Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2932

Received: 06/02/2019

Respondent: CPRE Sussex

Representation Summary:

Issues with net gain. We are disappointed that Chichester DC does not appear to want to take a lead on this topic and set a standard for other authorities. Given the time scale of the plan (to 2035) it is very likely that the statutory requirement for net gain will be in place, and we would wish to see the principle more firmly established in this plan. This would also be consistent with the statements made in Section 5 on Design Standards and Policy DM18 on Sustainable Design and Construction.

Full text:

See attachment

Attachments: