptable to the local highway authority, to mitigate the additional impact to be created so all lawful users are not disadvantaged.


Policy DM29: Biodiversity
The measures to safeguard and enhance the biodiversity value of development sites are welcomed, including seeking net biodiversity gain.


Schedule of proposed changes to the policies map
S30a West of City Corridors -suggest title should be West of City Strategic Wildlife Corridors (to match S30b: East of City Strategic Wildlife Corridors. The Strategic Wildlife Corridors are depicted in different colour patterns on the two plans which is somewhat confusing.


Strategic Wildlife Corridors Local Plan Review Background Paper
Proposed Hermitage to Westbourne Strategic Wildlife Corridor
A large area depicted as Biodiversity Opportunity Area (BOA) in Fig. 1 (immediately to the south of the Rivers Ems & Meadows Local Wildlife Site, Westbourne) is in fact housing and forms part of the settlement of Westbourne. You should consider if this land should be included as having potential for biodiversity enhancement.


Glossary
Includes Sites of Nature Conservation Importance (SNCIs) but not Local Wildlife Sites (LWSs). SNCIs are now known as LWSs.

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2141

Received: 15/02/2019

Respondent: West Sussex County Council

Representation Summary:

Flooding:
The LLFA notes that the above site has the potential for a moderate risk of groundwater flooding. It is likely that this is perched groundwater draining from higher ground / springs to the north that lies in the superficial mixed sediments underlain by Lambeth Clay.

Full text:

West Sussex County Council Officer Level Response
Introduction
The Chichester Local Plan Review Preferred Approach sets out how the future development in the District will be shaped, excluding the area within the South Downs National Park, up to 2035. It includes the overall development strategy as well as relevant strategic policies to meet the future needs of the area and development management policies to help guide development over the plan period. The Local Plan helps to:
* choose where the development goes;
* protect the character and beauty of the area;
* provide job and housing opportunities so that children can continue to work and live locally;
* support and help to boost the local economy;
* help residents to maintain healthy and active lifestyles; and,
* make sure that there is adequate services, travel options and community facilities.

The Chichester Local Plan was adopted in July 2015. At that time, the Local Plan was approved, but the Government Inspector said that it had to be reviewed again within five years, to make sure that sufficient housing was planned to meet the needs of the area.

The first part of the review process was carried out in June 2017 with an Issues and Options consultation, in which comments were invited regarding the overall development strategy and possible development locations. The Local Plan Review: Preferred Approach is the second stage of the process. It sets out the proposed development strategy and policies for the area to meet future needs.


West Sussex County Council Officer Level Comments
This note sets out West Sussex County Council's (WSCC) officer response to the consultation on the draft Chichester Local Plan Review Preferred Approach. It highlights key issues and suggested changes to which Chichester District Council (CDC) is requested to give consideration. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding WSCC service requirements in order to mitigate planned development.


Minerals and Waste
A steady and adequate supply of minerals and the achievement of sustainable waste management can help to achieve a District or Borough Council's goals in relation to the economy, housing, transport, communications, strategic infrastructure and the environment. Therefore, District and Borough Local Plans should recognise the importance of minerals and waste issues as relevant to the scope of their overall strategies.

We welcome the reference to the adopted Minerals and Waste Local Plans and safeguarding in the document and the requirements in policies where a site is located within a minerals safeguarding area, or near to a safeguarded waste site. There are some missing references to safeguarding of minerals and waste sites for some of the proposed allocations, set out below and request that these references are added. It is also requested that 'Joint' is added into the references for the Joint Minerals Local Plan through the document.

Policy W23 of the Waste Local Plan applies to all Districts & Boroughs, regarding waste management within development and should be referenced in the Chichester Local Plan Review.

AL3 East of Chichester
The site is to the north of the Fuel Depot site allocation in the Waste Local Plan (Policy W10) for a built waste facility as part of a comprehensive redevelopment of the site (including complimentary non-waste uses). The East of Chichester allocation is the land to the north, bisected by the railway line, of the Fuel Depot. Reference should be made to giving consideration to the allocation, and therefore its safeguarding.

AL4 Westhampnett/North East Chichester
Reference should be made to minerals safeguarding, for consistency with other allocations, as within the sharp sand and gravel safeguarding area.

AL5 Southern Gateway
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 200m of the Chichester Railhead.

AL6 South-West of Chichester
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 300m of the Chichester Railhead.

AL7 Highgrove Farm Bosham
Remove reference to minerals safeguarding as the site is not within the safeguarding or consultation area.

AL12 Park Farm Selsey
Reference should be made to minerals safeguarding as site is within the sharp sand and gravel safeguarding area.

Neighbourhood plan allocations
Sites are yet to be allocated though neighbourhood plans. It is considered that the Joint Minerals Local Plan and Waste Local Plan are referenced, particularly with regards to safeguarding policies (M9, M10 and W2) and these documents and policies are given detailed consideration when allocating sites. Development at, adjacent or proximal to existing waste or mineral sites / infrastructure should be the subject to consultation with WSCC.


Connectivity and Sustainable Travel
The County council has worked with the District Council on the preparation of the transport evidence base study undertaken by Peter Brett Associates for the District Council. The recommended transport mitigation strategy, as assessed using the Chichester Area Transport Model has been demonstrated to be capable in principle to prevent the development from resulting in severe residual cumulative impacts on the highways and transport network. However, the recommended strategy has several risks to deliverability and acceptability associated with it, which require further work to be undertaken to demonstrate that the strategy can be implemented in its current form to provide the forecasted mitigation to travel conditions.

There are three locations where new highway alignments are proposed outside of existing highways boundaries. Two of these may include significant earthworks or structures to be delivered, being Stockbridge Link Road and Terminus Road diversion. The cost of the mitigation strategy exceeds a figure which could reasonably be supported by the value of the proposed development developer contributions alone, therefore the delivery of the strategy will depend upon securing of external grant funding to top up developer contributions. WSCC will work with the District Council in supporting and or applying for funding, the District Council needing to secure Highways England to support funding applications for A27 improvements. The proposed junction designs for the A27 Stockbridge and Whyke roundabouts include bans to well used right turn movements off the Chichester A27 bypass which result in significant forecast changes to traffic flows on local roads in the south of Chichester and on the Manhood Peninsular.

There is a need to ensure the land outside the highway boundary is available and the plan should set out how this land will be acquired to deliver the measures, it may be that a commitment to use, if required, and therefore reference to CPO be made in the policy.

Funding for the mitigation strategy is uncertain. It is considered that the Plan should set out how it will deal with this uncertainty. This could include trigger points in the monitoring framework to trigger a change of approach or alternative options to deliver the required development.

These factors mean that feasibility work is necessary to be undertaken prior to Plan submission, to reduce as far as practicable risks to costs, land take, impacts and deliverability of the proposed transport strategy in order to show that the strategy can be implemented within the plan period and that the funding strategy will be sufficient to meet the design requirements. In particular the following will need to be addressed:

* Statutory undertakers equipment under the roads junctions to be impacted.
* Extent of earthworks required to create a vertical and horizontal alignment compliant with design standards. Design audit to identify any required departures from standard.
* Designing for drainage and flooding issues, including compliance with the WSCC LLFA Policy for the Management of Surface Water, November 2018.
* Designs for structures to cross watercourses - Stockbridge Link Road
* Design should include suitable provision for rights of way and footway crossings
* Scoping for whether and at what level further Environmental Impact Assessment will be required.
* Stage 1 Road safety Audit, designers response report and resulting amendments to designs.
* Land take required after feasibility level designs have been developed and availability of required land.
* Wophams Lane - impacts of forecast changes to flow patterns to take B2201 southbound traffic on requirements for highway width, alignment, footway provision and junctions with A286 Birdham Road and B2201 Selsey Road; design solution required.
* Quarry Lane, Kingsham Avenue /Road, Terminus Road; impacts of forecast flow changes on highway users, residential and commercial frontagers and measures to manage through traffic whilst maintaining local access

Sustainable transport measures will also be required to mitigate planned development. These will be identified through more detailed assessments of sites including pre-application consideration. Funding will need to be identified through development and other sources as well in some cases.

Public Rights of Way
There is support for the Local Plan Review's approach to Public Rights Of Way (PROW), not just for the potential to impact on existing public off-road access but also the opportunity it brings to enhance this access for the benefit of future residents, communities and visitors. PROW deliver benefits for personal health and wellbeing; sustainable transport; reduction of air pollution and road congestion; are able to support local economies; and they connect communities.
WSCC PROW welcomes several aspects of the Vision statement, which give support to the protection and enhancement of the PROW network, and provision of safe and convenient off-road access opportunities for residents and visitors:

* Pursue a healthy lifestyle and benefit from a sense of well-being supported by good access to education, health, leisure, open space and nature, sports and other essential facilities;
* Live in sustainable neighbourhoods supported by necessary infrastructure and facilities;
* Move around safely and conveniently with opportunities to choose alternatives to car travel.

The Local Plan Strategic Objectives offer further support to enhance off-road access, particularly to 'Encourage healthy and active lifestyles for all, developing accessible health and leisure facilities and linked green spaces'. However, the objective to 'Achieve a sustainable and integrated transport system through improved cycling networks and links to public transport' should recognise walking also as an important mode for many people; some strategic enhancements will significantly improve walkers' safety and convenience.

It is considered that West of Chichester the A259 could act as a corridor for increased volumes of non-motorised access, particularly cycling. Improvement of the existing on-road facility and development of a various 'feeder' routes to connect with the many settlements, perhaps using quiet lanes in places, would encourage cycling particularly to be a natural alternative to vehicle use. Policy S18: Integrated Coastal Zone Management for the Manhood Peninsula, gives regard to such an ambition in stating it will 'Improve infrastructure to support sustainable modes of transport, especially cycle ways, bridleways and footpaths, including the National Coastal Footpath'.

The National Planning Policy Framework (NPPF) Open Space and Recreation, para 97b) states:
the loss resulting from the proposed development would be replaced by equivalent or better provision in terms of quantity and quality in a suitable location.
The NPPF para 98 also states:
Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks including National Trails.'
There is support for Policy S20: Design, that recognises these requirements in stating development 'is well connected to provide safe and convenient ease of movement by all users, prioritising pedestrian and cycle movements both within the scheme and neighbouring areas and ensuring that the needs of vehicular traffic does not dominate at the expense of other modes of transport, or undermine the resulting quality of places' and 'incorporates and/or links to high quality Green Infrastructure and landscaping to enhance biodiversity and meet recreational needs, including public rights of way'.


Education
As the local education authority, WSCC has the statutory duty to ensure that there is a sufficient supply of suitable school places to meet statutory requirements for early years, primary, secondary and sixth form provision (including up to age 25 for those with special educational needs and/or disabilities). Education infrastructure, or contributions to provide infrastructure, will be required in order to mitigate proposed development. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding education and other service requirements in order to mitigate planned development.

The table below sets out the primary, secondary school and sixth form requirements to mitigate proposed development. SEE ATTACHMENT FOR TABLE

AL1 Land West of Chichester

It should be noted that phase one of this development will provide the primary school with the core of the building being built to the specification for a 2 form entry (FE) school and 1FE teaching accommodation. Phase 2 as per 6.10 on page 93 should include expansion of the primary school for the further 1FE of teaching accommodation.

AL2 Land at Shopwhyke (Oving Parish)

No update to original response for this allocation is required.

AL3 Land East of Chichester - previously South of Shopwhyke

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 1 FE expandable to 2FE and pro rata share of the build costs would be required.

If numbers were to increase on the east side of the city, education provision will need to be reviewed, potentially a further 1FE may be required including land provision, this could be in the form of an expansion or a new school being built capable of expansion to 3FE.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL4 Land at Westhampnett / North East Chichester

The remaining 200 dwellings will impact on the education provision in the area, financial contributions towards expansion of existing or pro rata costs towards the expansion of the school within AL3.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL5 Southern Gateway

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from the strategic allocation of 350 dwellings in the Southern Gateway. However, consideration should be given to the cumulative impact of housing in the area Land South West of Chichester (AL6) to allocate land within the area for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL6 Land South West of Chichester (Apuldram & Donnington Parishes)

It should be noted that the primary education provision in this area is either in Chichester City Centre which means crossing the main A27 or by travelling south towards the peninsula. Consideration should be given to the cumulative impact of further housing in the area along with the Southern Gateway allocation (AL5) to allocate land within the strategic allocation site for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL7 Bosham

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. The strategic allocation of 250 dwellings in isolation does not require a new school to be built. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL9 Fishbourne

The primary school serving the area is currently at capacity, expansion of the school may be possible, feasibility / options appraisals would need to be undertaken.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of primary and secondary schools and sixth form if feasible and required.

AL8 East Wittering

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development.

Contributions would be required for expansion of primary and secondary schools if feasible and required.

AL10 Chidham and Hambrook area

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL11 Hunston

Any development within this area cannot currently be accommodated in the existing primary school at North Mundham. Further capacity would be required to accommodate the development, CDC will need to work with WSCC to determine how additional capacity in the area could be accommodated if land is to be allocated.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

AL12 Selsey

Further capacity would be required to accommodate the development. Contributions (and possibly land if required) would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

AL13 Southbourne

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 2form entry expandable to 3FE primary school and pro rata share of the build costs would be required.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL14 Tangmere

The current allocation of 1,300 dwellings will bring forward the requirement for land for a 1FE expandable to 2FE and financial contributions would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

Footnote: - if all of the proposed sites were to come forward the secondary school and sixth form provision would be full in the Chichester Planning Area. Expansion of the secondary schools in the Chichester Planning Area to cater for the increased demand would need to be sought from the academy sponsors, where appropriate and the Local Authority.


Lead Local Flood Authority
The Lead Local Flood Authority (LLFA) is concerned about the approach being taken with regard to ensuring potential wastewater treatment for proposed new sustainable development.

Paragraph 8 of the NPPF states:
8. Achieving sustainable development means that the planning system has three overarching objectives, which are interdependent and need to be pursued in mutually supportive ways (so that opportunities can be taken to secure net gains across each of the different objectives):

a) An economic objective - to help build a strong, responsive and competitive
economy, by ensuring that sufficient land of the right types is available in the
right places and at the right time to support growth, innovation and improved
productivity; and by identifying and coordinating the provision of infrastructure;

Paragraph 20 of the NPPF states:
20. Strategic policies should set out an overall strategy for the pattern, scale and quality of development, and make sufficient provision for:
a) housing (including affordable housing), employment, retail, leisure and other commercial development;
b) infrastructure for transport, telecommunications, security, waste management, water supply, wastewater, flood risk and coastal change management, and the provision of minerals and energy (including heat);

In the LLFAs view, the Local Plan Review is not setting out an overall strategy for the pattern, scale and quality of development in relation to arrangements for wastewater management. The LLFA considers that CDC needs to go further in incorporating within the Local Plan Review how this provision is being made.


Additional Policy Comments

Policy S12: Infrastructure Provision
Support the requirement that all development must provide or fund new infrastructure, facilities and services required, both on and off-site (including full fibre communications infrastructure) as a consequence of the proposal. The explicit reference to full fibre communications infrastructure is supported as this will provide gigabit-capable and future-proofed services to all development, existing and new. The reference to provision of facilities and services on and off-site is also supported as in the case of broadband for example, all development will be adequately equipped with the necessary infrastructure installed for the purposes of connecting to full fibre gigabit-capable broadband services. This policy supports the County Council's aim for increased digital infrastructure that will provide for gigabit-capable broadband and future technologies such as 5G.

Support the reference to safeguarding educational facilities under section 3 of the policy.

The policy includes the requirement to 'Facilitate accessibility to facilities and services by a range of transport modes'. PROW can offer vital access means for walkers and cyclists, such as for employment land use (e.g. commuting by bicycle) and in support of the high street, both for employees and customers. IT is considered that this Policy, also Policy S13: Chichester City Development Principles, should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.

The supporting text, paragraph 4.81 makes reference to the Strategic Infrastructure Package (SIP). It is requested that this wording is removed and replaced with West Sussex County Council identifies service infrastructure requirements necessary to support new and existing communities, where strategic development and growth is proposed in Local Plans. These are required to deliver the County Council's statutory responsibilities, strategic objectives and current policy and feed into the preparation of the Infrastructure Delivery Plan.


Policy S13: Chichester City Development Principles
This policy, like policy S12, it is considered should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.


Policy S23: Transport and Accessibility
The policy and supporting text paragraphs 5.15 - 5.33 refer to Transport Infrastructure. Understandably much consideration is given to the A27 around Chichester; however, in addition to seeking new infrastructure from new development, it is recommended support in principle is given to maximising the value of existing infrastructure so as to facilitate off-road user modes accessing either side of the A27.


S24: Countryside
Supporting text paragraphs 5.34 - 5.43, acknowledges 'it is necessary to provide for the social and economic needs of small rural communities, and enable those who manage, live and work in the countryside to continue to do so'. It is recognised in para 7.205, supporting text to policy SM35 Equestrian Development, the high numbers of liveried and stabled horses. A considerable network of businesses are supported by such a high equine population, and in addition to financial value within the local community there is considerable benefit in terms of health and wellbeing of individuals. It is suggested that Policy S24: Countryside, could recognise this specifically.


S27: Flood Risk Management
Supporting text paragraph 5.54, requested amendments underlined - as a consequence of the rise in sea levels and storm surges, parts of the plan area will be at increased risk from coastal erosion, groundwater, fluvial and/or tidal flooding. Hard defences may not be possible to maintain in the long term, therefore development needs to be strongly restricted in areas at risk to flooding and erosion, whilst ensuring that existing towns and villages are protected by sustainable means that make space for water in suitable areas. Development must take account of the policies of the relevant shoreline management plan

Supporting text paragraph 5.58, requested amendments underlined - Built development can lead to increased surface water run-off; therefore new
development is encouraged to incorporate mitigation techniques in its design, such as permeable surfaces and Sustainable Drainage Systems (SuDS). Where appropriate, SuDS should be used as part of the linked green infrastructure network to provide multiple functions and benefits to landscape quality, recreation and biodiversity. This can be achieved through habitat creation, new open spaces and good design. SuDS should be designed to help cope with intense rainfall events and to overcome any deterioration in water quality status. In determining the suitability of SuDS for individual development sites, developers should refer to guidance published by the Lead Local Flood Authority (LLFA): West Sussex LLFA Policy for the Management of Surface Water: https://www.westsussex.gov.uk/media/12230/ws_llfa_policy_for_management_of_surface_water.pdf and, if necessary, seek further advice from the Lead Local Flood Authority LLFA.

S27 policy text requested amendments underlined for section 1 - a. through a sequential approach, taking into consideration all forms of flooding, it is located in the lowest appropriate flood risk location in accordance with the NPPF and the Chichester Strategic Flood Risk Assessment (SFRA); and

S27 policy text requested amendments underlined for section 2. Sustainable drainage systems (SuDS) will be required on major developments (10 or more dwellings or equivalent) and encouraged for smaller schemes. SUDS should be designed into the landscape of all new development and should be included as part of a District wide approach to improve water quality and provide flood mitigation. A site-specific Flood Risk Assessment will be required for sites within or adjacent to areas at risk of surface water flooding as identified in the SFRA. There should be no increase in either the volume or rate of surface water runoff leaving the site.

S27 policy text requested additional bullet point as number 4 - Clear management arrangements and funding for their ongoing maintenance over the lifetime of the development should be proposed. Planning conditions and / or obligations will be used to secure these arrangements.

S27 policy text requested amendments underlined for section 2, but would be section 5 - Development should not result in any property or highway, on or off site, being at greater risk of flooding than the 1 in 100 year storm return period, including an allowance for climate change.


Policy S29: Green Infrastructure
The Green Infrastructure policy is welcomed, including provision of new Green Infrastructure as an integral part of the development at Strategic Development Locations. It is recommended that measures are put in place to secure the long term management of such Green Infrastructure.


Policy S30: Strategic Wildlife Corridors
The identification of Strategic Wildlife Corridors and inclusion of a policy to safeguard them from development is welcomed. It is recommended that CDC promotes positive conservation management within these corridors to maximise their contribution to maintaining and enhancing biodiversity. As stated in Section 5.66, 'These corridors do not stop at the plan area boundaries.' Thus, it is recommended that CDC works in partnership with Chichester Harbour Conservancy and The South Downs National Park Authority to ensure that these Strategic Wildlife Corridors continue to provide effective corridors and connectivity across the wider landscape.

Section 5.66 refers to four Strategic Wildlife Corridors connecting Chichester Harbour with the South Downs National Park but it is noted that there is no mention of the Strategic Wildlife Corridors to the east of Chichester which connect Pagham Harbour with the South Downs National Park (as seen in Policy Map S30b). It is also noted that the maps referred to in Section 5.66, Maps 5.1 & 5.2 are missing.

WSCC and CDC promoted a Mitigated Northern Route for the A27 at Chichester as the preferred option, subject to the inclusion of important mitigation measures that are needed to make the scheme acceptable in environmental terms and the 'full southern route' as a reasonable alternative. Both routes could impact on the identified Strategic Wildlife Corridors. As currently drafted, Policy S30 would seem to prevent a mitigated northern route from coming forward in the future. Therefore, the District Council should consider whether the policy is overly restrictive (for example should it refer to 'significant adverse impacts' or 'unacceptable adverse impacts'?) and how it would be applied if a northern route for A27 were to come forward in the future.


Policy S31: Wastewater Management and Water Quality
S27 policy text requested amendments underlined for section 3, this - Where appropriate, development should contribute to the delivery of identified actions to deliver infiltration reduction across the catchment. Where appropriate development should contribute to the delivery of identified actions to deliver a reduction in the level of infiltration of groundwater into the sewer system.


Policy AL1: Land West of Chichester
AL1 policy text requested additional bullet point as number 8 - Increase capacity to attenuate surface water on site, thereby reducing the discharge flows off the site below current rates and reducing the risk of flooding to residential areas downstream.

AL1 policy text requested additional bullet point under 15 as 15 b- Provide mitigation for any loss of watercourse habitat resulting from culverting for highway provision in the development;

AL1 policy text in supporting 'improved cycle and pedestrian routes linking the site with the city, Fishbourne and the South Downs National Park', a new key link for cycling will be to Salthill Road, thereby enabling cyclists to benefit from the existing bridge crossing of the A27 for journeys to and from the west.


AL2: Land at Shopwyke (Oving Parish)
The policy acknowledges need 'for foot/cycle bridge across A27 to Coach Road'. There is also need for equestrian users to cross the A27 and WSCC PROW has received several enquiries seeking support for such infrastructure. Consideration could be given to the proposed bridge providing for all three modes.


AL3: East of Chichester (Oving Parish)
AL3 supporting text requested amendments underlined for paragraph 6.22 - The site is identified for 600 dwellings, however, there may be potential to deliver a large strategic development of 1000 dwellings, subject to further evidence, including the testing of additional growth on the local highway network and capacity of the site to provide flood risk attenuation for the increased housing density. The site should be master planned as a whole, and delivered through a phased development over a ten year period. Although the site is physically separated from the city by the A27 Chichester Bypass, the development should form a planned extension to the city, forming a new neighbourhood. This will involve opportunities to provide new facilities to serve the wider local community with good off-site access, particularly by walking and cycling to existing local facilities and facilities in the city.

AL3 policy requires exploring integrated green infrastructure with other strategic sites to the north east of the city, Tangmere and the wider countryside. It is considered that future residents will have expectations for provision of safe and convenient links towards Oving and also across the railway to link to the A259 cycle path and PROW south of the A259. It is considered that the policy should be strengthened to ensure such provision.


Policy AL4: Land at Westhampnett/North East Chichester
AL4 policy text requested amendments underlined for section 3 - Open space and green infrastructure, including a linear greenspace with public access along the Lavant Valley.

Taking into account the site-specific requirements, proposals for the site should satisfy the following requirements:

Policy AL4 policy, it is welcomed that 'provision should be made for green links to the South Downs National Park and Chichester City.' Safe and convenient walking and cycling to Lavant, from where people will access the South Downs, will provide for sustainable transport use.


Policy AL5 Southern Gateway
AL5 supporting text requested amendments underlined for paragraph 6.38 - The area has been identified as suitable for comprehensive regeneration with the aim being to make it a more attractive and welcoming gateway for the city, providing new housing, business and retail space and leisure and tourism facilities. Opportunities will be identified to improve transport links with a focus on cycling, walking and public transport and the removal of non-essential traffic from the area. There is also scope for significant public space enhancements and new landscaping incorporating blue / green infrastructure delivering multi-functional benefits.

AL5 policy text requested amendments underlined for section 5 - Provision of open space that:
* Is in accordance with Policy DM34, including retention of the existing playing pitch unless suitable re-provision is provided;
* Reinforces / enhances green and blue infrastructure consistent with Policy S29 and fully exploits the opportunities for sustainable drainage.


AL5 policy text requested amendments underlined for section 8 - Provision of both a surface and waste water management plan which demonstrates no net increase in flow to Apuldram Waste Water Treatment Works would result from this development, unless suitable alternative provision is agreed;


Policy AL6: Land South-West of Chichester (Apuldram and Donnington Parishes)
The LLFA has concerns regarding the lack of reference to flood risk constraints of the site in Policy AL6. There is reference to flood risk in paragraph 6.47. However, the policy itself makes no reference to these constraints.
The constraints arise from a combination of the following:

* Current tidal /fluvial flood risk extending from Chichester harbour to the west and up the River Lavant floodplain; (Map 1)
* Future tidal /fluvial flood risk associated with climate change; (Map 1)
* Constraints on infiltration of surface water run off because of high seasonal groundwater levels (<0.025m below the surface) (Map 2); and
* Constraints on gravity outfalls because of the low relief and long-term reduction in tidal window for discharge.

The above limits the options for how the site can be effectively drained without a step change from typically employed methods to embrace more innovative and currently expensive options e.g. blue roofs and rainwater harvesting.

The LLFA recommends that the policy sets out both the above constraints and the type of innovative drainage that will be required to achieve the development objectives for the site.



Key: Projected medium projection extent of SLR based upon 4m contour

AL6 extent

Current Flood Zone 3 extent.

Current Areas of high (1:30) surface water flood risk

Map 1 Existing and projected Tidal and surface water flood risk for AL6.

Consistent with paragraph 3.2 of the SFRA, given the high risk of flooding both now and into the future for this site, it is recommended that CDC gives consideration to the climate change maps to understand how the flood zones are predicted to change over the lifetime of the development.


Key:
AL6 boundary.

Groundwater levels are either at very near (within 0.025m of) the ground surface.

Groundwater levels are between 0.025m and 0.5m below the ground surface

Map 2 Groundwater flood risk JBA

Policy AL6 WSCC PROW considers 'necessary highway improvements to adequately mitigate the likely impacts on the highway network' to include a bridge crossing of the A27 for convenient walking and cycling access to the Terminus Road industrial estate and the city. There is an existing public footpath but, as this crosses the A27 at-grade, this will not provide the safest facility and not encourage people to minimise use of vehicles for local access. Provision of a bridge and access through the site could also establish a valuable link to the popular Salterns Way walking and cycle path. An additional link to Salterns Way should also be provided off the A286 for the benefit of Stockbridge residents as a safer alternative to the A286.


AL 7 Highgrove Farm, Bosham
The LLFA notes that the above site has the potential for a moderate risk of groundwater flooding. It is likely that this is perched groundwater draining from higher ground / springs to the north that lies in the superficial mixed sediments underlain by Lambeth Clay.


Policy AL8: East Wittering Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'Opportunities ... for the expansion and provision of green infrastructure into the wider countryside including between settlements and facilities'. Existing and future residents and the local visitor economy would benefit by delivery of an off-road route for walkers, cyclists and horse riders to and from the Medmerry development and towards Selsey. It is considered that Policy AL8 should aim to deliver this enhancement specifically.


Policy AL9: Fishbourne Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

It is considered that off-road cycling links to land West of Chichester (off Salthill Road) and to Bosham (off Park Lane) would benefit this community with enhanced sustainable connectivity.


Policy AL10: Chidham and Hambrook Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'opportunities' to develop green infrastructure and links to other communities. An opportunity, in conjunction with Highways England, exists to maximise the value of existing infrastructure by creating a new bridleway (for walkers, cyclists and horse riders) on a path using an existing A27 overbridge.


Policy AL11: Hunston Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The village is already well connected for walkers to access the surrounding countryside but there are presently no local cycling or horse riding facilities on the PROW network. A bridleway link to South Mundham (with the potential for future cycle links to Pagham and towards Bognor Regis) and to Sidlesham via the golf course and Brimfast Lane would provide residents and visitors with improved access to the countryside and services.


Policy AL12: Land North of Park Farm, Selsey
It is unclear why the policy map shows the proposed strategic allocation lies outside of the Neighbourhood Plan proposed settlement boundary. Some explanation for this anomaly would be helpful in the text.


Groundwater flood risk as depicted by JBA mapping (Brown = seasonal groundwater level lies between 0.025 and 0.5m below the surface).

The principle concern that the LLFA wishes to highlight is the need to ensure that the necessary foul sewerage infrastructure to support development is in place. It is the LLFA understanding that the Siddlesham WWTW experiences capacity issues currently, in part exacerbated by groundwater infiltration. While Policy AL12 states: Development proposals will need to demonstrate that sufficient capacity will be available within the sewer network, including waste water treatment works, to accommodate the proposed development in accordance with Policy S31.

The policy proposes only to provide 'pedestrian links between the site and new development south of Park Lane'. It is considered that cycling links should also be provided.


Policy DM8: Transport, Accessibility and Parking
The PROW network can provide vital means for communities to interact and encourage sustainable local access. The policy requirement to create 'links between new development and existing pedestrian, cycle and public transport networks' is welcomed. However, establishing links into surrounding existing development should not be overlooked also - the greater the permeability, the greater the use.


Policy DM10: New Employment Sites
Whilst mentioned earlier in the Plan in respect of a number of specific sites, this policy should specifically aim to provide, as a matter of course, suitable walking and cycling infrastructure to encourage local sustainable access. This infrastructure may need to extend outside a site boundary so as to provide safe and convenient connection to existing infrastructure. This principle should apply also to Policy DM13: Built Tourist and Leisure Development and Policy DM14: Caravan and Camping Sites.


Policy DM32: Green Infrastructure
Whilst it is recognised the policy proposes support subject to not 'dissect[ing] ... the linear network of cycle ways, public rights of way, bridleways ...', the policy could lend support to establishing new routes as part of the Green Infrastructure network itself.


Policy DM35: Equestrian Development
It is appreciated why the Plan would wish to require future equine development to be 'well related to or has improved links to the existing bridleway network'. However, this will add to the pressure of use on the existing bridleway network, which is not extensive outside of the South Downs, so will increase degradation of paths. Future developments must, therefore, accept to contribute in some way, acceptable to the local highway authority, to mitigate the additional impact to be created so all lawful users are not disadvantaged.


Policy DM29: Biodiversity
The measures to safeguard and enhance the biodiversity value of development sites are welcomed, including seeking net biodiversity gain.


Schedule of proposed changes to the policies map
S30a West of City Corridors -suggest title should be West of City Strategic Wildlife Corridors (to match S30b: East of City Strategic Wildlife Corridors. The Strategic Wildlife Corridors are depicted in different colour patterns on the two plans which is somewhat confusing.


Strategic Wildlife Corridors Local Plan Review Background Paper
Proposed Hermitage to Westbourne Strategic Wildlife Corridor
A large area depicted as Biodiversity Opportunity Area (BOA) in Fig. 1 (immediately to the south of the Rivers Ems & Meadows Local Wildlife Site, Westbourne) is in fact housing and forms part of the settlement of Westbourne. You should consider if this land should be included as having potential for biodiversity enhancement.


Glossary
Includes Sites of Nature Conservation Importance (SNCIs) but not Local Wildlife Sites (LWSs). SNCIs are now known as LWSs.

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2269

Received: 01/02/2019

Respondent: Historic England

Representation Summary:

According to our records, the site at Highgrove Farm, Bosham, contains no designated heritage assets. We therefore have no comment on the principle of the allocation, although we would expect its potential for non-designated archaeology to have been assessed, with reference to the Council's Historic Environment Record, in accordance with paragraph 187.

This comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.

Full text:

Paragraph 1.5 of the Local Plan Review states "This Plan seeks to balance the economic, social and environmental dimensions of sustainable development". "Balance" implies some gains and some losses. However, this does not reflect the four bullet points that follow this sentence.
In addition, Paragraph 8 of the National Planning Policy Framework explains that;
"Achieving sustainable development means that the planning system has three overarching objectives, which are interdependent and need to be pursued in mutually supportive ways (so that opportunities can be taken to secure net gains across each of the different objectives)".

We therefore suggest that "balance" is not the most appropriate word.

The three overarching objectives include; "c) an environmental objective - to contribute to protecting and enhancing our natural, built and historic environment......". We therefore welcome the fourth bullet point of paragraph 1.5; "Protecting and enhancing the unique and special qualities of our environment".

Reword the first sentence of paragraph 1.5 as; "This Plan seeks to deliver the economic, social and environmental dimensions of sustainable development in mutually supportive ways".

Paragraph 1.16 explains that the National Planning Policy Framework reiterates the importance of significantly boosting the supply of new dwellings, whilst ensuring provision for other development needs including economic growth.
Whilst not untrue, we consider that this does not fully represent the Government's objectives and policies as set out in the Framework and therefore gives the misleading impression that the Framework is only about housing supply and economic development.
In fact, the protection and enhancement of the natural, built and historic environment is also identified as important in the Framework e.g. in the environmental overarching objective for the planning system as set out in paragraphs 8, 11b)i and 20 d).
Reword the final sentence of paragraph 1.16 as:
"The importance of significantly boosting the supply of new dwellings is reiterated, whilst ensuring provision for other development needs including economic growth and protecting and enhancing the natural, built and historic environment".
Paragraph 31 of the National Planning Policy Framework requires "The preparation and review of all policies should be underpinned by relevant and up-to-date evidence". We previously expressed our concerns about the historic evidence base for the policy framework for the district when commenting on the Issues and Options stage of the Local Plan Review;
"We are aware of the Council's series of Conservation Area Character Appraisals, The Future Growth of Chichester Study and the Landscape Capacity Studies. However, the Council's "Supporting documents" webpage has no historic environment documents and we are not clear if the Council has other historic environment evidence e.g. is there an extensive urban survey of Chichester or other townscape or characterisation study ? Is there an urban archaeological database ? Is there a list of locally important heritage assets ? Has the Council undertaken a survey of grade II buildings at risk ?".
However, looking at the Council's Local Plan Review Preferred Approach Plan - Evidence Base - December 2018 webpage, the only specific historic environment evidence base document identified is the Chichester Historic Environment Strategy and Action Plan. Whilst we welcome the Strategy, we have previously expressed the view that we do not consider that it forms, by itself, an adequate historic environment evidence base for the Local Plan Review.
We are aware that the Council has a list of locally important buildings, but that Chichester was not covered by the West Sussex Extensive Historic Town Surveys - perhaps as it was thought a candidate for the more intensive approach of an Urban Archaeological Database (UAD). However, we are not aware that such a UAD exists, and whilst we are aware of the Council's Historic Environment Record (the availability of which accords with paragraph 187 of the National Planning Policy Framework), we do wonder if the archaeological evidence and significance of the city is fully understood and readily available. We suggested that the Historic Environment Strategy could set out actions to enhance understanding and management of the archaeological resource of the historic city and we would be pleased to discuss how we might be able to assist with this.
We will expect the Council to have an adequate, up-to-date and relevant historic environment evidence base and to demonstrate in the Pre-Submission Local Plan how that historic evidence base has informed and influenced the Plan's policies and site allocations.
The historic environment evidence base for the Local Plan Review should be set out on the Council's Evidence Base webpage. If there are indeed gaps in that evidence base, then these should be filled and that evidence taken on board in preparing the Pre-Submission Local Plan Review document.
Historic England welcomes and supports the reference to the historic environment of Chichester district, and the heritage assets therein, in paragraphs 2.27 and 2.28 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.

Historic England welcomes and supports, in principle, the identification of "Protect the area's valuable heritage and historic assets" as one of the challenges faced by the Plan.
However, the National Planning Policy Framework requires local plans to deliver an environmental overarching objective which includes "to contribute to conserving and enhancing our natural, built and historic environment" (paragraph 8 c)) and to include strategic policies to make sufficient provision for "conservation and enhancement of the natural, built and historic environment" (our underlining).
The Framework therefore requires local planning authorities, through their local plans, to do more than just conserve the historic environment i.e. to enhance it as well. This should be identified as a challenge (although it is also an opportunity).
Reword the last bullet point of paragraph 2.28 as; "Protect and enhance the area's valuable heritage and historic assets".
Historic England welcomes, in principle, as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework, the reference to the historic environment in paragraph 3.1;

"It is the intention of the Council to enable the delivery of infrastructure, jobs, accessible local services and housing for future generations while supporting the historic and natural environment".

However, the National Planning Policy Framework refers to "conserving and enhancing our natural, built and historic environment" (paragraph 8 c)) and the "conservation and enhancement of the natural, built and historic environment". We therefore suggest that "supporting" should be "conserving and enhancing" as terminology more consistent with the Framework and possibly ambiguous than "supporting".

Reword the first sentence of paragraph 3.1 as;
"It is the intention of the Council to enable the delivery of infrastructure, jobs, accessible local services and housing for future generations while conserving and enhancing the historic, built and natural environment".
Historic England welcomes the inclusion of "Have a quality of life that is enriched through opportunities to enjoy our local culture, arts and a conserved and enhanced heritage;" in the Vision as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes "As an historic walled cathedral city, its rich cultural and architectural heritage will be conserved, enhanced and promoted together with the views and landscape value afforded by its setting" in paragraph 3.4 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports "The conservation and enhancement of the historic environment, the high quality landscapes and the agricultural and other rural activities that support it will remain paramount" in paragraph 3.14 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports, in principle, the Strategic Objective "Conserve and enhance landscape and heritage" as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework. However, we suggest that it could be rather more ambitious e.g. "Conserve, enhance, increase appreciation and enjoyment of and access to heritage"
Paragraph 4.2 states that; "New development must achieve sustainable development principles and must not adversely affect the character, quality, amenity or safety of the built environment, wherever it occurs". The implication is that this is a requirement of the National Planning Policy Framework, but we cannot find this exact wording in the Framework.

However, paragraph 127 of the Framework does set out what planning policies and decisions should ensure of developments, including "are sympathetic to local character and history" and "establish or maintain a strong sense of place". In addition, paragraph 185 of the Framework requires plans to set out a positive strategy for the conservation and enjoyment of the historic environment, which should take into account "the desirability of new development making a positive contribution to local character and distinctiveness".

We therefore consider that the final sentence of paragraph 4.2 should be revised to more closely reflect the requirements of the National Planning Policy Framework.

Reword the final sentence of paragraph 4.2 as ""New development must achieve sustainable development principles, must not adversely affect the history, quality, amenity or safety of the natural, built and historic environment and should make a positive contribution to local character and distinctiveness and establish or maintain a sense of place". (Alternatively, these could be set out as bullet points for clarity).
Historic England welcomes and supports "enhance the quality of the built, natural, historic, social and cultural environments" in Policy S2 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Although the historic environment is not identified as a constraint or as an opportunity for enhancement in paragraph 4.12 as a factor in the definition of the Settlement Hierarchy, we note that paragraph 4.14 does explain that consideration has been given to other factors in determining whether a settlement is a suitable location for additional housing growth. We would like to think that these other factors include the potential effects on the historic environment.
Historic England welcomes and supports "where possible enhances the character, significance and setting of heritage assets" as one of the considerations to guide potential discussions on a possible site for a new settlement in paragraph 4.33 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports "it is acknowledged that new development needs to be planned sensitively with special regard to the unique character of the city's historic environment and setting, and should be underpinned by historic characterisation assessments" in paragraph 4.90 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Nevertheless, we suggest that reference should also be made to heritage impact assessments to underpin the planning of new development.
Reword paragraph 4.90 to read;
"it is acknowledged that new development needs to be planned sensitively with special regard to the unique character of the city's historic environment and setting, and should be underpinned by historic characterisation assessment and heritage impact assessments".
Historic England welcomes and supports "such development will need to be sensitive to the
historic character of the city" in paragraph 4.91 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports "conserve and enhance the city's historic character and heritage", "Enhance the city's existing heritage, arts and cultural facilities", "Protect views of the cathedral" and "All development will be required to have special regard to the city's historic character and heritage. Development proposals should be underpinned by historic characterisation assessments and make a positive contribution to the city's unique character and distinctiveness" in Policy S13 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Nevertheless, we would like to see a reference to heritage impact assessments to underpin development proposals.
We also wonder if it would be helpful to have a specific policy to protect important views, allied to or combined with a policy for tall buildings in the historic city ?
Reword Policy SP13 to read "Development proposals should be underpinned by historic characterisation assessment and a heritage impact assessment......".
Historic England welcomes and supports "Any development proposals within the vicinity of the site must clearly demonstrate how the development would protect, and where possible enhance, the operation and heritage of the site as a motor-circuit and airfield" in Policy S15 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports "All proposals must ensure that the cultural and historical significance of the military facilities (and any other significant archaeological assets) located on the site, are understood and inform the scope of future development of that site" in Policy S17 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
However, we would prefer "significant archaeological assets" to be retained in situ.
Reword Policy S17 as;
"All proposals must ensure that the cultural and historical significance of the military facilities (and any other significant archaeological assets) located on the site, are understood and inform the scope of future development of that site, with any significant archaeological assets retained in situ".
Paragraph 2.2 of the Plan notes that the North of the Plan Area has "rich cultural and heritage assets". We are surprised, therefore, that paragraph 4.128 has no mention of these assets.
Reword paragraph 4.128 "This part of the plan area is predominantly rural with few sizeable settlements, characterised by undulating countryside with a high proportion of woodland, typical of the Low Weald landscape. Conserving the rural character of the area, with its high quality landscape and natural and historic environment, is a key objective".
Historic England welcomes and supports "Conserve and enhance the rural character of the area, the quality of its landscape and the natural and historic environment;" in Policy S19 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes paragraph 5.1 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Strictly-speaking, historic parks and gardens are registered for their special historic interest rather than their protection per se, but one of the purposes of Registration is to encourage appropriate protection and inclusion on the Register is a material consideration in the determination of planning applications.
Historic England welcomes paragraph 5.5 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports Policy S20, particularly the references to history, historic character and local identity in clause 1, sense of place in clause 2, character in clause 8 and high quality public realm in clause 11 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
However, we would also like to see a specific clause relating to heritage assets.
Add a new clause; "conserves or enhances the significance, special interest, character and appearance of heritage assets".
Historic England welcomes and supports paragraph 5.12 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes, in principle, paragraph 5.13 states that "Where development proposals might affect a heritage asset the Council will identify and assess the particular significance of the heritage asset and seek to avoid or minimise any conflict between the conservation of the heritage asset and any aspect of the proposal" as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
This very largely reflects paragraph 190 of the National Planning Policy Framework, but the Framework requires local planning authorities to take the particular significance of any heritage asset that might be affected by a proposal into account when considering the impact of a proposal on a heritage asset, "to avoid or minimise any conflict between the heritage asset's conservation and any aspect of the proposal". The requirement is clear - any conflict should be avoided or minimised; it is not sufficient to merely "seek to" avoid or minimise that conflict.

In addition, paragraph 189 of the Framework states;

"In determining applications, local planning authorities should require an applicant to describe the significance of any heritage assets affected, including any contribution made by their setting......Where a site on which development is proposed includes, or has the potential to include, heritage assets with archaeological interest, local planning authorities should require developers to submit an appropriate desk-based assessment and, where necessary, a field evaluation.

There is, therefore, a clear onus to be placed upon the applicant/developer to identify and describe the significance of any heritage assets affected.

Paragraphs 193, 194, 195 and 196 of the Framework set out how local planning authorities should consider the impact of a proposed development on the significance of a designated heritage asset. We believe that this could usefully be summarised in the Plan.

Reword paragraph 5.13;
"Where development proposals might affect a heritage asset the Council will identify and assess the particular significance of the heritage asset and take that significance into account when considering the impact of a proposal on a heritage asset, to avoid or minimise any conflict between the heritage asset's conservation and any aspect of the proposal".
Add new paragraphs;
"For applications which affect, or have the potential to affect, heritage assets the applicant will be expected to describe the significance of the asset and its setting, using appropriate expertise; at a level of detail proportionate to its significance and sufficient to understand the potential impact of the proposal; using appropriate references such as the Historic Environment Record and, if necessary, original survey (including, for assets of archaeological interest, an appropriate desk-based assessment and, where necessary, a field evaluation)";
"When considering the impact of a proposed development on the significance of a designated heritage asset, the Council will give great weight to the asset's conservation. Any harm to, or loss of, the significance of a designated heritage asset (from its alteration or destruction, or from development within its setting), will require clear and convincing justification"; and

"The Council will refuse proposals that would lead to substantial harm to (or total loss of significance of) a designated heritage asset unless it can be demonstrated that the substantial harm or total loss is necessary to achieve substantial public benefits that outweigh that harm or loss, or all of the circumstances in paragraph 195 of the National Planning Policy Framework apply. For proposals that would lead to less than substantial harm to the significance of a designated heritage asset, the Council will weigh this harm against the public benefits of the proposal".

Historic England welcomes and supports Policy S22, which we consider complies with the requirements of paragraphs 17 and 20 of the National Planning Policy Framework to contain strategic policies and for those strategic policies to make sufficient provision for the conservation and enhancement of the historic environment.

We also consider that the policy forms part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework. We consider that the word "positive" is significant, and we believe that the Plan (and Council) should be proactive in the conservation and enhancement of the historic environment. National Planning Practice Guidance states "Such a [positive] strategy should recognise that conservation is not a passive exercise".
We therefore consider that the positive strategy for the conservation and enjoyment of the historic environment is not a passive exercise but requires a plan for the maintenance and use of heritage assets and for the delivery of development including within their setting that will afford appropriate protection for the asset(s) and make a positive contribution to local character and distinctiveness. We therefore look to local plans to contain commitments to positive measures for the historic environment. We therefore welcome the commitments within Policy S22 to positive actions, including heritage at risk, which paragraph 185 requires to be part of that positive strategy for the conservation and enjoyment of the historic environment. However, we do feel that the supporting text could helpfully explain a little more about the Council's approach to heritage at risk, perhaps borrowing some text from the Chichester Historic Environment Strategy and Action Plan.
We also consider that the positive strategy should comprise recognition throughout the Plan of the importance of the historic environment, of the historic environment's role in delivering the Plan's vision and the wider economic, social and environmental objectives for the Plan area, and of the potential impacts of the Plan's policies and proposals on the historic environment.
We are pleased to have identified a number of references throughout the Plan to the historic environment and we therefore consider that the Plan sets out an adequate positive strategy for the conservation and enjoyment of that historic environment as required by paragraph 185 of the National Planning Policy Framework and that the Plan is therefore compliant with that paragraph.

Add a new paragraph explaining what "heritage at risk" is and the Council's approach to assets at risk e.g.

"Unfortunately, heritage assets can be at risk from neglect, decay or other threats. Designated assets at risk, with the exception of Grade II secular buildings and Grade II places of worship used less than six times a year, are identified on the Historic England Heritage at Risk Register. Within the district outside the South Downs National Park, six assets are on the Register (February 2018): three scheduled monuments, two listed buildings and one conservation area. The Council will actively seek to address threats to heritage assets by recording and monitoring Heritage at Risk in Chichester District, publishing it on our website and working with the owners of heritage assets at risk to find solutions and secure repairs to bring them back into active use, including where appropriate viable new uses and/or proposals for enabling development so they are preserved for future generations."

Historic England suggests that paragraph 5.37 could also refer to the range of heritage assets to be found in the countryside of the Plan area.
Reword paragraph 5.37 as;

"It is valued for many reasons, including agriculture and community food production, its landscape qualities including the special characteristics of Chichester Harbour and Pagham Harbour, the setting it provides for Chichester City and other towns and villages, its range of heritage assets, including historic landscapes, and the opportunities it provides for recreation and biodiversity".
Historic England welcomes and supports clause d of Policy S32; "integrate with the surrounding built, historic and natural environments" as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
As noted in paragraph 6.12, the Chichester Entrenchments Scheduled Monument lies partly within and partly immediately to the north of the site. Paragraph 194 of the National Planning Policy Framework identifies Scheduled Monuments as being assets "of the highest significance", substantial harm to or loss of which should be wholly exceptional.

We have previously commented (as English Heritage) on the allocation of this site during the consultation on the Key Policies. We explained that development close to the earthworks might harm the historical value of the heritage asset by interrupting views between its parts and introducing incongruous land-use in its immediate surroundings. This in turn would make it difficult to appreciate the asset's open rural setting, its extensive linear nature and its purpose of enclosing large areas of open land.

Accordingly, we initially objected to the form of the allocation in the Key Policies, but subsequently withdrew that objection following amendments to the boundary of the Strategic Development Location on its northern side so that the boundary ran along the south edge of the belt of woodland in which the scheduled monument sits, thereby entirely excluding the monument from the SDL, and the allocation of the northern area of the amended site as open space.
We are therefore pleased to see that the Strategic Site Allocation still excludes the scheduled monument. We also welcome and support the following requirements of Policy AL1, which we consider provide, in principle, adequate protection for the Scheduled Monument in accordance with the National Planning Policy Framework:
6. Landscaped to protect priority views of Chichester Cathedral spire;
7. Keep land north of the B2178 in open use, free from built development, to protect the natural history interest of both Brandy Hole Copse, and the setting of the Chichester Entrenchments Scheduled Monument;
8. Conserve, enhance and better reveal the significance of the Chichester Entrenchments Scheduled Monument and other non-designated heritage assets and their settings and to record and advance understanding of the significance of any heritage assets to be harmed or lost;
However, this comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
Historic England makes no comment on the principle of the Shopwyke Strategic Site Allocation, which we note is an existing allocation.
However, the Grade II listed barn at Greenway Farm is located to the south-west of the site and the Grade II listed Shopwyke Grange and the Grade II* listed Shopwyke Hall are located to the south-east. Paragraph 194 of the National Planning Policy Framework states "Any harm to, or loss of, the significance of a designated heritage asset (from its alteration or destruction, or from development within its setting), should require clear and convincing justification". The paragraph identifies Grade II* buildings as assets of the "highest significance".

Historic England therefore welcomes and supports, in principle, the following requirement of Policy AL2, which we consider provide, in principle, adequate protection for the listed barn and Shopwyke Hall in accordance with the National Planning Policy Framework:
7. Protect existing views of Chichester Cathedral spire and conserve and enhance the historic significance of the listed barn at Greenway Farm and the cluster of buildings associated with the grade II* listed Shopwhyke Hall, which should be analysed at an early stage of the masterplan.
However, we consider that reference should also be made to the Grade II listed Shopwyke Grange. This comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
Reword criterion 7;"Protect existing views of Chichester Cathedral spire and conserve and enhance the historic significance of the listed barn at Greenway Farm, the listed Shopwyke Grange and the cluster of buildings associated with the grade II* listed Shopwhyke Hall which should be analysed at an early stage of the masterplan".
According to our records there are no designated heritage assets on this site, although the Grade II listed Shopwyke Grange and Grade II* listed Shopwyke Hall lie to the north-east of the allocated area, Paragraph 194 of the National Planning Policy Framework states "Any harm to, or loss of, the significance of a designated heritage asset (from its alteration or destruction, or from development within its setting), should require clear and convincing justification". The paragraph identifies Grade II* buildings as assets of the "highest significance".

We note that criterion 7 of Policy AL2 requires the development of the Shopwyke Strategic Site Allocation to ".......conserve and enhance the historic significance of the......cluster of buildings associated with the grade II* listed Shopwhyke Hall, which should be analysed at an early stage of the masterplan. We have suggested in our comments on this policy that it include reference to the listed Shopwyke Grange, and we consider that this requirement should also be included in Policy AL3 to provide, in principle, adequate protection for the listed barn and Shopwyke Hall in accordance with the National Planning Policy Framework.

Historic England welcomes and supports criterion 8 of Policy AL2; "Existing views of Chichester Cathedral spire are to be protected". However, this comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
Reword criterion 8 as;
"Protect existing views of Chichester Cathedral spire and conserve and enhance the historic significance of the listed Shopwyke Grange and the cluster of buildings associated with the grade II* listed Shopwhyke Hall which should be analysed at an early stage of the masterplan".
Historic England makes no comment on the principle of the two sites at Land at Westhampnett/North East Chichester Strategic Site Allocation, which we note were part of a broad strategic development location in the adopted Local Plan.
However, the site abuts the Graylingwell Hospital Conservation Area, the buildings of the former 'pauper lunatic asylum' (including the Grade II listed chapel), the Grade II listed Summersdale Farmhouse and a Grade II registered park and garden. Paragraph 194 of the National Planning Policy Framework states "Any harm to, or loss of, the significance of a designated heritage asset (from its alteration or destruction, or from development within its setting), should require clear and convincing justification".
Historic England therefore welcomes and supports, in principle, the following requirement of Policy AL4, which we consider provide, in principle, adequate protection for these designated assets in accordance with the National Planning Policy Framework:
9. Development should be designed with special regard to the Graylingwell Hospital
Conservation Area, the buildings of the former 'pauper lunatic asylum' and the Grade II registered park and garden in which they sit, and to other listed buildings in the vicinity of the site and their settings. Important views of Chichester Cathedral spire from the area should be protected;
This comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
Historic England makes no comment on the principle of the Southern Gateway Strategic Site Allocation.
However, the site includes a row of Grade II listed buildings on Southgate and a number of non-designated heritage assets (the southern gateway of the city had Roman roads converging upon it and this is likely to result in enhanced archaeological potential in this part of the city. The development of suburbs in the medieval and later periods is a further factor with both the canal and railway as examples of later uses of the area. There are a number of buildings of interest, including the former Law Courts and Bus Garage). Part of the site lies within the Chichester Conservation Area and there are listed buildings adjacent to the site.
Paragraph 184 of the National Planning Policy Framework states heritage assets "are an irreplaceable resource, and should be conserved in a manner appropriate to their significance, so that they can be enjoyed for their contribution to the quality of life of existing and future generations". Paragraph 194 of the Framework states "Any harm to, or loss of, the significance of a designated heritage asset (from its alteration or destruction, or from development within its setting), should require clear and convincing justification".

Historic England therefore welcomes and supports, in principle, the following requirements of Policy AL5;

3. Respect for the historic context and make a positive contribution towards protecting and enhancing the local character and special heritage of the area and important historic views, especially those from the Canal Basin towards Chichester Cathedral;
9. Include an archaeological assessment to define the extent and significance of any
archaeological remains and reflect these in the proposals, as appropriate;
However, we consider that these requirements should be strengthened to ensure that they provide adequate protection for these assets in accordance with the National Planning Policy Framework. In addition, we consider that Policy AL5 should promote more strongly the opportunity to use the heritage of the area to help define its character and the desirability of new development making a positive contribution to local character and distinctiveness as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
These comments are without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
Reword clause 2 as follows;
Proposals should include a high quality distinctive design response appropriate to this gateway location and based on the character and heritage of the area, which establishes a clear hierarchy of streets and spaces, active frontages of buildings which front streets and spaces with clearly defined building lines;
Reword clause 3 as follows;
3. Respect for the historic context and make a positive contribution towards protecting and enhancing the local character and special heritage of the area, including the Conservation Area, listed buildings (both on and adjacent to the site), non-designated buildings of historic interest and important historic views, especially those from the Canal Basin towards Chichester Cathedral;
Reword clause 9 as follows;
9. Include an archaeological assessment to define the extent and significance of any
archaeological remains and reflect these in the proposals;
According to our records, the site Land South-West of Chichester (Apuldram and Donnington Parishes) contains no designated heritage assets. We therefore have no comment on the principle of the allocation, although we would expect its potential for non-designated archaeology to have been assessed, with reference to the Council's Historic Environment Record, in accordance with paragraph 187 of the National Planning Policy Framework which states;
Local planning authorities should maintain or have access to a historic environment record. This should contain up-to-date evidence about the historic environment in their area and be used to:
a) assess the significance of heritage assets and the contribution they make to their environment; and
b) predict the likelihood that currently unidentified heritage assets, particularly sites of historic and archaeological interest, will be discovered in the future.
Historic England welcomes and supports clause 3:
3. Protect existing views of Chichester Cathedral spire and the setting of the Chichester Harbour Area of Outstanding Natural Beauty which should be analysed at an early stage of the masterplan;
This comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
According to our records, the site at Highgrove Farm, Bosham, contains no designated heritage assets. We therefore have no comment on the principle of the allocation, although we would expect its potential for non-designated archaeology to have been assessed, with reference to the Council's Historic Environment Record, in accordance with paragraph 187 of the National Planning Policy Framework which states;
Local planning authorities should maintain or have access to a historic environment record. This should contain up-to-date evidence about the historic environment in their area and be used to:
a) assess the significance of heritage assets and the contribution they make to their environment; and
b) predict the likelihood that currently unidentified heritage assets, particularly sites of historic and archaeological interest, will be discovered in the future.
This comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.

Historic England has no comments on the principle of land being allocated in the revised Fishbourne Neighbourhood Plan for a minimum of 250 dwellings.
However, we note that one of the specific issues that need to be taken into account in planning for development at Fishbourne identified in paragraph 6.65 of the Plan is "Protecting the heritage assets of Fishbourne and their setting".
We welcome the recognition and identification of this issue, but we consider that it should be included as a specific requirement in Policy AL9, to ensure that the allocation of the site or sites in the Neighbourhood Plan conforms with the National Planning Policy Framework, particularly paragraphs 184 and 194.
Add the following clause to Policy AL9;
"Demonstration that the development would not have an adverse impact on the significance of heritage assets, including listed buildings and the Fishbourne Roman site Scheduled Monument, or the character or appearance of the Fishbourne Conservation Area".
Historic England has no comments on the principle of land being allocated in the revised Chidham and Hambrook Neighbourhood Plan for a minimum of 500 dwellings.
However, we consider that Policy AL10 should include a specific requirement to ensure that the allocation of the site or sites in the Neighbourhood Plan conforms with the National Planning Policy Framework, particularly paragraphs 184 and 194.
Add the following clause to Policy AL10;
"Demonstration that the development would not have an adverse impact on the significance of heritage assets.
Historic England has no comments on the principle of land being allocated in the revised Hunston Neighbourhood Plan for a minimum of 250 dwellings.
However, we note that one of the specific issues that need to be taken into account in planning for development at Hunston identified in paragraph 6.77 of the Plan is "Respecting the setting of listed buildings and the Hunston conservation area".
We welcome the recognition and identification of this issue, but we consider that it should be included as a specific requirement in Policy AL11, to ensure that the allocation of the site or sites in the Neighbourhood Plan conforms with the National Planning Policy Framework, particularly paragraphs 184 and 194.
Add the following clause to Policy AL11;
"Demonstration that the development would not have an adverse impact on the significance of heritage assets, including listed buildings, or on the character or appearance of the Hunston Conservation Area."
According to our records, the site Land north of Park Farm, Selsey, contains no designated heritage assets. We therefore have no comment on the principle of the allocation, although we would expect its potential for non-designated archaeology to have been assessed, with reference to the Council's Historic Environment Record, in accordance with paragraph 187 of the National Planning Policy Framework which states;
Local planning authorities should maintain or have access to a historic environment record. This should contain up-to-date evidence about the historic environment in their area and be used to:
a) assess the significance of heritage assets and the contribution they make to their environment; and
b) predict the likelihood that currently unidentified heritage assets, particularly sites of historic and archaeological interest, will be discovered in the future.

This comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
Historic England has no comments on the principle of land being allocated in the revised Southbourne Neighbourhood Plan for a minimum of 1,250 dwellings.
However, we consider that a specific requirement should be included in Policy AL13 to ensure that the allocation of the site or sites in the Neighbourhood Plan conforms with the National Planning Policy Framework, particularly paragraphs 184 and 194.
Add the following clause to Policy AL13;
"Demonstration that the development would not have an adverse impact on the significance of heritage assets, including listed buildings, or on the character or appearance of the Prinsted Conservation Area."
Historic England has no comments on the principle of the allocation Land West of Tangmere.

However, the site is close to the Tangmere Conservation Area and a number of listed buildings, including the Grade I listed Church of St Andrew. Paragraph 194 of the National Planning Policy Framework states "Any harm to, or loss of, the significance of a designated heritage asset (from its alteration or destruction, or from development within its setting), should require clear and convincing justification". The paragraph identifies Grade I buildings as assets of the "highest significance".

Historic England therefore welcomes, in principle, clauses 5 and 8 of Policy AL14

5. Protect existing views of Chichester Cathedral spire and reduce any impact on views from within the National Park;
8. Conserve and enhance the heritage and potential archaeological interest of the village, surrounding areas and World War II airfield, including the expansion or relocation of the Tangmere Military Aviation Museum.
However, we consider that clause 8 should be strengthened to ensure that it provides adequate protection for these assets in accordance with the National Planning Policy Framework. In addition, we note that paragraph 6.95 of the Plan identifies, as one of the specific issues need to be taken into account in planning the development and site layout at Tangmere, "Conserving and enhancing the setting of the historic village (particularly the Conservation Area"). We consider that this should be included within Policy AL14.
This comment is without prejudice to any comments we may wish to make on any planning application that may be submitted for the development of this site.
Reword criterion 8 as follows:

8. Conserve and enhance the heritage and potential archaeological interest of the village, surrounding areas and World War II airfield, particularly the Conservation Area and the Grade I listed Church of St Andrew and including the expansion or relocation of the Tangmere Military Aviation Museum.
Add a new criterion as follows:
""Conserve and enhancie the setting of the historic village, particularly of the Conservation Area".
Historic England welcomes and supports clause b of Policy DM3 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports clauses 1 c and 2 e of Policy DM5 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes, in principle, clause 2 of Policy DM13 but considers that the policy should be, in the first instance, to avoid adverse impact on the historic environment as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework. We consider that the wording used in Policies DM3 and DM5 would be appropriate.
Reword clause 2 of Policy DM13 as:
"Is located so as not compromise the essential features of nationally designated areas of landscape, historic environment or nature conservation protection".
Historic England welcomes and supports clause 1 of Policy DM17 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports clause b of Policy DM20 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Historic England welcomes and supports paragraph 7.129 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Many farm buildings that are now redundant for modern farming needs are likely to be of historic interest - it is acknowledged that farm buildings are generally under-represented on the National Heritage List for England. Historic England considers that Policy DM21 should include stronger protection for such buildings as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.
Add a new criterion to Policy DM21 as follows:

"Features of architectural or historic significance are retained and, where the building forms part of a historically significant complex of buildings, consideration is given to the future use(s) of those buildings and the impact of the proposal on the integrity and character of the complex".
Historic England welcomes and supports, in principle, paragraphs 7.154 - 7.161.
However, we consider that paragraph 7.154 should be reworded to clarify the distinction between designated and non-designated heritage assets (the latter including buildings on the Local Buildings List for Chichester).
Reword paragraph 7.154 as follows:
"There are a large number of "Heritage Assets" (as defined in the National Planning Policy Framework), both designated and non-designated, in the plan area. Designated assets are Listed Buildings, Scheduled Monuments, Conservation Areas and Registered Historic Parks and Gardens. Non-designated assets include archaeological sites (although the remains may be of national significance equivalent to scheduled monuments, and which should be considered subject to the policies for scheduled monuments) and non-listed buildings which have been identified as locally important, such as those on the Local Buildings List for Chichester City and 'positive' buildings within Conservation Areas."
Historic England welcomes and supports in principle, Policy DM27 both as part of the positive strategy for the conservation and enjoyment of the historic environment as required by paragraph 185 of the National Planning Policy Framework and also as a non-strategic policy for the conservation and enhancement of the historic environment as suggested by paragraph 28 of the Framework.
However, we consider that clause e. should specify the (wholly) exceptional circumstances in which permission for a proposed development that would lead to substantial harm to (or total loss of significance of) a designated heritage asset would be granted i.e. where it can be demonstrated that the substantial harm or total loss is necessary to achieve substantial public benefits that outweigh that harm or loss, or all of the circumstances in paragraph 195 of the National Planning Policy Framework apply.

We would also welcome the policy being more detailed in terms of the considerations to be taken into account when assessing development proposals affecting the different types of heritage asset, as do, for example, Policies EH10, EH11, EH14 and EH15 of the West Oxfordshire Local Plan 2031. These policies were developed with Historic England and the Inspector that examined the Local Plan 2031 shared our concern that the historic environment policy in the Local Plan 2031 provided inadequate locally specific detailed policy guidance and considered the more detailed policies necessary for the Plan to be sound.

(However, we do acknowledge that the Inspector that examined the Key Policies development plan document considered the modified historic environment policy (Policy 47) put forward by the Council with our support was sufficient for the Plan to be sound, and that Policy DM27 in the Local Plan Review very largely repeats Policy 47).

Reword clause e. of Policy DM27 as follows;
"Development involving substantial harm to or loss of designated heritage assets will
only be granted in exceptional circumstances (wholly exceptional circumstances for
designated assets of the highest significance) i.e. where it can be demonstrated that the substantial harm or total loss is necessary to achieve substantial public benefits that outweigh that harm or loss, or all of the circumstances in paragraph 195 of the National Planning Policy Framework apply.

More details of the considerations to be taken into account when assessing development proposals affecting the different types of heritage asset. We would be pleased to work with the Council on a revised policy or policies.

Paragraph 7.195 of the Plan notes that the remnants of canals "are important early 19th Century historic features in the landscape of the coastal plain and warrant protection".
Historic England agrees with this statement, but Policy DM33 makes no mention of protecting the historic significance of the remaining canal sections.
Reword the first paragraph of Policy DM33 as follows;
"Development that makes provision of through navigation or enhancement of the Chichester Ship Canal and the Wey and Arun Canal will be supported where it meets environmental, ecological, historical and transport considerations."
Historic England welcomes and supports clause 3 of Policy DM34 as part of the positive strategy for the conservation and enjoyment of the historic environment required by paragraph 185 of the National Planning Policy Framework.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2307

Received: 07/02/2019

Respondent: Portsmouth Water Ltd

Representation Summary:

Policy AL7 'Bosham' is situated on the old A27 and there are no large diameter mains in the area.

Full text:

Spatial Vision
Portsmouth Water note that there are significant additional housing allocations to the west of Chichester and on the coastal strip. These sites will need to be assessed for water supply and funding included in the Infrastructure Charging scheme. (See Map 4.1 Key Diagram)

It is not clear what water storage capacity is being referred to in Section 3.19. Portsmouth Water will review the provision of Service Reservoirs, for day to day use, and has re-started development of a large raw water storage reservoir at Havant Thicket. The reservoir, when combined with Portsmouth Water's existing sources and enhancements to its groundwater sources, would create sufficient
surplus to support an additional flexible daily transfer of treated water from Portsmouth Water are to Southern Water without detriment to Portsmouth Water's resilience.

Southern Water requires this transfer to help meet a significant deficit in its Southampton East, Southampton West and Isle of Wight resource zones. This deficit arose after Southern Water agreed to reduce its abstraction licences on the Rivers Test and River Itchen at a public inquiry in March 2018, to help protect the environment.

It is not clear that the water demands of the Horticultural Development Areas have been assessed. It is possible that these businesses will rely on rainwater harvesting and storage but changes in licencing regulations mean that 'Trickle Irrigation' is no longer exempt from abstraction licencing.

Groundwater abstraction in the coastal plain will require an impact assessment under the Habitats Regulations. (Section 4.75)

Spatial Strategy

Policy S12 sets out how development can make effective use of existing infrastructure. Portsmouth Water agree that the siting and timing of development can assist with the economic provision of water resource infrastructure. It also states that safeguarding existing infrastructure, such as water mains and aquifers, is important. Portsmouth Water would urge developers to check for existing infrastructure and for source protection zones that may limit development options.
Water infrastructure is not funded through CIL but a separate 'Infrastructure Charge' payable for each individual house. This is designed to pay for all off-site water infrastructure such as mains reinforcements, service reservoirs and supply. Development to an agreed program will help this system work effectively.

Strategic Policies

Policy S27 'Flood Risk Management' refers to Sustainable Drainage Systems (SuDS) and the need to control surface water run-off. It should also refer to aquifer protection and the need for caution when using infiltration systems especially deep bore systems. This applies particularly when the site is in, or close to, a source protection zone.

Policy S31 'Wastewater Management and Water Quality' refers to higher standards in the Building Regulations for water consumption to reduce pollution in the harbours. Portsmouth Waters 'Water Resources Management Plan' is based on lower per capita consumption and we have an aspiration for all customer to reach 100 litres/head/day by 2050. This is no substitute for reducing overall flows
to sewage treatment works by the control of groundwater infiltration and surface water drainage.

Strategic Site Allocations

Policy AL1 'West of Chichester' does not mention water supply so we assume that the site has reverted to a conventional system with sewerage pumped to Tangmere WWTW and water supplied by us. Portsmouth Water has provided provisional designs for this system and there are no existing large diameter water mains on the site. Costs for reinforcement of the water mains will be recovered by the new Infrastructure Charge and on site mains are likely to be provided by a third
party. Information on how reinforcement of the water mains is recovered by the Infrastructure Charge can be found in Portsmouth Water's Developer Charging Arrangements on our website under https://www.portsmouthwater.co.uk/developers/.

Policy AL2 'Shopwyke' is already under construction and has a conventional water supply system with all elements provided by us. Costs are being recovered via the Infrastructure Charge and on-site charges.

Policy AL3 'East of Chichester' is a new strategic site and there are no large diameter mains crossing it. This is an old landfill and may contain material that can damage plastic pipes. On site mains may need to be protected or be more expensive to ensure water quality is maintained.

Policy AL4 'Westhampnett' Phase 1 is already under construction and account has been taken of the large diameter main that crosses the site. Phase 2 is an extension of the existing Greylingwell site but it is not clear if this has been allowed for in the design of this 'Inset Appointment'. Portsmouth Water do not own the mains and there may be a single point of supply.

Policy AL5 'Southern Gateway' is an inner city development with a good water supply system. The reference to the 'efficient use of water' is confusing because many of the other strategic development sites also drain to Apuldram WWTW. All sites need to be water efficient but not follow the example of the 'Code for Sustainable Homes'. Sites were developed in Chichester that used rainwater harvesting to meet the Code objectives but were able to use higher water use fittings such as power showers. This led to properties producing more sewage than equivalent water efficient homes. This did not achieve the objective at Apuldram. An alternative provision might be to reduce infiltration but it is not clear how this would be funded or who would carry out the work.

Policy AL6 'South West Chichester' is crossed by a large diameter main that will have to be reflected in the road layout or diverted. The proposed link road may offer an alternative route for the main.

Policy AL7 'Bosham' is situated on the old A27 and there are no large diameter mains in the area.

Policy AL8 'East Wittering' is at the extremity of the distribution system and may be expensive to supply.

Policy AL9 'Fishbourne' allocation is not site specific and it is difficult to comment on the feasibility of water supply. Any off site costs will be recovered via the new Infrastructure Charge. Portsmouth Water have public water supply abstractions in the area and development is likely to be located in a source protection zone for our Fishbourne public water supply abstraction. Under this policy, where development is in a source protection zone, the policy should also refer to groundwater quality
protection and the additional requirements when using infiltration systems in particular deep bore systems. Further guidance on Portsmouth Water's preferred approach to development relating to groundwater quality within our catchments can be found within 'Portsmouth Water's Groundwater Protection Guidance notes' which are attached to this response and also available to view on our website under https://www.portsmouthwater.co.uk/developers/groundwater-protection/.

Policy AL10 'Chidham and Hambrook' is a large site and may need to be considered in combination with 'Southbourne' and 'Bosham'. There are no large diameter mains in the area and mains reinforcements may be required.

Policy AL11 'Hunston' allocation is not site specific.

Policy A12 'Selsey' is at the extremity of the distribution system and has seen previous housing growth. Reinforcement of the water mains may need to be provided.

Policy AL13 'Southbourne' is supplied from a different distribution system to Chichester. This is a very large housing allocation and this may need to be considered in combination with 'Hambrook' and 'Bosham'. There are sufficient water resources for all the housing allocated to Portsmouth Water's area of supply. It is the location of the housing site in relation to existing trunk mains and
service reservoirs that determines the cost to supply. Local reinforcement of the water mains may be required.

Policy AL14 'Tangmere' housing allocation has increased by 30% and we may need to repeat the modelling that has already been done. There is also uncertainty about the water supply to the HDA which seems to rely on rainwater harvesting for future growth. The housing development and the HDA could have an impact on our source protection zone. Under this policy, where development is in a source protection zone, the policy should also refer to groundwater quality protection and the
additional requirements when using infiltration systems in particular deep bore systems. Guidance should be sought from Portsmouth Water's Groundwater Protection Guidance for development.

Policy AL15 'Land at Chichester Business Park, Tangmere' Portsmouth Water have public water supply abstractions in the area and the site allocation is likely to be within a source protection zone for our Aldingbourne public water supply abstraction. As above, where development is in a source protection zone, the policy should also refer to groundwater quality protection and the need for caution when using infiltration systems in particular deep bore systems. Please refer to Portsmouth Water's Groundwater Protection Guidance for further information.

Development Management

Policy DM10: 'New Employment Sites' Development proposal should be compatible with other policies in the Plan, in particular DM9 'Existing Employment Sites' to ensure that the development is otherwise acceptable. Policy DM9 states that development should 'not generate unacceptable levels of water pollution' and this should include groundwater pollution. This requirement should also be applied to Policy DM10, especially when the site is in, or close to, a source protection zone.

Policy DM15 'Horticultural Development' Developments at Tangmere HDA have relied on infiltration to dispose of excess surface water. This policy states that development should 'not generate unacceptable levels of water pollution' and this should include groundwater pollution. Portsmouth Water have public water supply abstractions in the area and the potential impacts must be assessed for any SUDS. The EA 'Abstraction Licencing Strategy' (ALS) may give an indication about the
availability of groundwater but it does not cover the derogation of existing supplies.

Policy DM16 'Sustainable Design and Construction' covers the use of Building Regulations to control water use. Portsmouth Water have an aspiration to reduce overall water use to 100 litres/head/day and this policy will help to achieve that aim.

Policy DM18 'Water Management' using SUDS needs to take account groundwater quality and should avoid direct infiltration into the chalk aquifer. This is especially important within the source protection zones.

Policy DM29 'Biodiversity' Portsmouth Water has legal duties to protect and where practical enhance biodiversity and has an active program of work on it's own land. This work is now expanding to include projects on other people's land in association with 'Catchment Management' activities. We would look to CDC for support in areas such as Bosham Stream, Lavant Stream and Fishbourne Stream where schemes could be developed in partnership with local housing developments.

Policy DM35 'Equestrian Development' can have a direct impact on water quality including groundwater quality. Portsmouth Water support the protection of water courses and aquifers.

Appendix 'E' Monitoring Framework

Policy S12 covers the provision of infrastructure but it is not clear how records of completed projects will be collected or stored.

Policy S26 covers biodiversity improvements and Natural England should be consulted on priorities and record keeping.

Policy S31 covers water consumption which is only available for the whole Company area in the WRMP Annual Review.