Para 17 of the Adopted Local Plan 2014-2029 stated that because the Tangmere Water Works upgrade would only be operational from 2019, proposed strategic allocations in the Chichester/Tangmere area were not expected to be deliverable until after 2019. To compensate the Plan strategy sought the early release of housing land in areas where wastewater capacity was available, i.e. the Manhood Peninsula.
Para 17 of the Adopted Local Plan 2014-2029 stated that because the Tangmere Water Works upgrade would only be operational from 2019, proposed strategic allocations in the Chichester/Tangmere area were not expected to be deliverable until after 2019. To compensate the Plan strategy sought the early release of housing land in areas where wastewater capacity was available, i.e. the Manhood Peninsula.