Comment

Local Plan Review: Preferred Approach 2016-2035

Representation ID: 564

Received: 29/01/2019

Respondent: Mr Richard Openshaw

Representation Summary:

This is a large document, so perhaps I have missed this part: What is the policy regarding asking Network Rail to invest in 21st Century signalling systems to improve delays at the Level Crossings in Chichester. These cause unacceptable delays to traffic, and works on the A27,and the resulting changes to some of the existing roundabouts will send more local traffic into the town, making these delays worse than they are now.

Full text:

This is a large document, so perhaps I have missed this part: What is the policy regarding asking Network Rail to invest in 21st Century signalling systems to improve delays at the Level Crossings in Chichester. These cause unacceptable delays to traffic, and works on the A27,and the resulting changes to some of the existing roundabouts will send more local traffic into the town, making these delays worse than they are now.