10.20

Showing comments and forms 1 to 2 of 2

Support

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 4832

Received: 17/03/2023

Respondent: Miller Homes and Vistry Group

Agent: Mr Nick Billington

Representation Summary:

Paragraph 10.20 accurately summarizes the proposals for the second phase of development with one exception [6045 refers]

Full text:

Paragraph 10.20 accurately summarizes the proposals for the second phase of development with one exception – the pavilion associated with the playing pitches has been provided in full as part of the phase 1 permission and sized to accommodate phase 2 requirements. The full sized pavilion is currently being built out. The paragraph should be amended to reflect this.

Attachments:

Object

Chichester Local Plan 2021 - 2039: Proposed Submission

Representation ID: 6045

Received: 17/03/2023

Respondent: Miller Homes and Vistry Group

Agent: Mr Nick Billington

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

An exception to the accuracy of the paragraph is that the pavilion associated with the playing pitches has been provided in full as part of the phase 1 permission and sized to accommodate phase 2 requirements.

Change suggested by respondent:

The full sized pavilion is currently being built out. The paragraph should be amended to reflect this.

Full text:

Paragraph 10.20 accurately summarizes the proposals for the second phase of development with one exception – the pavilion associated with the playing pitches has been provided in full as part of the phase 1 permission and sized to accommodate phase 2 requirements. The full sized pavilion is currently being built out. The paragraph should be amended to reflect this.

Attachments: