10.56
Support
Chichester Local Plan 2021 - 2039: Proposed Submission
Representation ID: 4062
Received: 14/03/2023
Respondent: Southbourne Parish Council
Ref. bullet point 2
There is currently insufficient infrastructure which needs addressing in addition to new facilities which the PC would support. Provision of improved transport links to mitigate delays at level crossings are crucial.
Ref. bullet point 2
There is currently insufficient infrastructure which needs addressing in addition to new facilities which the PC would support. Provision of improved transport links to mitigate delays at level crossings are crucial.
Support
Chichester Local Plan 2021 - 2039: Proposed Submission
Representation ID: 4064
Received: 14/03/2023
Respondent: Southbourne Parish Council
Ref Bullet point 3.
The ChEm route is a crucial part of this para. as well as a pedestrian bridge over the railway.
Ref Bullet point 3.
The ChEm route is a crucial part of this para. as well as a pedestrian bridge over the railway.
Support
Chichester Local Plan 2021 - 2039: Proposed Submission
Representation ID: 4065
Received: 14/03/2023
Respondent: Southbourne Parish Council
Ref Bullet point 5
The two Wildlife Corridors (Lumley Stream and Ham Brook) and the proposed Green Ring play crucial parts in the aspirations of this paragraph.
Ref Bullet point 5
The two Wildlife Corridors (Lumley Stream and Ham Brook) and the proposed Green Ring play crucial parts in the aspirations of this paragraph.