Local Plan Review: Preferred Approach 2016-2035

Policy AL3: Land East of Chichester

Representation ID: 2357

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL4: Land at Westhampnett/North East Chichester

Representation ID: 2358

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL5: Southern Gateway

Representation ID: 2359

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL6: Land South-West of Chichester (Apuldram and Donnington Parishes)

Representation ID: 2360

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL7: Highgrove Farm, Bosham

Representation ID: 2361

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL8: East Wittering Parish

Representation ID: 2362

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL9: Fishbourne Parish

Representation ID: 2363

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL10: Chidham and Hambroo Parish

Representation ID: 2364

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL11: Hunston Parish

Representation ID: 2365

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.

Support

Local Plan Review: Preferred Approach 2016-2035

Policy AL12: Land North of Park Farm, Selsey

Representation ID: 2366

Received: 05/02/2019

Respondent: West Sussex Local Access Forum (WSLAF)

Representation Summary:

Opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

Full text:

Para 3.2 bullet points 5, 9 & 10 - these objectives are supported
The Local Plan Strategic Objectives
Para 3.19 Health & Well-Being bullet point 1 - this objective is supported
Policy S18 Integrated Coastal Zone Management for the Manhood Peninsula : Objective 5 - while the objective is supported it should apply to all Non-Motorised User (NMU) activity. This could best be achieved by ensuring at least one multi-user route is provided around and through developments linked to the existing Public Right of Way (PRoW) and wider access networks.
Design : Policy 20 bullet point 5 - the objective is supported but should recognise that this includes multi-use PRoW for the use and benefit of all.
Planning for Health and Well-being Para 5.9 - this objective is supported but should encourage all NMU activity not limited to walking and cycling.
Transport Infrastructure
Para 5.15 - the inclusion of bridleways is welcomed but there should be specific inclusion of PRoW
Para 5.16 - the wording is misleading as the provision of bridleways on the Coastal Plain is very limited, restricting access for cyclists and equestrians. Upgrading suitable PRoW to bridleways would improve access for all NMUs and contribute to the West Sussex Transport Plan (2011-2016) to improve safety for all road users.
Policy S23 : Transport and Accessibility bullet point 8 - inclusion of PRoW is welcomed
Policy S32: Design Strategies for Strategic and Major Development Sites
Bullet points b, e & g - the aims of these are welcomed but any new routes are linked from new developments to the wider PRoW and access networks
Policy AL1 : Land West of Chichester
Para 4 - this development provides an opportunity to improve access links to the wider access network
Para 10 - there is an opportunity here to provide a multi-user PRoW for all NMUs
Policy AL2: Land at Shopwyke (Oving Parish)
Para 9 - any bridge should be for all NMUs, including equestrians, to reinstate the route severed when the A27 was re-aligned.
Policies AL3 - AL14 - opportunities for the provision of green infrastructure links to the wider countryside within these Policies are welcomed. It is particularly relevant to the Coastal Plain where the current provision of multi-user routes is very limited. Improvements in this area would comply with the objectives of the West Sussex Rights of Way Management Pan 2018-2028.

DM15 Horticultural Development - there is an opportunity within the Runcton area to enhance and upgrade routes for NMUs should the land be used for housing at a later date.
Policy DM23 Green Infrastructure
Para 7.185 - the examples should specifically include PRoW.
Bullet point 4 - more positive wording to recognise the improvement proposals could make to the access networks is preferred.
Policy DM34 Open Space, Sport and Recreation.... - the aim to retain, enhance, enhance access and increase the quantity and quality of PROW and the links to them is supported. This would be of great benefit to all NMUs is all new routes/links are multi-user.