Policy DM35: Equestrian Development

Showing comments and forms 1 to 5 of 5

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2076

Received: 15/02/2019

Respondent: West Sussex County Council

Representation Summary:

It is appreciated why the Plan would wish to require future equine development to be 'well related to or has improved links to the existing bridleway network'. However, this will add to the pressure of use on the existing bridleway network, which is not extensive outside of the South Downs, so will increase degradation of paths. Future developments must, therefore, accept to contribute in some way, acceptable to the local highway authority, to mitigate the additional impact to be created so all lawful users are not disadvantaged.

Full text:

West Sussex County Council Officer Level Response
Introduction
The Chichester Local Plan Review Preferred Approach sets out how the future development in the District will be shaped, excluding the area within the South Downs National Park, up to 2035. It includes the overall development strategy as well as relevant strategic policies to meet the future needs of the area and development management policies to help guide development over the plan period. The Local Plan helps to:
* choose where the development goes;
* protect the character and beauty of the area;
* provide job and housing opportunities so that children can continue to work and live locally;
* support and help to boost the local economy;
* help residents to maintain healthy and active lifestyles; and,
* make sure that there is adequate services, travel options and community facilities.

The Chichester Local Plan was adopted in July 2015. At that time, the Local Plan was approved, but the Government Inspector said that it had to be reviewed again within five years, to make sure that sufficient housing was planned to meet the needs of the area.

The first part of the review process was carried out in June 2017 with an Issues and Options consultation, in which comments were invited regarding the overall development strategy and possible development locations. The Local Plan Review: Preferred Approach is the second stage of the process. It sets out the proposed development strategy and policies for the area to meet future needs.


West Sussex County Council Officer Level Comments
This note sets out West Sussex County Council's (WSCC) officer response to the consultation on the draft Chichester Local Plan Review Preferred Approach. It highlights key issues and suggested changes to which Chichester District Council (CDC) is requested to give consideration. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding WSCC service requirements in order to mitigate planned development.


Minerals and Waste
A steady and adequate supply of minerals and the achievement of sustainable waste management can help to achieve a District or Borough Council's goals in relation to the economy, housing, transport, communications, strategic infrastructure and the environment. Therefore, District and Borough Local Plans should recognise the importance of minerals and waste issues as relevant to the scope of their overall strategies.

We welcome the reference to the adopted Minerals and Waste Local Plans and safeguarding in the document and the requirements in policies where a site is located within a minerals safeguarding area, or near to a safeguarded waste site. There are some missing references to safeguarding of minerals and waste sites for some of the proposed allocations, set out below and request that these references are added. It is also requested that 'Joint' is added into the references for the Joint Minerals Local Plan through the document.

Policy W23 of the Waste Local Plan applies to all Districts & Boroughs, regarding waste management within development and should be referenced in the Chichester Local Plan Review.

AL3 East of Chichester
The site is to the north of the Fuel Depot site allocation in the Waste Local Plan (Policy W10) for a built waste facility as part of a comprehensive redevelopment of the site (including complimentary non-waste uses). The East of Chichester allocation is the land to the north, bisected by the railway line, of the Fuel Depot. Reference should be made to giving consideration to the allocation, and therefore its safeguarding.

AL4 Westhampnett/North East Chichester
Reference should be made to minerals safeguarding, for consistency with other allocations, as within the sharp sand and gravel safeguarding area.

AL5 Southern Gateway
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 200m of the Chichester Railhead.

AL6 South-West of Chichester
Reference should be made to the mineral infrastructure safeguarding policy M10 as within 300m of the Chichester Railhead.

AL7 Highgrove Farm Bosham
Remove reference to minerals safeguarding as the site is not within the safeguarding or consultation area.

AL12 Park Farm Selsey
Reference should be made to minerals safeguarding as site is within the sharp sand and gravel safeguarding area.

Neighbourhood plan allocations
Sites are yet to be allocated though neighbourhood plans. It is considered that the Joint Minerals Local Plan and Waste Local Plan are referenced, particularly with regards to safeguarding policies (M9, M10 and W2) and these documents and policies are given detailed consideration when allocating sites. Development at, adjacent or proximal to existing waste or mineral sites / infrastructure should be the subject to consultation with WSCC.


Connectivity and Sustainable Travel
The County council has worked with the District Council on the preparation of the transport evidence base study undertaken by Peter Brett Associates for the District Council. The recommended transport mitigation strategy, as assessed using the Chichester Area Transport Model has been demonstrated to be capable in principle to prevent the development from resulting in severe residual cumulative impacts on the highways and transport network. However, the recommended strategy has several risks to deliverability and acceptability associated with it, which require further work to be undertaken to demonstrate that the strategy can be implemented in its current form to provide the forecasted mitigation to travel conditions.

There are three locations where new highway alignments are proposed outside of existing highways boundaries. Two of these may include significant earthworks or structures to be delivered, being Stockbridge Link Road and Terminus Road diversion. The cost of the mitigation strategy exceeds a figure which could reasonably be supported by the value of the proposed development developer contributions alone, therefore the delivery of the strategy will depend upon securing of external grant funding to top up developer contributions. WSCC will work with the District Council in supporting and or applying for funding, the District Council needing to secure Highways England to support funding applications for A27 improvements. The proposed junction designs for the A27 Stockbridge and Whyke roundabouts include bans to well used right turn movements off the Chichester A27 bypass which result in significant forecast changes to traffic flows on local roads in the south of Chichester and on the Manhood Peninsular.

There is a need to ensure the land outside the highway boundary is available and the plan should set out how this land will be acquired to deliver the measures, it may be that a commitment to use, if required, and therefore reference to CPO be made in the policy.

Funding for the mitigation strategy is uncertain. It is considered that the Plan should set out how it will deal with this uncertainty. This could include trigger points in the monitoring framework to trigger a change of approach or alternative options to deliver the required development.

These factors mean that feasibility work is necessary to be undertaken prior to Plan submission, to reduce as far as practicable risks to costs, land take, impacts and deliverability of the proposed transport strategy in order to show that the strategy can be implemented within the plan period and that the funding strategy will be sufficient to meet the design requirements. In particular the following will need to be addressed:

* Statutory undertakers equipment under the roads junctions to be impacted.
* Extent of earthworks required to create a vertical and horizontal alignment compliant with design standards. Design audit to identify any required departures from standard.
* Designing for drainage and flooding issues, including compliance with the WSCC LLFA Policy for the Management of Surface Water, November 2018.
* Designs for structures to cross watercourses - Stockbridge Link Road
* Design should include suitable provision for rights of way and footway crossings
* Scoping for whether and at what level further Environmental Impact Assessment will be required.
* Stage 1 Road safety Audit, designers response report and resulting amendments to designs.
* Land take required after feasibility level designs have been developed and availability of required land.
* Wophams Lane - impacts of forecast changes to flow patterns to take B2201 southbound traffic on requirements for highway width, alignment, footway provision and junctions with A286 Birdham Road and B2201 Selsey Road; design solution required.
* Quarry Lane, Kingsham Avenue /Road, Terminus Road; impacts of forecast flow changes on highway users, residential and commercial frontagers and measures to manage through traffic whilst maintaining local access

Sustainable transport measures will also be required to mitigate planned development. These will be identified through more detailed assessments of sites including pre-application consideration. Funding will need to be identified through development and other sources as well in some cases.

Public Rights of Way
There is support for the Local Plan Review's approach to Public Rights Of Way (PROW), not just for the potential to impact on existing public off-road access but also the opportunity it brings to enhance this access for the benefit of future residents, communities and visitors. PROW deliver benefits for personal health and wellbeing; sustainable transport; reduction of air pollution and road congestion; are able to support local economies; and they connect communities.
WSCC PROW welcomes several aspects of the Vision statement, which give support to the protection and enhancement of the PROW network, and provision of safe and convenient off-road access opportunities for residents and visitors:

* Pursue a healthy lifestyle and benefit from a sense of well-being supported by good access to education, health, leisure, open space and nature, sports and other essential facilities;
* Live in sustainable neighbourhoods supported by necessary infrastructure and facilities;
* Move around safely and conveniently with opportunities to choose alternatives to car travel.

The Local Plan Strategic Objectives offer further support to enhance off-road access, particularly to 'Encourage healthy and active lifestyles for all, developing accessible health and leisure facilities and linked green spaces'. However, the objective to 'Achieve a sustainable and integrated transport system through improved cycling networks and links to public transport' should recognise walking also as an important mode for many people; some strategic enhancements will significantly improve walkers' safety and convenience.

It is considered that West of Chichester the A259 could act as a corridor for increased volumes of non-motorised access, particularly cycling. Improvement of the existing on-road facility and development of a various 'feeder' routes to connect with the many settlements, perhaps using quiet lanes in places, would encourage cycling particularly to be a natural alternative to vehicle use. Policy S18: Integrated Coastal Zone Management for the Manhood Peninsula, gives regard to such an ambition in stating it will 'Improve infrastructure to support sustainable modes of transport, especially cycle ways, bridleways and footpaths, including the National Coastal Footpath'.

The National Planning Policy Framework (NPPF) Open Space and Recreation, para 97b) states:
the loss resulting from the proposed development would be replaced by equivalent or better provision in terms of quantity and quality in a suitable location.
The NPPF para 98 also states:
Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks including National Trails.'
There is support for Policy S20: Design, that recognises these requirements in stating development 'is well connected to provide safe and convenient ease of movement by all users, prioritising pedestrian and cycle movements both within the scheme and neighbouring areas and ensuring that the needs of vehicular traffic does not dominate at the expense of other modes of transport, or undermine the resulting quality of places' and 'incorporates and/or links to high quality Green Infrastructure and landscaping to enhance biodiversity and meet recreational needs, including public rights of way'.


Education
As the local education authority, WSCC has the statutory duty to ensure that there is a sufficient supply of suitable school places to meet statutory requirements for early years, primary, secondary and sixth form provision (including up to age 25 for those with special educational needs and/or disabilities). Education infrastructure, or contributions to provide infrastructure, will be required in order to mitigate proposed development. We will continue to work with CDC in preparation of the Local Plan Review and the Infrastructure Delivery Plan regarding education and other service requirements in order to mitigate planned development.

The table below sets out the primary, secondary school and sixth form requirements to mitigate proposed development. SEE ATTACHMENT FOR TABLE

AL1 Land West of Chichester

It should be noted that phase one of this development will provide the primary school with the core of the building being built to the specification for a 2 form entry (FE) school and 1FE teaching accommodation. Phase 2 as per 6.10 on page 93 should include expansion of the primary school for the further 1FE of teaching accommodation.

AL2 Land at Shopwhyke (Oving Parish)

No update to original response for this allocation is required.

AL3 Land East of Chichester - previously South of Shopwhyke

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 1 FE expandable to 2FE and pro rata share of the build costs would be required.

If numbers were to increase on the east side of the city, education provision will need to be reviewed, potentially a further 1FE may be required including land provision, this could be in the form of an expansion or a new school being built capable of expansion to 3FE.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL4 Land at Westhampnett / North East Chichester

The remaining 200 dwellings will impact on the education provision in the area, financial contributions towards expansion of existing or pro rata costs towards the expansion of the school within AL3.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL5 Southern Gateway

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from the strategic allocation of 350 dwellings in the Southern Gateway. However, consideration should be given to the cumulative impact of housing in the area Land South West of Chichester (AL6) to allocate land within the area for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL6 Land South West of Chichester (Apuldram & Donnington Parishes)

It should be noted that the primary education provision in this area is either in Chichester City Centre which means crossing the main A27 or by travelling south towards the peninsula. Consideration should be given to the cumulative impact of further housing in the area along with the Southern Gateway allocation (AL5) to allocate land within the strategic allocation site for a 1FE expandable to 2FE primary school. Pro rata financial contributions towards the build costs would be sought from developers to mitigate their impact.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

At the current time pupil place planning indicates that there would be expansion capacity to accommodate the child product from this proposed development for sixth form pupils. Contributions would be required for expansion of the provision if feasible and required.

AL7 Bosham

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. The strategic allocation of 250 dwellings in isolation does not require a new school to be built. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL9 Fishbourne

The primary school serving the area is currently at capacity, expansion of the school may be possible, feasibility / options appraisals would need to be undertaken.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of primary and secondary schools and sixth form if feasible and required.

AL8 East Wittering

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development.

Contributions would be required for expansion of primary and secondary schools if feasible and required.

AL10 Chidham and Hambrook area

The current primary provision serving the area is at capacity, expansion of the school on its existing site is not possible. As part of the strategic allocation, it is proposed that land for a 2FE primary school be provided. Certainty over the land allocation and sufficient funding will be key drivers in realising this proposal.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL11 Hunston

Any development within this area cannot currently be accommodated in the existing primary school at North Mundham. Further capacity would be required to accommodate the development, CDC will need to work with WSCC to determine how additional capacity in the area could be accommodated if land is to be allocated.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

AL12 Selsey

Further capacity would be required to accommodate the development. Contributions (and possibly land if required) would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools if feasible and required.

AL13 Southbourne

At the current time pupil place planning indicates that there is insufficient space within the primary schools that serve this proposed development. Further capacity would be required to accommodate the development. Land for a 2form entry expandable to 3FE primary school and pro rata share of the build costs would be required.

AL7, AL10 and AL13 are all within the same school planning area, the cumulative total of the strategic allocations brings forward a requirement for c3 forms of entry additional school places. The Local Plan, as currently drafted, indicates an oversupply of school places which could affect the viability of all the schools in the planning area.

Expansion of the secondary school may be possible. Contributions would be required for expansion of secondary schools if feasible and required.

AL14 Tangmere

The current allocation of 1,300 dwellings will bring forward the requirement for land for a 1FE expandable to 2FE and financial contributions would be sought to meet the pupil product from the development in the most appropriate form once this can be clarified.

At the current time pupil place planning indicates that there would be sufficient space or expansion capacity to accommodate the child product from this proposed development for secondary aged pupils. Contributions would be required for expansion of secondary schools and sixth form if feasible and required.

Footnote: - if all of the proposed sites were to come forward the secondary school and sixth form provision would be full in the Chichester Planning Area. Expansion of the secondary schools in the Chichester Planning Area to cater for the increased demand would need to be sought from the academy sponsors, where appropriate and the Local Authority.


Lead Local Flood Authority
The Lead Local Flood Authority (LLFA) is concerned about the approach being taken with regard to ensuring potential wastewater treatment for proposed new sustainable development.

Paragraph 8 of the NPPF states:
8. Achieving sustainable development means that the planning system has three overarching objectives, which are interdependent and need to be pursued in mutually supportive ways (so that opportunities can be taken to secure net gains across each of the different objectives):

a) An economic objective - to help build a strong, responsive and competitive
economy, by ensuring that sufficient land of the right types is available in the
right places and at the right time to support growth, innovation and improved
productivity; and by identifying and coordinating the provision of infrastructure;

Paragraph 20 of the NPPF states:
20. Strategic policies should set out an overall strategy for the pattern, scale and quality of development, and make sufficient provision for:
a) housing (including affordable housing), employment, retail, leisure and other commercial development;
b) infrastructure for transport, telecommunications, security, waste management, water supply, wastewater, flood risk and coastal change management, and the provision of minerals and energy (including heat);

In the LLFAs view, the Local Plan Review is not setting out an overall strategy for the pattern, scale and quality of development in relation to arrangements for wastewater management. The LLFA considers that CDC needs to go further in incorporating within the Local Plan Review how this provision is being made.


Additional Policy Comments

Policy S12: Infrastructure Provision
Support the requirement that all development must provide or fund new infrastructure, facilities and services required, both on and off-site (including full fibre communications infrastructure) as a consequence of the proposal. The explicit reference to full fibre communications infrastructure is supported as this will provide gigabit-capable and future-proofed services to all development, existing and new. The reference to provision of facilities and services on and off-site is also supported as in the case of broadband for example, all development will be adequately equipped with the necessary infrastructure installed for the purposes of connecting to full fibre gigabit-capable broadband services. This policy supports the County Council's aim for increased digital infrastructure that will provide for gigabit-capable broadband and future technologies such as 5G.

Support the reference to safeguarding educational facilities under section 3 of the policy.

The policy includes the requirement to 'Facilitate accessibility to facilities and services by a range of transport modes'. PROW can offer vital access means for walkers and cyclists, such as for employment land use (e.g. commuting by bicycle) and in support of the high street, both for employees and customers. IT is considered that this Policy, also Policy S13: Chichester City Development Principles, should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.

The supporting text, paragraph 4.81 makes reference to the Strategic Infrastructure Package (SIP). It is requested that this wording is removed and replaced with West Sussex County Council identifies service infrastructure requirements necessary to support new and existing communities, where strategic development and growth is proposed in Local Plans. These are required to deliver the County Council's statutory responsibilities, strategic objectives and current policy and feed into the preparation of the Infrastructure Delivery Plan.


Policy S13: Chichester City Development Principles
This policy, like policy S12, it is considered should aim to encourage such access to be the natural and preferred modes of access, thereby helping achieve the benefits previously described. It is noted Policy S14: Chichester City Transport Strategy, does acknowledge cycling and walking and lends support to their improvement.


Policy S23: Transport and Accessibility
The policy and supporting text paragraphs 5.15 - 5.33 refer to Transport Infrastructure. Understandably much consideration is given to the A27 around Chichester; however, in addition to seeking new infrastructure from new development, it is recommended support in principle is given to maximising the value of existing infrastructure so as to facilitate off-road user modes accessing either side of the A27.


S24: Countryside
Supporting text paragraphs 5.34 - 5.43, acknowledges 'it is necessary to provide for the social and economic needs of small rural communities, and enable those who manage, live and work in the countryside to continue to do so'. It is recognised in para 7.205, supporting text to policy SM35 Equestrian Development, the high numbers of liveried and stabled horses. A considerable network of businesses are supported by such a high equine population, and in addition to financial value within the local community there is considerable benefit in terms of health and wellbeing of individuals. It is suggested that Policy S24: Countryside, could recognise this specifically.


S27: Flood Risk Management
Supporting text paragraph 5.54, requested amendments underlined - as a consequence of the rise in sea levels and storm surges, parts of the plan area will be at increased risk from coastal erosion, groundwater, fluvial and/or tidal flooding. Hard defences may not be possible to maintain in the long term, therefore development needs to be strongly restricted in areas at risk to flooding and erosion, whilst ensuring that existing towns and villages are protected by sustainable means that make space for water in suitable areas. Development must take account of the policies of the relevant shoreline management plan

Supporting text paragraph 5.58, requested amendments underlined - Built development can lead to increased surface water run-off; therefore new
development is encouraged to incorporate mitigation techniques in its design, such as permeable surfaces and Sustainable Drainage Systems (SuDS). Where appropriate, SuDS should be used as part of the linked green infrastructure network to provide multiple functions and benefits to landscape quality, recreation and biodiversity. This can be achieved through habitat creation, new open spaces and good design. SuDS should be designed to help cope with intense rainfall events and to overcome any deterioration in water quality status. In determining the suitability of SuDS for individual development sites, developers should refer to guidance published by the Lead Local Flood Authority (LLFA): West Sussex LLFA Policy for the Management of Surface Water: https://www.westsussex.gov.uk/media/12230/ws_llfa_policy_for_management_of_surface_water.pdf and, if necessary, seek further advice from the Lead Local Flood Authority LLFA.

S27 policy text requested amendments underlined for section 1 - a. through a sequential approach, taking into consideration all forms of flooding, it is located in the lowest appropriate flood risk location in accordance with the NPPF and the Chichester Strategic Flood Risk Assessment (SFRA); and

S27 policy text requested amendments underlined for section 2. Sustainable drainage systems (SuDS) will be required on major developments (10 or more dwellings or equivalent) and encouraged for smaller schemes. SUDS should be designed into the landscape of all new development and should be included as part of a District wide approach to improve water quality and provide flood mitigation. A site-specific Flood Risk Assessment will be required for sites within or adjacent to areas at risk of surface water flooding as identified in the SFRA. There should be no increase in either the volume or rate of surface water runoff leaving the site.

S27 policy text requested additional bullet point as number 4 - Clear management arrangements and funding for their ongoing maintenance over the lifetime of the development should be proposed. Planning conditions and / or obligations will be used to secure these arrangements.

S27 policy text requested amendments underlined for section 2, but would be section 5 - Development should not result in any property or highway, on or off site, being at greater risk of flooding than the 1 in 100 year storm return period, including an allowance for climate change.


Policy S29: Green Infrastructure
The Green Infrastructure policy is welcomed, including provision of new Green Infrastructure as an integral part of the development at Strategic Development Locations. It is recommended that measures are put in place to secure the long term management of such Green Infrastructure.


Policy S30: Strategic Wildlife Corridors
The identification of Strategic Wildlife Corridors and inclusion of a policy to safeguard them from development is welcomed. It is recommended that CDC promotes positive conservation management within these corridors to maximise their contribution to maintaining and enhancing biodiversity. As stated in Section 5.66, 'These corridors do not stop at the plan area boundaries.' Thus, it is recommended that CDC works in partnership with Chichester Harbour Conservancy and The South Downs National Park Authority to ensure that these Strategic Wildlife Corridors continue to provide effective corridors and connectivity across the wider landscape.

Section 5.66 refers to four Strategic Wildlife Corridors connecting Chichester Harbour with the South Downs National Park but it is noted that there is no mention of the Strategic Wildlife Corridors to the east of Chichester which connect Pagham Harbour with the South Downs National Park (as seen in Policy Map S30b). It is also noted that the maps referred to in Section 5.66, Maps 5.1 & 5.2 are missing.

WSCC and CDC promoted a Mitigated Northern Route for the A27 at Chichester as the preferred option, subject to the inclusion of important mitigation measures that are needed to make the scheme acceptable in environmental terms and the 'full southern route' as a reasonable alternative. Both routes could impact on the identified Strategic Wildlife Corridors. As currently drafted, Policy S30 would seem to prevent a mitigated northern route from coming forward in the future. Therefore, the District Council should consider whether the policy is overly restrictive (for example should it refer to 'significant adverse impacts' or 'unacceptable adverse impacts'?) and how it would be applied if a northern route for A27 were to come forward in the future.


Policy S31: Wastewater Management and Water Quality
S27 policy text requested amendments underlined for section 3, this - Where appropriate, development should contribute to the delivery of identified actions to deliver infiltration reduction across the catchment. Where appropriate development should contribute to the delivery of identified actions to deliver a reduction in the level of infiltration of groundwater into the sewer system.


Policy AL1: Land West of Chichester
AL1 policy text requested additional bullet point as number 8 - Increase capacity to attenuate surface water on site, thereby reducing the discharge flows off the site below current rates and reducing the risk of flooding to residential areas downstream.

AL1 policy text requested additional bullet point under 15 as 15 b- Provide mitigation for any loss of watercourse habitat resulting from culverting for highway provision in the development;

AL1 policy text in supporting 'improved cycle and pedestrian routes linking the site with the city, Fishbourne and the South Downs National Park', a new key link for cycling will be to Salthill Road, thereby enabling cyclists to benefit from the existing bridge crossing of the A27 for journeys to and from the west.


AL2: Land at Shopwyke (Oving Parish)
The policy acknowledges need 'for foot/cycle bridge across A27 to Coach Road'. There is also need for equestrian users to cross the A27 and WSCC PROW has received several enquiries seeking support for such infrastructure. Consideration could be given to the proposed bridge providing for all three modes.


AL3: East of Chichester (Oving Parish)
AL3 supporting text requested amendments underlined for paragraph 6.22 - The site is identified for 600 dwellings, however, there may be potential to deliver a large strategic development of 1000 dwellings, subject to further evidence, including the testing of additional growth on the local highway network and capacity of the site to provide flood risk attenuation for the increased housing density. The site should be master planned as a whole, and delivered through a phased development over a ten year period. Although the site is physically separated from the city by the A27 Chichester Bypass, the development should form a planned extension to the city, forming a new neighbourhood. This will involve opportunities to provide new facilities to serve the wider local community with good off-site access, particularly by walking and cycling to existing local facilities and facilities in the city.

AL3 policy requires exploring integrated green infrastructure with other strategic sites to the north east of the city, Tangmere and the wider countryside. It is considered that future residents will have expectations for provision of safe and convenient links towards Oving and also across the railway to link to the A259 cycle path and PROW south of the A259. It is considered that the policy should be strengthened to ensure such provision.


Policy AL4: Land at Westhampnett/North East Chichester
AL4 policy text requested amendments underlined for section 3 - Open space and green infrastructure, including a linear greenspace with public access along the Lavant Valley.

Taking into account the site-specific requirements, proposals for the site should satisfy the following requirements:

Policy AL4 policy, it is welcomed that 'provision should be made for green links to the South Downs National Park and Chichester City.' Safe and convenient walking and cycling to Lavant, from where people will access the South Downs, will provide for sustainable transport use.


Policy AL5 Southern Gateway
AL5 supporting text requested amendments underlined for paragraph 6.38 - The area has been identified as suitable for comprehensive regeneration with the aim being to make it a more attractive and welcoming gateway for the city, providing new housing, business and retail space and leisure and tourism facilities. Opportunities will be identified to improve transport links with a focus on cycling, walking and public transport and the removal of non-essential traffic from the area. There is also scope for significant public space enhancements and new landscaping incorporating blue / green infrastructure delivering multi-functional benefits.

AL5 policy text requested amendments underlined for section 5 - Provision of open space that:
* Is in accordance with Policy DM34, including retention of the existing playing pitch unless suitable re-provision is provided;
* Reinforces / enhances green and blue infrastructure consistent with Policy S29 and fully exploits the opportunities for sustainable drainage.


AL5 policy text requested amendments underlined for section 8 - Provision of both a surface and waste water management plan which demonstrates no net increase in flow to Apuldram Waste Water Treatment Works would result from this development, unless suitable alternative provision is agreed;


Policy AL6: Land South-West of Chichester (Apuldram and Donnington Parishes)
The LLFA has concerns regarding the lack of reference to flood risk constraints of the site in Policy AL6. There is reference to flood risk in paragraph 6.47. However, the policy itself makes no reference to these constraints.
The constraints arise from a combination of the following:

* Current tidal /fluvial flood risk extending from Chichester harbour to the west and up the River Lavant floodplain; (Map 1)
* Future tidal /fluvial flood risk associated with climate change; (Map 1)
* Constraints on infiltration of surface water run off because of high seasonal groundwater levels (<0.025m below the surface) (Map 2); and
* Constraints on gravity outfalls because of the low relief and long-term reduction in tidal window for discharge.

The above limits the options for how the site can be effectively drained without a step change from typically employed methods to embrace more innovative and currently expensive options e.g. blue roofs and rainwater harvesting.

The LLFA recommends that the policy sets out both the above constraints and the type of innovative drainage that will be required to achieve the development objectives for the site.



Key: Projected medium projection extent of SLR based upon 4m contour

AL6 extent

Current Flood Zone 3 extent.

Current Areas of high (1:30) surface water flood risk

Map 1 Existing and projected Tidal and surface water flood risk for AL6.

Consistent with paragraph 3.2 of the SFRA, given the high risk of flooding both now and into the future for this site, it is recommended that CDC gives consideration to the climate change maps to understand how the flood zones are predicted to change over the lifetime of the development.


Key:
AL6 boundary.

Groundwater levels are either at very near (within 0.025m of) the ground surface.

Groundwater levels are between 0.025m and 0.5m below the ground surface

Map 2 Groundwater flood risk JBA

Policy AL6 WSCC PROW considers 'necessary highway improvements to adequately mitigate the likely impacts on the highway network' to include a bridge crossing of the A27 for convenient walking and cycling access to the Terminus Road industrial estate and the city. There is an existing public footpath but, as this crosses the A27 at-grade, this will not provide the safest facility and not encourage people to minimise use of vehicles for local access. Provision of a bridge and access through the site could also establish a valuable link to the popular Salterns Way walking and cycle path. An additional link to Salterns Way should also be provided off the A286 for the benefit of Stockbridge residents as a safer alternative to the A286.


AL 7 Highgrove Farm, Bosham
The LLFA notes that the above site has the potential for a moderate risk of groundwater flooding. It is likely that this is perched groundwater draining from higher ground / springs to the north that lies in the superficial mixed sediments underlain by Lambeth Clay.


Policy AL8: East Wittering Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'Opportunities ... for the expansion and provision of green infrastructure into the wider countryside including between settlements and facilities'. Existing and future residents and the local visitor economy would benefit by delivery of an off-road route for walkers, cyclists and horse riders to and from the Medmerry development and towards Selsey. It is considered that Policy AL8 should aim to deliver this enhancement specifically.


Policy AL9: Fishbourne Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

It is considered that off-road cycling links to land West of Chichester (off Salthill Road) and to Bosham (off Park Lane) would benefit this community with enhanced sustainable connectivity.


Policy AL10: Chidham and Hambrook Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The policy requires 'opportunities' to develop green infrastructure and links to other communities. An opportunity, in conjunction with Highways England, exists to maximise the value of existing infrastructure by creating a new bridleway (for walkers, cyclists and horse riders) on a path using an existing A27 overbridge.


Policy AL11: Hunston Parish
Due to no information on where housing is going to be located so the LLFA is not in a position to comment on proposed housing allocation sites at this stage.

The village is already well connected for walkers to access the surrounding countryside but there are presently no local cycling or horse riding facilities on the PROW network. A bridleway link to South Mundham (with the potential for future cycle links to Pagham and towards Bognor Regis) and to Sidlesham via the golf course and Brimfast Lane would provide residents and visitors with improved access to the countryside and services.


Policy AL12: Land North of Park Farm, Selsey
It is unclear why the policy map shows the proposed strategic allocation lies outside of the Neighbourhood Plan proposed settlement boundary. Some explanation for this anomaly would be helpful in the text.


Groundwater flood risk as depicted by JBA mapping (Brown = seasonal groundwater level lies between 0.025 and 0.5m below the surface).

The principle concern that the LLFA wishes to highlight is the need to ensure that the necessary foul sewerage infrastructure to support development is in place. It is the LLFA understanding that the Siddlesham WWTW experiences capacity issues currently, in part exacerbated by groundwater infiltration. While Policy AL12 states: Development proposals will need to demonstrate that sufficient capacity will be available within the sewer network, including waste water treatment works, to accommodate the proposed development in accordance with Policy S31.

The policy proposes only to provide 'pedestrian links between the site and new development south of Park Lane'. It is considered that cycling links should also be provided.


Policy DM8: Transport, Accessibility and Parking
The PROW network can provide vital means for communities to interact and encourage sustainable local access. The policy requirement to create 'links between new development and existing pedestrian, cycle and public transport networks' is welcomed. However, establishing links into surrounding existing development should not be overlooked also - the greater the permeability, the greater the use.


Policy DM10: New Employment Sites
Whilst mentioned earlier in the Plan in respect of a number of specific sites, this policy should specifically aim to provide, as a matter of course, suitable walking and cycling infrastructure to encourage local sustainable access. This infrastructure may need to extend outside a site boundary so as to provide safe and convenient connection to existing infrastructure. This principle should apply also to Policy DM13: Built Tourist and Leisure Development and Policy DM14: Caravan and Camping Sites.


Policy DM32: Green Infrastructure
Whilst it is recognised the policy proposes support subject to not 'dissect[ing] ... the linear network of cycle ways, public rights of way, bridleways ...', the policy could lend support to establishing new routes as part of the Green Infrastructure network itself.


Policy DM35: Equestrian Development
It is appreciated why the Plan would wish to require future equine development to be 'well related to or has improved links to the existing bridleway network'. However, this will add to the pressure of use on the existing bridleway network, which is not extensive outside of the South Downs, so will increase degradation of paths. Future developments must, therefore, accept to contribute in some way, acceptable to the local highway authority, to mitigate the additional impact to be created so all lawful users are not disadvantaged.


Policy DM29: Biodiversity
The measures to safeguard and enhance the biodiversity value of development sites are welcomed, including seeking net biodiversity gain.


Schedule of proposed changes to the policies map
S30a West of City Corridors -suggest title should be West of City Strategic Wildlife Corridors (to match S30b: East of City Strategic Wildlife Corridors. The Strategic Wildlife Corridors are depicted in different colour patterns on the two plans which is somewhat confusing.


Strategic Wildlife Corridors Local Plan Review Background Paper
Proposed Hermitage to Westbourne Strategic Wildlife Corridor
A large area depicted as Biodiversity Opportunity Area (BOA) in Fig. 1 (immediately to the south of the Rivers Ems & Meadows Local Wildlife Site, Westbourne) is in fact housing and forms part of the settlement of Westbourne. You should consider if this land should be included as having potential for biodiversity enhancement.


Glossary
Includes Sites of Nature Conservation Importance (SNCIs) but not Local Wildlife Sites (LWSs). SNCIs are now known as LWSs.

Attachments:

Support

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2322

Received: 07/02/2019

Respondent: Portsmouth Water Ltd

Representation Summary:

Policy DM35 'Equestrian Development' can have a direct impact on water quality including groundwater quality. Portsmouth Water support the protection of water courses and aquifers.

Full text:

Spatial Vision
Portsmouth Water note that there are significant additional housing allocations to the west of Chichester and on the coastal strip. These sites will need to be assessed for water supply and funding included in the Infrastructure Charging scheme. (See Map 4.1 Key Diagram)

It is not clear what water storage capacity is being referred to in Section 3.19. Portsmouth Water will review the provision of Service Reservoirs, for day to day use, and has re-started development of a large raw water storage reservoir at Havant Thicket. The reservoir, when combined with Portsmouth Water's existing sources and enhancements to its groundwater sources, would create sufficient
surplus to support an additional flexible daily transfer of treated water from Portsmouth Water are to Southern Water without detriment to Portsmouth Water's resilience.

Southern Water requires this transfer to help meet a significant deficit in its Southampton East, Southampton West and Isle of Wight resource zones. This deficit arose after Southern Water agreed to reduce its abstraction licences on the Rivers Test and River Itchen at a public inquiry in March 2018, to help protect the environment.

It is not clear that the water demands of the Horticultural Development Areas have been assessed. It is possible that these businesses will rely on rainwater harvesting and storage but changes in licencing regulations mean that 'Trickle Irrigation' is no longer exempt from abstraction licencing.

Groundwater abstraction in the coastal plain will require an impact assessment under the Habitats Regulations. (Section 4.75)

Spatial Strategy

Policy S12 sets out how development can make effective use of existing infrastructure. Portsmouth Water agree that the siting and timing of development can assist with the economic provision of water resource infrastructure. It also states that safeguarding existing infrastructure, such as water mains and aquifers, is important. Portsmouth Water would urge developers to check for existing infrastructure and for source protection zones that may limit development options.
Water infrastructure is not funded through CIL but a separate 'Infrastructure Charge' payable for each individual house. This is designed to pay for all off-site water infrastructure such as mains reinforcements, service reservoirs and supply. Development to an agreed program will help this system work effectively.

Strategic Policies

Policy S27 'Flood Risk Management' refers to Sustainable Drainage Systems (SuDS) and the need to control surface water run-off. It should also refer to aquifer protection and the need for caution when using infiltration systems especially deep bore systems. This applies particularly when the site is in, or close to, a source protection zone.

Policy S31 'Wastewater Management and Water Quality' refers to higher standards in the Building Regulations for water consumption to reduce pollution in the harbours. Portsmouth Waters 'Water Resources Management Plan' is based on lower per capita consumption and we have an aspiration for all customer to reach 100 litres/head/day by 2050. This is no substitute for reducing overall flows
to sewage treatment works by the control of groundwater infiltration and surface water drainage.

Strategic Site Allocations

Policy AL1 'West of Chichester' does not mention water supply so we assume that the site has reverted to a conventional system with sewerage pumped to Tangmere WWTW and water supplied by us. Portsmouth Water has provided provisional designs for this system and there are no existing large diameter water mains on the site. Costs for reinforcement of the water mains will be recovered by the new Infrastructure Charge and on site mains are likely to be provided by a third
party. Information on how reinforcement of the water mains is recovered by the Infrastructure Charge can be found in Portsmouth Water's Developer Charging Arrangements on our website under https://www.portsmouthwater.co.uk/developers/.

Policy AL2 'Shopwyke' is already under construction and has a conventional water supply system with all elements provided by us. Costs are being recovered via the Infrastructure Charge and on-site charges.

Policy AL3 'East of Chichester' is a new strategic site and there are no large diameter mains crossing it. This is an old landfill and may contain material that can damage plastic pipes. On site mains may need to be protected or be more expensive to ensure water quality is maintained.

Policy AL4 'Westhampnett' Phase 1 is already under construction and account has been taken of the large diameter main that crosses the site. Phase 2 is an extension of the existing Greylingwell site but it is not clear if this has been allowed for in the design of this 'Inset Appointment'. Portsmouth Water do not own the mains and there may be a single point of supply.

Policy AL5 'Southern Gateway' is an inner city development with a good water supply system. The reference to the 'efficient use of water' is confusing because many of the other strategic development sites also drain to Apuldram WWTW. All sites need to be water efficient but not follow the example of the 'Code for Sustainable Homes'. Sites were developed in Chichester that used rainwater harvesting to meet the Code objectives but were able to use higher water use fittings such as power showers. This led to properties producing more sewage than equivalent water efficient homes. This did not achieve the objective at Apuldram. An alternative provision might be to reduce infiltration but it is not clear how this would be funded or who would carry out the work.

Policy AL6 'South West Chichester' is crossed by a large diameter main that will have to be reflected in the road layout or diverted. The proposed link road may offer an alternative route for the main.

Policy AL7 'Bosham' is situated on the old A27 and there are no large diameter mains in the area.

Policy AL8 'East Wittering' is at the extremity of the distribution system and may be expensive to supply.

Policy AL9 'Fishbourne' allocation is not site specific and it is difficult to comment on the feasibility of water supply. Any off site costs will be recovered via the new Infrastructure Charge. Portsmouth Water have public water supply abstractions in the area and development is likely to be located in a source protection zone for our Fishbourne public water supply abstraction. Under this policy, where development is in a source protection zone, the policy should also refer to groundwater quality
protection and the additional requirements when using infiltration systems in particular deep bore systems. Further guidance on Portsmouth Water's preferred approach to development relating to groundwater quality within our catchments can be found within 'Portsmouth Water's Groundwater Protection Guidance notes' which are attached to this response and also available to view on our website under https://www.portsmouthwater.co.uk/developers/groundwater-protection/.

Policy AL10 'Chidham and Hambrook' is a large site and may need to be considered in combination with 'Southbourne' and 'Bosham'. There are no large diameter mains in the area and mains reinforcements may be required.

Policy AL11 'Hunston' allocation is not site specific.

Policy A12 'Selsey' is at the extremity of the distribution system and has seen previous housing growth. Reinforcement of the water mains may need to be provided.

Policy AL13 'Southbourne' is supplied from a different distribution system to Chichester. This is a very large housing allocation and this may need to be considered in combination with 'Hambrook' and 'Bosham'. There are sufficient water resources for all the housing allocated to Portsmouth Water's area of supply. It is the location of the housing site in relation to existing trunk mains and
service reservoirs that determines the cost to supply. Local reinforcement of the water mains may be required.

Policy AL14 'Tangmere' housing allocation has increased by 30% and we may need to repeat the modelling that has already been done. There is also uncertainty about the water supply to the HDA which seems to rely on rainwater harvesting for future growth. The housing development and the HDA could have an impact on our source protection zone. Under this policy, where development is in a source protection zone, the policy should also refer to groundwater quality protection and the
additional requirements when using infiltration systems in particular deep bore systems. Guidance should be sought from Portsmouth Water's Groundwater Protection Guidance for development.

Policy AL15 'Land at Chichester Business Park, Tangmere' Portsmouth Water have public water supply abstractions in the area and the site allocation is likely to be within a source protection zone for our Aldingbourne public water supply abstraction. As above, where development is in a source protection zone, the policy should also refer to groundwater quality protection and the need for caution when using infiltration systems in particular deep bore systems. Please refer to Portsmouth Water's Groundwater Protection Guidance for further information.

Development Management

Policy DM10: 'New Employment Sites' Development proposal should be compatible with other policies in the Plan, in particular DM9 'Existing Employment Sites' to ensure that the development is otherwise acceptable. Policy DM9 states that development should 'not generate unacceptable levels of water pollution' and this should include groundwater pollution. This requirement should also be applied to Policy DM10, especially when the site is in, or close to, a source protection zone.

Policy DM15 'Horticultural Development' Developments at Tangmere HDA have relied on infiltration to dispose of excess surface water. This policy states that development should 'not generate unacceptable levels of water pollution' and this should include groundwater pollution. Portsmouth Water have public water supply abstractions in the area and the potential impacts must be assessed for any SUDS. The EA 'Abstraction Licencing Strategy' (ALS) may give an indication about the
availability of groundwater but it does not cover the derogation of existing supplies.

Policy DM16 'Sustainable Design and Construction' covers the use of Building Regulations to control water use. Portsmouth Water have an aspiration to reduce overall water use to 100 litres/head/day and this policy will help to achieve that aim.

Policy DM18 'Water Management' using SUDS needs to take account groundwater quality and should avoid direct infiltration into the chalk aquifer. This is especially important within the source protection zones.

Policy DM29 'Biodiversity' Portsmouth Water has legal duties to protect and where practical enhance biodiversity and has an active program of work on it's own land. This work is now expanding to include projects on other people's land in association with 'Catchment Management' activities. We would look to CDC for support in areas such as Bosham Stream, Lavant Stream and Fishbourne Stream where schemes could be developed in partnership with local housing developments.

Policy DM35 'Equestrian Development' can have a direct impact on water quality including groundwater quality. Portsmouth Water support the protection of water courses and aquifers.

Appendix 'E' Monitoring Framework

Policy S12 covers the provision of infrastructure but it is not clear how records of completed projects will be collected or stored.

Policy S26 covers biodiversity improvements and Natural England should be consulted on priorities and record keeping.

Policy S31 covers water consumption which is only available for the whole Company area in the WRMP Annual Review.

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2536

Received: 06/02/2019

Respondent: Sidlesham Parish Council

Representation Summary:

Concerns over high level equestrian related development on the Peninsula, especially on the settlement boundary margins, within the ex LSA estates, and associated with gypsy sites. Much of this development is often deemed as "agricultural use" when it is really a "change of use". The use for "horse culture" often removes high quality land form agricultural/ horticultural use, despoils the land creating a strong visual intrusion often close to residential areas.

Seek clarity - true recreational nature of horsekeeping and how often large numbers of horses kept on a small acreage might be exercised.

Full text:

INTRODUCTION - strategic and local importance of A27 improvement

The PC is concerned that the strategic context of the Plan, whilst making reference to the importance of the A27 trunk road, fails to realise the impact of the lack of the implementation of a scheme has on the future sustainability of new development proposed, let alone the completion of those proposed under the current plan.

Reliance on S106 and CIL contributions to mitigate, for instance increased traffic, will have little impact on alleviating the problem that the current A27 represents to communications and, importantly, the city of Chichester's future economic viability.

The plan makes little attempt to future proof Chichester and its hinterland with its continued reliance on relatively low paid employment in tourism, horticulture and areas such as retail.
The Coastal West Sussex and Gt Brighton Local Strategic Statement makes strong reference to the
Inter-relationship between the Bognor Regis northern bypass on the A259, the Arundel bypass and the A27 improvement at Chichester - the impact of these two schemes on Chichester, already apparent at the Bognor roundabout, could be catastrophic congestion.

Comments on Main policies.

S4 Meeting housing need

The Manhood Peninsula is expected to deliver 1993 units during the Plan period. Of this figure, 600 are in Selsey, East Wittering and Hunston, 175 as parish housing requirement in Birdham and North
Mundham. It is not clear what proportion of the residual 1208 fall into the category planning permissions, committed or made as of 2017 and what are expected to be small windfall sites.
Without this breakdown the potential impact on parishes such as Sidlesham, that are deemed unsustainable for housing, cannot be assessed. This is particularly important in Sidlesham where, due to prior consent approvals through the conversion of agricultural / horticultural buildings there is potential for 100 plus new units. This potential that would appear to be categorised as "windfall" obviously does not fit the definition, especially as to date (32 approvals in Sidlesham and Earnley), none are social housing but all are full market and some, costing £600k, are beyond any prospect of meeting the needs of first time buyers. The parish considers the majority of the conversions inappropriate and the potential scale of the number of conversions challenges the District's sustainability definition that is well founded for the parish. Whilst the Parish Council appreciates that the guiding legislation stands outside the local plan process, the potential distortion the developments, which are essentially on the ex Land Settlement Estate, needs to be specifically addressed in the local plan. Additionally, there are implications for policies S11 and DM15.

S6 Affordable Housing, DM4 Affordable Housing Exception Sites (S12 Infrastructure Provision)

The policy and supporting text gives too great a flexibility to developer, especially in terms of the economic viability of development. The renegotiation by developers of the proportion of social housing post original consent appears to have characterised many developments arising from the existing plan and consents that were granted prior to its approval. The fact that the plan seeks to control the artificial sub division of sites to avoid the social housing "trigger" gives a strong indication of many volume builders' reluctance to truly engage in meeting the true scope of overall housing demand. Whilst the hybrid of shared ownership meets a particular aspect of overall demand, it fails to address the increasing necessity of proper social housing. The true economic viability of sites needs rigorous independent assessment and, if not viable as market led development, the appropriateness of the site for development should be reassessed or its consideration for acquisition by, for instance, a community land trust scheme or compulsory purchase to provide social housing should be considered.

Policy S12 is welcomed, but the range of provision to be supported, especially if whole life costs are to be met will place great demands on funding streams such as S106, CIL and other funding streams and there must be doubt as to whether your council's Infrastructure Development Plan can be fully met.

S7 Gypsy and Travellers and Travelling Show People, DM5 Accommodation for Gypsies

It is noted that separate provision is required in the 5yr housing supply for this category. The eligibility for inclusion is that the individual still has an itinerant life style, ie travelling from place to place. Many of the gypsy families/individuals that seem to qualify under this category patently do not exhibit this form of life style. Local experience fully supports this position with gypsy communities simply using their caravan homes as a base to engage in trade, with the site often becoming the builders' type yard for the storage of materials or the waste from their trade. This form of occupation does not distinguish the use from any other individual living in an area and consequently should not qualify for any special recognition; in fact, in many cases such use under normal planning powers would be contrary to policy.

This "special treatment" causes a great deal of resentment in local communities especially where there is a social housing need - that is most areas - and where school places are under pressure.
The qualifying criteria must be fully investigated and a change in status over time reviewed as many sites, originally for itinerate use, simply become settled locations and do not therefore meet the criteria. It seems that the process from itinerant to settled status is a common progression and has the result of the "need" for new pitches continually increasing.

The substantial increase from the 2015 plan requirement to the 90 plus gypsy pitches now identified illustrates how the process is being used to bypass Planning that would restrict the provision of such "housing" if it were built development and that areas become favoured by gypsy communities as other gypsies are already located there and a sub community established. The criteria for assessment of eligibility must be reviewed together with the transition to settled status and additionally the degree to which concentrations of gypsy and other travellers are occurring in specific areas - this is considered to be the case in Sidlesham.

DM6 Accommodation for Agricultural Workers

The reintroduction of this qualifying criteria is welcomed. However, there is a major issue with enforcement and the policy needs to be strengthened to ensure the occupant continues to be employed in agriculture or horticulture. The change away from agricultural/horticultural occupation is often not declared and after the requisite elapse of time, ELD status is applied for. The need to register agricultural/horticultural occupation on an expiry time basis that would exclude qualification under ELD should be considered in the policy and/or the surrounding text. The subdivision of land and the separation of the original accommodation from the land is an increasing aspect of land holding in areas such as Sidlesham. On many sites an agricultural viability assessment is made as to whether a subdivided holding is viable and whether a constant presence on site is required to maintain the use and therefore accommodation required. However, this potential position should be a consideration at the original point of separation and a condition made that the subdivided land should not benefit from a subsequent consent for another house/residential caravan. This subdivision has and continues to be a trait on the ex LSA estate and, particularly within the HDA's, undermines their priority for horticultural production. At least in the HDA's the approval of agricultural worker accommodation should be restricted and perhaps limited to a residential caravan on a temporary consent and not lead to a progression to a permanent building as currently happens.

S11 Horticultural Need, DM15 Horticulture

There appears to be a weakening of the distinction between what in the 2015 Plan were termed
"hub" sites at Runcton and Tangmere and the other HDA sites in Sidlesham and Almodington.
Para 7.92 is particularly troubling ". It is not expected that large scale glasshouse development
(228,000 sq m required) will occur in Sidlesham and Almodington HDA's to the same extent as at
Runcton and Tangmere. The statement introduces doubt over the distinction between large scale industrial type of production and what is termed "market garden" horticulture expected at Sidlesham and Almodington.

The statement about "land adjacent to an HDA" previously related to Runcton and Tangmere. Its extension to Sidlesham and Almodington again introduces doubt over your council's true intentions about the scale of the industry envisaged outside the old hub sites and undermines the strong position it took on large scale such the Madestien proposal in Almodington. Your council stresses the importance of the HDA but continues to allow the break-up of the land within the smaller ones through conversion of buildings to residential and the take of land for gardens under "prior consent" as mentioned above. This approach is contrary to the proposed policy and will lead to further fragmentation and inefficient use of the land that remains. This approach could lead to requests for land outside the current smaller HDA's and bring glasshouse development into conflict with the overall environment. Many of the largest glasshouse developments are outside the HDA's but in established glasshouse areas and lead to the possibility that the HDA's need review and at least two new areas established based on the Fletchers Estate and Jakes Nursery and on Street End Lane. These area are equal or probably exceed production in many parts of the two HDA's.

S23 Transport and Accessibility

The strategic need for a solution to the A27 has already been mentioned but the impact locally cannot be overstressed in respect of the Manhood Peninsula. The high levels of out commuting for employment and many services are all dependent on a functioning A27 and further development in reality can only aggravate a non-functioning situation.

The cul-de-sac position of Selsey presents major problems for the town - the second largest in the district - in terms of emergency services and, for instance, the levels of congestion when heavy domestic traffic flows are combined with the summer tourist traffic that swells the population to approaching four to five times its winter levels. The sustainability of this situation in terms of environmental impact, the economic viability and overall acceptability must be doubtful. This is apparent to the road users but increasingly the areas that the road passes through, such as
Sidlesham, suffer pollution from exhaust emissions, noise, unacceptable delay in access from adjoining roads and properties, just simply crossing the road by pedestrians is made almost impossible as traffic is so often two way with no gaps. This situation cannot be ignored and just allow the road to be loaded with more traffic. The carrying capacity of the B2145 must be seen as a limiting factor in any future development in Selsey. This situation is mirrored on the A286 with The Witterings and Bracklesham.

It will be important that development in Selsey contributes to traffic management on the B2145 and that the whole of the road is eligible for any S106 and CIL contributions and not just the immediate locality of Selsey. The overall intention should be to improve safety, ensure speed is observed and allow safe road crossing. These factors will be considered within the Sidlesham Neighbourhood Plan.

Pollution is an increasing concern and in line with the Plan's policy objectives for greening of the environment, structural tree planting will be proposed within the B2145 corridor. The plan makes reference to sustainable transport but there are no specific proposals. It is suggested that for the Manhood Peninsula the proposed Greenway Selsey to Chichester is part of a specific policy that seeks to protect the adopted route and that Neighbourhood Plans for Hunston, Sidlesham and Selsey then adopt the route into their plans.

S24 Countryside, DM22 Development in the countryside, DM31 Trees, hedgerow and
woodland, DM29 Biodiversity

These policies and accompanying text is supported and will form the basis of Sidlesham's Neighbourhood Plan. Para 5.39 indicates conversions of existing buildings will be favourably considered where they lead to uses needed to support the rural economy and create 'rural affordable housing'. Currently, many conversions do not meet these criteria, especially the latter where often large upper market houses are developed way out of the range of meeting any local social need. The policy needs to reflect this problem with more specific criteria covering what is acceptable within the scope of any conversion.

The identity of the rural areas is an important consideration in maintaining their character if they are not to become just the spaces between larger settlements. This is particularly important on the
Manhood Peninsula and in the countryside associated with the transport corridors of the A286 and
B2145. The open countryside along these routes with their small settlements are in danger of encroachment by development and urbanisation. A specific policy is suggested to protect such areas and enhance their character by schemes of tree planting, improvement to the roadside environment and strong traffic management. Again, this approach will feature in the Neighbourhood Plan.
Whilst it is appreciated that agriculture is currently in a state of uncertainty, a policy that seeks to promote the balance between agricultural production, the environment and amenity would be welcome as a basis for whatever system of agricultural subsidy eventually is formulated. Particular emphasis should be placed on the protection of high grade agricultural land (grade 1 - 3a), biodiversity , and for instance structural tree planting for drainage and co2 reduction. A positive approach to recreational access in support of green tourism should also form part of a strengthened countryside policies.

S25 The Coast, S30 Strategic Wildlife Corridors

The policy makes reference to Chichester Harbour Management Plan but should also make reference to the Pagham Harbour Management Plan - although this currently only covers the period to 2018, the RSPB can be expected to bring forward a new plan for the next 5-10yr period.
The significant changes to the Pagham Spit over a relatively short period of time could have significant impact on the drainage of the harbour and particularly the surrounding land and including the R. Lavant flood relief channel. The importance of the Harbour's drainage function should be reflected in a specific policy that balances the significance of the habitat with the land drainage issues.

The Medmerry Scheme has created a significant change in the coastal geography creating a significant new coastal habitat extending westward from the margins of Pagham Harbour to within a short distance of the edge of Chichester Harbour AONB. An important corridor for wildlife is developing over the short distance between the two and should be considered as a designated area under policy S30.

S27 Flood Risk Management

The plan makes reference to flood risk but does not fully realise its significance to the Manhood
Peninsula and the constraints it places on development, the future of its economy and the resilience of its communities.

Whilst SUDS has its uses in localised drainage it often simply drains an area into a downstream network that has to cope with the additional run off. The Peninsula has an extremely high water table for the majority of the year that makes most soakaway drainage ineffective. An integrated network utilising the existing ditch system and augmenting this with attenuation areas with good clear outlets to the sea must be developed and maintained.

Many new housing developments rely on SUDS but simply only cover the development site. Developers have to be responsible for the water they produce from the point of generation to its disposal to the sea or main river. This should form a requirement of any planning agreement and a policy within the plan should reflect and formalise this responsibility. Realisation of the true infrastructure cost of drainage should be fully reflected in the site evaluation process and its economic viability. The development of many coastal locations or those on flood plain may be proven uneconomic if the real cost for drainage were realised and not the passing on of the problem
downstream as currently occurs.

Reference is made to Surface Water Management Plans. It is the responsibility of the lead strategic flood authority (in this case WSCC) to produce and maintain these plans. As a material consideration there should be policy and text to ensure the plans are kept up to date and that priorities identified in plans are brought forward for action and funding such as CIL directed to their implementation.

S31 Wastewater Management and Water Quality

Southern Water needs to have information on future demand foul drainage - detailed discussions with SW have shown that the levels of development known to them, especially in respect of
Sidlesham Waste Water Treatment Works, do not appear to reflect the development levels and question the capacity of the facility. Additionally, the size and overall functioning of the pipe network is very troublesome, for example, the "trunk main" from the Witterings. It would appear that calculations are primarily based on dry flow rates where much of the pre 1960's housing on the
Peninsula has mixed drainage and the foul system suffers from ground water inundation. The Parish requests that a clear reappraisal of the wastewater capacity of SWWTW and of the network is made and the infrastructure costs of a system that has the required headroom and a network that will support existing and any new development is made and factored into the plan.

DM35 Equestrian Development

The parish is concerned about the high level of horse related development that is occurring on the
Peninsula, especially on the settlement boundary margins, within the ex LSA estates, and associated with gypsy sites. Much of this development is often deemed as "agricultural use" when it is really a "change of use" as the livestock are not supported by grazing of the land. The use for "horse culture" often removes high quality land form agricultural/ horticultural use, despoils the land creating a strong visual intrusion often close to residential areas. The Plan policy should ensure that the change of use is properly applied and enforced. Clarity should also be sought as to the true recreational nature of much of the horse keeping and as there is no bridleway network on the Peninsula how often large numbers of horses kept on a small acreage might be exercised.

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2829

Received: 07/02/2019

Respondent: Sussex Wildlife Trust

Representation Summary:

Due to the often rural nature of Equestrian Development, we propose an amendment to bullet point 4 of the policy to ensure potential impacts to biodiversity are captured

Full text:

See attachment

Attachments:

Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 2986

Received: 07/02/2019

Respondent: Plaistow And Ifold Parish Council

Representation Summary:

It is accepted that large equestrian businesses do provide some rural employment, often at minimum wage. However the Parish Council is concerned that this Policy provides no protection for and retention of viable agricultural land and farm units, meeting the need for food production. This rural Parish has seen the loss and break up of a number of farm units arising from change of use to equestrian and pressure for further associated development.

Full text:

See attachment